Application Number W/24/01629/FUL
Status Application Approved

Sign up to notifications on this planning application Back to search results New search

Planning Online Status


  • Application
    Valid
    29/08/2024
  • Consultation
    End
    22/10/2024
  • Committee
    Meeting
    N/A
  • Decision

    Approval
  • Decision
    Date
    07/03/2025
  • Appeal
    Started
    N/A
  • Appeal
    Decision
    N/A
Summary
Application Number W/24/01629/FUL
Location Address Snowdown Dough Bank Ombersley Droitwich Spa WR9 0HN
Proposal Proposed partial demolition and extension to form replacement dwelling (including retention of existing structures), including extension to stable block to form garaging (Variation of condition 2 Ref 21/01517/FUL) - (Variation of condition 2 Ref W/23/01892/FUL)
Status Approval
Application Type Full planning permission
Appeal Decision N/A

Important Dates
Application Received Date 14/08/2024
Application Valid Date 29/08/2024
Consultation Start Date 02/09/2024
Site Visited / Site Notice Date
Consultation End 22/10/2024
Advert Expiry
Committee Date (if applicable)
Committee Agenda
Decision Date 07/03/2025

Further Information
Expected Decision Level Delegated
Case Officer Steven Hoang
Parish Ombersley
Ward Ombersley Ward
Applicant Mr Sam Chambers
Agent Mr Dan Stiff, Boughton Butler
Agent Address 30 Sansome Walk Worcester Worcestershire WR1 1LX

Condition Details / Information Notes
The development hereby permitted must be commenced not later than the expiration of three years from the date of the original permission ref: 21/01517/FUL, dated 09.09.2021. Reason: To conform with the requirements of Sections 73 and 91 of the Town and Country Planning Act 1990 (as amended).
Unless where required or allowed by other conditions attached to this permission/consent, the development hereby approved shall be carried out in accordance with the information (including details on the proposed materials) provided on the application form and the following plans/drawings/documents – Amended Plans/Documents: Drawing no.044 Rev.E (Ground Floor Plan) Drawing no.045 Rev.F (First Floor Plan) Drawing no.046 Rev.F (Elevations Sheet 1 of 2) Drawing no.047 Rev.E (Elevations Sheet 2 of 2) Arkay Windows 58BW Casement Window Brochure Arkay Windows ‘InfiniGlide’ Brochure Approved Plans Ref: 21/01517/FUL: Drawing 002 Rev A – Existing Site Plan; Drawing 001 – Existing Site Location Plan; Drawing 003 Rev A – Proposed Site Plan; Drawing 004 – Existing Ground Floor Plan; Drawing 017 – Existing Stable Floor Plan; Drawing 008 – Existing Site Sections; Drawing 013 – Proposed Ground Floor Plan; Drawing 018 – Existing Stable Elevations; Drawing 007 – Existing Side Elevations; Drawing 014 Rev B – Proposed First Floor Plan; Drawing 019 Rev A – Proposed Stable Floor Plan; Drawing 016 Rev A – Proposed Side Elevations; Drawing 020 – Proposed Stable Elevations; Drawing 006 – Existing Front and Rear Elevations; Drawing 005 – Existing First Floor Plan; and Drawing 015 Rev B – Proposed Front and Rear Elevations. Reason: To define the permission in accordance with Policy SWDP1 and SWDP2 of the South Worcestershire Development Plan and the National Planning Policy Framework.
The external materials of the replacement dwelling hereby permitted shall be crarried out in accordance with the approved amended plans/documents under condition no.2 of this permission. The development shall be carried out using the materials as approved. Reason: To ensure that the new materials are in keeping with the surroundings and/or represent quality design in accordance with policy SWDP21 of the South Worcestershire Development Plan and the relevant aims and objectives of National Planning Policy Framework.
The development hereby permitted shall be carried out in strict accordance with the recommendations set out in the Preliminary Roost Assessment report carried out by Focus Ecology dated 14 June 2021 and submitted with this application. In particular: - As a precautionary approach, a licenced bat ecology must supervise the removal of the ridge tiles at the property. Additionally, an endoscopic inspection of the gap in the mortar on the north-east gable end should be carried out immediately prior to construction works. This should be carried out from scaffolding or MEWP (or similar lifting device) as appropriate. In the event that roosting bats or evidence of bats (i.e. droppings) are discovered, works must cease immediately and Natural England must be contacted to advise on any licensing requirements to allow lawful completion of the work. - Where required to facilitate permitted development, removal of potential bird nesting habitat should be undertaken outside the bird nesting season (March - August inclusive) or otherwise under the direct supervision of a suitably qualified ecologist who will be able to identify nesting birds and advise of appropriate safe working distances. - A single bat box should be installed within the landownership of Snowdown. The box should be integrated within an existing built structure (e.g. Ibstock enclosed bat box, Habitat bat box, Schwegler Wall-mounted Bat Shelter 2FE, Habi-Sabi Bat Box or Schwegler 2FR Bat Tube) or installed on a suitable mature tree (e.g. Schwegler 2F Bat Box). The box should be installed at least 4m above ground-level, and not placed above windows. - Two sparrow terrace (e.g. 1SP Schwegler Sparrow Terrace or similar) should be installed at the site to provide replacement nesting opportunities for this species. The box should be wall-mounted, at eaves height on a north or north-east elevation out of the reach of predators (e.g. domestic cats). - This report is deemed valid for 12 months. Should any development commence after this time has elapsed an update survey will be required to determine the status of the site during the intervening period. Reason: To ensure the development contributes to the conservation and enhancement of biodiversity within the site and the wider area in accordance with policy SWDP22 of the South Worcestershire Development Plan and the relevant aims and objectives of National Planning Policy Framework.
Before the first use/occupation of the development hereby permitted a scheme of landscaping shall be submitted to and approved in writing by the Local Planning Authority. The landscaping scheme shall include:- (i) a plan(s) showing details of all existing trees and hedges on the application site. The plan should include, for each tree/hedge, the accurate position, canopy spread and species, together with an indication of any proposals for felling/pruning and any proposed changes in ground level, or other works to be carried out, within the canopy spread. (ii) a plan(s) showing the layout of proposed tree, hedge and shrub planting and grass areas. (iii) a schedule of proposed planting - indicating species, sizes at time of planting and numbers/densities of plants. (iv) a written specification outlining cultivation and other operations associated with plant and grass establishment. (v) a schedule of maintenance, including watering and the control of competitive weed growth, for a minimum period of five years from first planting. All planting and seeding/turfing shall be carried out in accordance with the approved details in the first planting and seeding/turfing seasons following the completion or first occupation/use of the development, whichever is the sooner. The planting shall be maintained in accordance with the approved schedule of maintenance. Any trees or plants which, within a period of five years from the completion of the planting, die, are removed or become seriously damaged or diseased shall be replaced in the next planting season with others of similar size and species. Reason: To ensure the proposed development does not have an adverse effect on the character and appearance of the area in accordance with policies SWDP21 and SWDP25 of South Worcestershire Development Plan and the relevant aims and objectives of National Planning Policy Framework.
Before the first use/occupation of the development hereby permitted details of a precise specification of the proposed materials for the hard landscaping of the site (including roads, paths, parking areas and other hard surfaces) shall be submitted to and approved in writing by the local planning authority. The hard landscaping of the site shall be completed in accordance with a timetable agreed in writing by the local planning authority. Development shall be carried out in accordance with the approved details. Reason: To ensure the proposed development represents high quality design and does not have an adverse effect on the character and appearance of the area in accordance with policies SWDP21 and SWDP25 of South Worcestershire Development Plan and the relevant aims and objectives of National Planning Policy Framework.
Prior to the first use/occupation of the development hereby permitted, the details set out in the submitted Water Management Statement shall be fully implemented and remain thereafter. Reason: To ensure that an appropriate sustainable drainage system is provided to serve the development in accordance with policy SWDP29 of the South Worcestershire Development Plan 2016 and the relevant aims and objectives of National Planning Policy Framework.
Prior to the occupation of any part of the development hereby permitted details of renewable or low carbon energy generating facilities to be incorporated as part of the development shall be submitted to and approved in writing by the local planning authority. The details shall demonstrate that at least 10% of the predicted energy requirements of the development will be met through the use of renewable/low carbon energy generating facilities. The approved facilities shall be provided prior to any part of the development hereby permitted being first occupied or in accordance with a timetable submitted to and approved by the local planning authority as part of the details required by this condition. Reason: To ensure the proposed development includes sufficient renewable/low carbon energy generating facilities to comply with Policy 27 of the South Worcestershire Development Plan 2016 and the relevant aims and objectives of National Planning Policy Framework.
The roof area of the single storey rear extension hereby permitted shall not be used as a balcony, roof garden or similar amenity area. Reason: To preserve the amenities of the locality in accordance with Policy SWDP21 of the South Worcestershire Development Plan and the relevant aims and objectives of National Planning Policy Framework.

Copyright Notice

Plans, drawings and material submitted to the council are protected by the copyright acts (section 47, 1988 act). You may only use material which is downloaded and/or printed for consultation purposes, to compare current applications with previous schemes and to check whether developments have been completed in accordance with approved plans. Further copies must not be made without the prior permission of the copyright owner.

Tick here to show you have read and agree with the Copyright Notice.

Document Download Tips

  • In order to view the documents please ensure you have ticked the Copyright Notice box above.
  • In order to view PDF documents, you will need to have the free Adobe Acrobat Reader software installed on your computer. Click here to download.
  • To view individual documents click on the 'Document Type' on the row you require and the document will open as an Adobe Acrobat pdf.
  • To download multiple documents in one go, tick all the boxes relating to the documents you wish to view and click Download selected files button.
  • If you wish to download ALL documents place a tick in the box in the header row and click 'Download Selected Files' button.
  • Note: some devices such as iPads that use iOS browsers do not have the standard capability to download multiple files as a default function. If you are experiencing difficulties you may need to download a free application to enable you to do this - known as a zip file. Go to the AppStore to download a zip file ‘app’.

How to reorder or group rows

Click on a column heading for the ability to sort the ‘group’ listing in ascending or descending order by using the up/down arrows. This is useful to sort by ‘name/organisation’.

Document Type Date Description File Size Drawing/Rev Number
Application Documents
Application Plans
Neighbour and Other Response
Statutory Consultee Response
Decision
Planning Application Documents

Consultation Responses

Neighbour List


In addition to consultations with the consultee listed, we will publicise the application in accordance with national requirements and our local policy. This publicity usually takes the form of letters to nearby properties, the posting of site notices and/or the placing of a public notice in our local newspapers.


Address Sent Reply Received
Dunroamin Dough Bank Ombersley DROITWICH SPA WR9 0HN 19/09/2024
Bumble Bee Dough Bank Ombersley DROITWICH SPA WR9 0HN 02/09/2024
Dunroamin Dough Bank Ombersley DROITWICH SPA WR9 0HN 02/09/2024
Hawkhills Dough Bank Ombersley DROITWICH SPA WR9 0HN 02/09/2024
Orchard Cottage Holt Heath Holt Fleet WORCESTER WR6 6NN 02/09/2024
Orchard Lodge Dough Bank Ombersley DROITWICH SPA WR9 0HN 02/09/2024
Ox Orchard Powers Lane Ombersley DROITWICH SPA WR9 0HL 02/09/2024
Pear Tree Lodge Dough Bank Ombersley DROITWICH SPA WR9 0HN 02/09/2024
Pleasure View Dough Bank Ombersley DROITWICH SPA WR9 0HN 02/09/2024
Rambler Cottage Dough Bank Ombersley DROITWICH SPA WR9 0HN 02/09/2024
Woodbury View Dough Bank Ombersley DROITWICH SPA WR9 0HN 02/09/2024

Consultee List


Name Organisation Sent Reply Due Reply Received
Angie Astley Ombersley and Doverdale Parish Council 02/09/2024 23/09/2024
Cllr Christopher Day Ombersley Ward 02/09/2024 23/09/2024
Highways County Highways 02/09/2024 23/09/2024
Mrs E Marshall Landscape Officer 02/09/2024 23/09/2024
Tree Preservation Officer Tree Preservation Officer 02/09/2024 23/09/2024
Worcestershire & Herefordshire LMC Ltd Local Medical Committee 02/09/2024 23/09/2024

Constraints List


Constraints List
Article 4 Direction
Tree Preservation Order - TPO/W/67/10/001/TPO
Enforcement Notice: ENF/17/0538
SWDP 15: Designated Rural Areas
Neighbourhood Plan: NPA Boundaries
Paper: Droitwich Advertiser - Thursday
Enforcement Notice: IN/16/00320
Enforcement Notice: IN/95/00388
SWDP 5: Protect and Enhance
Outside SWDP Development Boundary
Major Aquifer
Paper: Kidderminster Shuttle - Thursd
Wind Turbines
Enforcement Notice: ENF/82/0266
CIL008 - Non-Urban Area
No associated appeals