Application Number W/24/02125/OUT
Status Application Approved

Sign up to notifications on this planning application Back to search results New search

Planning Online Status


  • Application
    Valid
    18/10/2024
  • Consultation
    End
    11/04/2025
  • Committee
    Meeting
    19/06/2025
  • Decision

    Approval
  • Decision
    Date
    23/12/2025
  • Appeal
    Started
    N/A
  • Appeal
    Decision
    N/A
Summary
Application Number W/24/02125/OUT
Location Address Land At (OS 9363 4634) Besford Bridge Besford
Proposal Outline permission for the erection of up to 105 residential dwellings with all matters reserved with the exception of access, including open space, landscaping, drainage and associated works.
Status Approval
Application Type Outline Application
Appeal Decision N/A

Important Dates
Application Received Date 18/10/2024
Application Valid Date 18/10/2024
Consultation Start Date 21/03/2025
Site Visited / Site Notice Date 19/06/2025
Consultation End 11/04/2025
Advert Expiry 28/11/2024
Committee Date (if applicable) 19/06/2025
Committee Agenda Planning Committee Information
Decision Date 23/12/2025

Further Information
Expected Decision Level Committee
Case Officer Adam White
Parish Pershore
Ward Pershore Ward
Applicant Mrs Rachael Bibby, Lioncourt Homes Ltd and Touch Developments Ltd
Agent Mrs Rachael Bibby, Lioncourt Homes Ltd and Touch Developments Ltd
Agent Address Lioncourt House, Unit 3 Apex Park Wainwright Road Worcester

Condition Details / Information Notes
Application for the approval of all reserved matters shall be made to the Local Planning Authority before the expiration of three years from the date of this permission. The development hereby permitted shall be begun before the expiration of two years from the date of approval of the last of the reserved matters to be approved. Reason: In accordance with the requirements of Section 92 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
Approval of the details of the appearance, landscaping, layout and scale (hereinafter called ""the reserved matters"") shall be obtained from the Local Planning Authority in writing before any development is commenced. The development shall be carried out in accordance with approved reserved matter details. Reason: Required to be imposed pursuant to Section 92 of the Town and Country Planning Act 1990 (as amended) and to enable to the Local Planning Authority to exercise proper control over these aspects of the development
Unless where required or allowed by other conditions attached to this permission/consent, the development hereby approved shall be carried out in accordance with the information (including details on the proposed materials) provided on the application form and the following plans/drawings/documents: Site Location Plan - PERE_PLA_00 Parameters Plan - PERE-PLA-02A Building Heights Parameter Plan - PERE-PLA-03A Proposed Access Arrangement General Arrangement - 240274-RAP-XX-XX-DR-TP-3201 Rev P03 Proposed Access Arrangement Visibility Assessment and Gateway Feature - 240274-RAP-XX-XX-DR-TP-3210 Rev P03 Reason: To define the permission in accordance with Policy SWDP1 and SWDP2 of the South Worcestershire Development Plan and the National Planning Policy Framework.
Other than that required to be carried out as part of an approved scheme of remediation, the development hereby approved must not commence until conditions 1 and 2 have been complied with. If a remediation scheme is identified as being necessary following the detailed site investigation and risk assessment required by condition 2 then development must not commence until conditions 3 and 4 have also been complied with and subsequently no dwelling shall be occupied until condition 5 has been complied with. 1. A preliminary risk assessment (a Phase I desk study) submitted to the Local Authority in support of the application has identified unacceptable risk(s) exist on the site as represented in the Conceptual Site Model. A scheme for detailed site investigation must be submitted to and approved in writing by the Local Planning Authority prior to being undertaken to address those unacceptable risks identified. The scheme must be designed to assess the nature and extent of any contamination and must be led by the findings of the preliminary risk assessment. The investigation and risk assessment scheme must be compiled by competent persons and must be designed in accordance with the Environment Agency's "Land Contamination: Risk Management" guidance. 2. Detailed site investigation and risk assessment must be undertaken in accordance with the approved Scheme and a written report of the findings produced. This report must be approved by the Local Planning Authority prior to any development taking place. The investigation and risk assessment must be undertaken by competent persons and must be conducted in accordance with the Environment Agency's "Land Contamination: Risk Management" guidance. 3. Where identified as necessary a detailed remediation scheme to bring the site to a condition suitable for the intended use by removing unacceptable risks to identified receptors must be prepared and is subject to the approval of the Local Planning Authority in advance of undertaking. The remediation scheme must ensure that the site will not qualify as Contaminated Land under Part 2A Environmental Protection Act 1990 in relation to the intended use of the land after remediation. 4. The approved remediation scheme must be carried out in accordance with its terms prior to the commencement of development, other than that required to carry out remediation, unless otherwise agreed in writing by the Local Planning Authority. 5. Following the completion of the measures identified in the approved remediation scheme a validation report that demonstrates the effectiveness of the remediation carried out must be produced, and is subject to the approval of the Local Planning Authority prior to the occupation of any buildings. In the event that contamination is found at any time when carrying out the approved development that was not previously identified it must be reported in writing immediately to the Local Planning Authority. An investigation and risk assessment must be undertaken and where necessary a remediation scheme must be prepared, these will be subject to the approval of the Local Planning Authority. Following the completion of any measures identified in the approved remediation scheme a validation report must be prepared, which is subject to the approval in writing of the Local Planning Authority prior to the occupation of any buildings. Reason: To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors in accordance with policy SWDP31 of the South Worcestershire Development Plan and the relevant aims and objectives of the National Planning Policy Framework (NPPF).
No development shall take place (including any ground works, demolition or site clearance) until a Construction Environmental Management Plan (CEMP: Biodiversity) has been submitted to and approved in writing by the local planning authority. The CEMP (Biodiversity) shall be based on appropriate up-to-date surveys, and include the following: a) Risk assessment of potentially damaging construction activities; b) Identification of "biodiversity protection zones"; c) Practical measures (both physical measures and sensitive working practices) to avoid or reduce impacts during construction (may be provided as a set of method statements); d) The location and timing of sensitive works to avoid harm to biodiversity features; e) The times during construction when specialist ecologists need to be present on site to oversee works; f) Responsible persons and lines of communication; g) The role and responsibilities on site of an ecological clerk of works (ECoW) or similarly competent person; h) Use of protective fences, exclusion barriers and warning signs. The approved CEMP shall be adhered to and implemented throughout the construction period strictly in accordance with the approved details., unless otherwise agreed in writing by the local planning authority. Reason: To ensure compliance with the Wildlife and Countryside Act 1981 (as amended) and the Conservation of Habitats and Species Regulations 2017, the Environment Act 2021, policy SWDP22 of the South Worcestershire Development Plan, and the relevant aims and objectives of the National Planning Policy Framework (NPPF).
Temporary fencing for the protection of all retained trees/hedges on site and trees outside the site whose Root Protection Areas fall within the site shall be erected in accordance with BS 5837:2012 (Trees in Relation to Design, Demolition and Construction) before development of any type commences, including site clearance, demolition, materials delivery, vehicular movement and erection of site huts. Any alternative fencing type or position not strictly in accordance with BS 5837 (2012) must be agreed in writing by the local planning authority prior to the commencement of development. This protective fencing shall remain in place until the completion of development or unless otherwise agreed in writing with the local planning authority. Nothing should be stored or placed (including soil), nor shall any ground levels altered, within the fenced area without the previous written consent of the local planning authority. There shall be no burning of any material within 10 metres of the extent of the canopy of any retained tree/hedge. Reason: To prevent existing trees/hedges from being damaged during construction work and to preserve the amenities of the locality and to comply with Policies SWDP5 and SWDP22 and the relevant aims and objectives of the National Planning Policy Framework.
The development shall not commence until a Habitat Management and Monitoring Plan (the HMMP), has been prepared in accordance with the approved Biodiversity Gain Plan and the approved landscape scheme, submitted to and approved in writing by the Local Planning Authority. It shall include: (a) a non-technical summary; (b) the roles and responsibilities of the people or organisation(s) delivering the HMMP; (c) the planned habitat creation and enhancement works to create or improve habitat to achieve the biodiversity net gain in accordance with the approved Biodiversity Gain Plan; (d) details of bat roosting and bird nesting opportunities, reptile hibernacula and hedgehog highways, based on the information contained in Appendix 10 Enhancements Prescriptions of the EcIA by Bringle and Green, dated October 2024; (e) the management measures to maintain habitat in accordance with the approved Biodiversity Gain Plan for a period of 30 years from the completion of development; and (f) the monitoring methodology and frequency in respect of the created or enhanced habitat to be submitted to the local planning authority. Notice in writing shall be given to the Council when the habitat creation and enhancement works as set out in the HMMP have been completed. The created and enhanced habitat specified in the approved HMMP shall thereafter be managed and maintained in accordance with the approved HMMP. Monitoring reports shall be submitted to the local planning authority in writing in accordance with the methodology and frequency specified in the approved HMMP. The plan shall also set out where the results of the monitoring show that conservation aims and objectives of the HMMP are not being met, how contingencies and/or remedial action are identified, agreed and implemented so that the development still delivers the fully functioning biodiversity objectives of the originally approved scheme. Reason: To ensure the development delivers a biodiversity net gain on site in accordance with Schedule 7A of the Town and Country Planning Act 1990 and SWDP22 of the South Worcestershire Development Plan and the relevant aims and objectives of the National Planning Policy Framework (NPPF).
No works or development shall take place until a Construction Surface Water Management Plan has been submitted to and approved in writing by the Local Planning Authority. The plan shall include how surface water will be managed during the construction phase, including site clearance, soil stripping and pond amendments. The plan shall include drawings of any temporary drainage systems, a timeline of construction and measures to mitigate the risk of pollution (including silt) of the water environment and offsite flood risk. The plan shall detail how the approved permanent surface water drainage system shall be remediated during the construction phase. The approved construction surface water management plan shall be implemented as soon as works start on site thereafter maintained during the full duration of the construction phase. Reason: To ensure the proposed development does not exacerbate flood risk and deals with surface water run-off from the site in a sustainable manner, in accordance with policies SWDP28 and SWDP29 of the South Worcestershire Development Plan and the relevant aims and objectives of the National Planning Policy Framework (NPPF).
Before development commences, a detailed schedule of works and design for the site access works at Rebecca Road, including pedestrian footway provision at Rebecca Road and Holloway, tactile-paved dropped crossings at the site access and at Rebecca Road to the north and south of the site access and modifications to the carriageway on Rebecca Road (including a gateway feature on Rebecca Road and the introduction of a 40mph speed limit on Rebecca Road between the junction with Holloway and the junction with the B4084 Worcester Road), shall be submitted to and approved in writing by, the Local Planning Authority. The development shall not be first occupied until the submitted detailed scheme, which is broadly in accordance with Rappor drawings 240274-RAP-XX-XX-DR-TP-3201 P03 Proposed Access Arrangement General Arrangement and drawing 240274-RAP-XX-XX-DR-TP-3210 P03 Proposed Access Arrangement Visibility Assessment and Gateway Feature, subject to any non-material amendments which may be identified during the detailed design and Road Safety Audit processes, has been agreed in writing by the Local Planning Authority and has been implemented in full. Reason: In the interests of achieving safe and suitable highway access for all users in accordance with policy SWDP4 of the South Worcestershire Development Plan and the aims and objectives of the National Planning Policy Framework (NPPF).
The development hereby approved shall not commence until a Construction Environmental Management Plan has been submitted to and approved in writing by the Local Planning Authority. This shall include but not be limited to the following: • Measures to ensure that vehicles leaving the site do not deposit mud or other detritus on the public highway. • Details of site operative parking areas, material storage areas and the location of site operatives’ facilities (offices, toilets etc). • The hours that delivery vehicles will be permitted to arrive and depart, and arrangements for unloading and manoeuvring. • Details of any temporary construction accesses and their reinstatement. • A highway condition survey, timescale for re-inspections, and details of any reinstatement. • Measures to control dust. The measures set out in the approved plan shall be carried out and complied with in full during the construction of the development hereby approved. Site operatives' parking, material storage and the positioning of operatives' facilities shall only take place on the site in locations approved by in writing by the local planning authority. Reason: To ensure the provision of adequate on-site facilities and in the interests of highway safety in accordance with Policy SWDP4 of the South Worcestershire Development Plan and the aims and objectives of the National Planning Policy Framework (NPPF).
Before the commencement of development hereby permitted, details of renewable and/or low carbon energy generation measures shall be submitted to and approved in writing by the Local Planning Authority. The measures shall contribute to at least 10% of the predicted energy requirements of the development. The details to be submitted shall include:- - the overall predicted energy requirements of the approved development; - the predicted energy generation from the proposed renewable/low carbon energy measures; and - an implementation timetable for the proposed measures. The development shall be carried out in accordance with the approved details. Reason: To ensure the development supports the delivery of low carbon/renewable energy and safeguards natural resources in accordance with policy SWDP27 of the South Worcestershire Development Plan and the relevant aims and objectives of the National Planning Policy Framework (NPPF).
Details of the levels of the existing site and the precise floor slab levels of the approved dwelling(s), relative to the existing development on the boundary of the site, shall be submitted for approval as part of the reserved matters. Reason: To ensure the proposed development does not have an adverse effect on the character and appearance of the area in accordance with policies SWDP21 and SWDP25 of South Worcestershire Development Plan and the relevant aims and objectives of the National Planning Policy Framework (NPPF).
Details of screen walls, fences, surface treatments to drives, cycle and footways and implementation timetable shall be submitted for approval as part of the landscaping reserved matters. Reason: To ensure the proposed development does not have an adverse effect on the character and appearance of the area in accordance with policies SWDP21 and SWDP25 of South Worcestershire Development Plan and the relevant aims and objectives of the National Planning Policy Framework (NPPF).
The following details shall be submitted for approval as part of the landscaping reserved matters:- a) a plan(s) showing the planting layout of proposed tree, hedge, shrub and grass areas; b) a schedule of proposed planting indicating species, size at time of planting and numbers/densities of plants; c) a written specification outlining cultivation and others operations associated with plant and grass establishment; d) a schedule of maintenance, including watering and the control of competitive weed growth, for a minimum period of five years from first planting. The landscaping shall be provided and maintained in accordance with the approved details. Reason: To preserve and enhance the visual amenities of the area and to ensure that the proposed development contributes to the conservation and enhancement of biodiversity within the site in accordance with policies SWDP21, SWDP22 and SWDP25 of the South Worcestershire Development Plan and the relevant aims and objectives of the National Planning Policy Framework (NPPF).
Demolition, clearance or construction work and deliveries to and from the site in connection with the development hereby approved shall only take place between the hours of 08.00 and 18.00hrs Monday to Friday and 08.00 and 13.00hrs on a Saturday. There shall be no demolition, clearance or construction work or deliveries to and from the site on Sundays or Bank Holidays. Reason: To preserve the amenities of the locality in accord with Policy SWDP21 of the South Worcestershire Development Plan and the relevant aims and objectives of the National Planning Policy Framework (NPPF).
No external lighting shall be installed in the development hereby permitted until a “lighting design strategy for biodiversity” has been submitted and approved in writing by the local planning authority. The strategy shall: a) Identify those areas/ features that are particularly sensitive; and b) Show how and where the external lighting will be installed (through the provision of appropriate lighting contour plans and technical specifications) so that it can be clearly demonstrated that areas to be lit will not disturb or prevent light averse bat species using their territory or having access to their breeding sites and resting places. All external lighting shall be installed in accordance with the specifications and locations set out in the strategy, and these shall be maintained thereafter in accordance with the strategy. Under no circumstances should any other external lighting be installed without prior consent from the local planning authority. Reason: To ensure compliance with the Wildlife and Countryside Act 1981 (as amended) and the Conservation of Habitats and Species Regulations 2017 and minimise impacts on with protected species in accordance with Policy SWDP22 and the relevant aims and objectives of the National Planning Policy Framework (NPPF).
The approved Biodiversity Gain Plan shall be implemented in accordance with the details and timescale agreed within the Plan and maintained thereafter in accordance with the approved Habitat Management and Monitoring Plan (HMMP). Reason: To ensure that the proposed development delivers a biodiversity net gain in accordance with Schedule 7A of the Town and Country Planning Act 1990 and SWDP22 of the South Worcestershire Development Plan and the relevant aims and objectives of the National Planning Policy Framework (NPPF).
No works in connection with site drainage shall commence until a scheme for a surface water drainage strategy for the proposed development has been submitted to, and approved in writing by the Local Planning Authority. The strategy shall include details of surface water drainage measures, including for hardstanding areas, and shall conform with the non-statutory technical standards for SuDS (Defra 2015) and the Flood Risk Assessment and Drainage Strategy (LCH – RRP – FRA4). If possible infiltration techniques are to be used and the plan shall include the details and results of field percolation tests. The scheme shall provide detailed design drawings for all drainage assets and should include run off treatment proposals for surface water drainage. Exceedance flows should not be directed to property or private land. Where the scheme includes communal surface water drainage assets proposals for dealing with the future maintenance of these assets should be included. The scheme should include proposals for informing future homeowners or occupiers of the arrangements for maintenance of communal surface water drainage assets. The approved surface water drainage scheme shall be implemented prior to the first use of the development and thereafter maintained in accordance with the agreed scheme. Reason: To ensure the proposed development does not exacerbate flood risk and deals with surface water run-off from the site in a sustainable manner, in accordance with policies SWDP28 and SWDP29 of the South Worcestershire Development Plan and the relevant aims and objectives of the National Planning Policy Framework (NPPF).
Prior to the commencement of the development, full details of a scheme for the provision of foul drainage for the site shall be submitted to and approved in writing by the Local Planning Authority. These details shall: Include the design of all on and off-site foul sewerage infrastructure, the diameters of proposed pipes and the capacity of any on or off-site storage; Include a timetable and programme for the provision of the foul sewerage infrastructure; and Demonstrate that, where connection to a public sewer is proposed, the additional foul sewerage discharge can be accommodated within the public sewer system without increasing the risk of flooding or backing up of the existing system on the site or elsewhere. The development shall be carried out in accordance with the approved details and the approved timetable and programme. Reason: To ensure the development is served by satisfactory arrangements for the disposal of foul sewage and to ensure that the development does not increase the risk of flooding. These details are required prior to the commencement of the development as they form an intrinsic part of the proposal, the approval of which cannot be disaggregated from the carrying out of the rest of the development, in accordance with policies SWDP28 and SWDP29 of the South Worcestershire Development Plan and the relevant aims and objectives of the National Planning Policy Framework (NPPF).
(A) The reserved matters application shall not be determined until a programme of archaeological work, including a Written Scheme of Investigation, has been submitted to and approved by the local planning authority in writing. The scheme shall include an assessment of significance and research questions; and: 1. The programme and methodology of site investigation and recording. 2. The programme for post investigation assessment. 3. Provision to be made for analysis of the site investigation and recording. 4. Provision to be made for publication and dissemination of the analysis and records of the site investigation. 5. Provision to be made for archive deposition of the analysis and records of the site investigation. 6. Nomination of a competent person or persons/organisation to undertake the works set out within the Written Scheme of Investigation. (B) The development shall not be commenced until the site investigation and post investigation assessment has been completed in accordance with the programme set out in the Written Scheme of Investigation approved under condition (A) and the provision made for analysis, publication and dissemination of results and archive deposition has been secured. Reason: In accordance with policies SWDP6 and SWDP24 of the South Worcestershire Development Plan 2016 and the relevant aims and objectives of the National Planning Policy Framework (NPPF).
Prior to the first occupation of any of the dwellings hereby approved, details of superfast broadband facilities or alternative solutions to serve the dwellings hereby approved shall be submitted to and approved in writing by the local planning authority. The submitted details shall include an implementation programme. The facilities shall be provided in accordance with the approved details. Reason: To ensure the proposal incorporates satisfactory telecommunication facilities in line with policy SWDP26 of the South Worcestershire Development Plan 2016 and the relevant aims and objectives of the National Planning Policy Framework (NPPF).
The first Reserved Matters application submitted pursuant to Conditions 1 and 2 shall include a Market Housing Mix Statement setting out how an appropriate mix of dwelling sizes will be provided to contribute to a mixed and balanced communities. The mix will be informed by the latest Strategic Housing Market Assessment, or other local data available for the area at the time of the submission and include at least 5 bungalows. The development shall be implemented in accordance with the approved Housing Mix Statement. Reason: To ensure that an appropriate housing mix is delivered to contribute to the creation of mixed and balanced communities in accordance with Policy SWDP15 of the South Worcestershire Development Plan 2016 and the relevant aims and objectives of the National Planning Policy Framework (NPPF).
The development hereby permitted shall be carried out in accordance with the mitigation measures outlined in the submitted Noise Assessment by Rappor dated February 2025. Reason: To ensure that residents of the development are not adversely affected by noise emanating from the B4084 Worcester Road in accordance with policies SWDP21 and SWDP31 of the South Worcestershire Development Plan and the aims and objectives of the National Planning Policy Framework (NPPF).
Positive and Proactive Statement. In dealing with this application, the Council has worked with the applicant in the following ways: - providing pre-application advice; - seeking further information following receipt of the application; - considering the imposition of conditions and or the completion of a s.106 legal agreement. In such ways the Council has demonstrated a positive and proactive manner in seeking solutions to problems arising in relation to the planning application.
The effect of paragraph 13 of Schedule 7A to the Town and Country Planning Act 1990 is that planning permission granted for the development of land in England is deemed to have been granted subject to the condition “(the biodiversity gain condition”) that development may not begin unless: (a) a Biodiversity Gain Plan has been submitted to the planning authority, and (b) the planning authority has approved the plan. Subject to Paragraph 14(2) of Schedule 7A TCPA 1990 The biodiversity gain plan must include: (a) information about the steps taken or to be taken to minimise the adverse effect of the development on the biodiversity of the onsite habitat and any other habitat; (b) the pre-development biodiversity value of the onsite habitat; (c) the post-development biodiversity value of the onsite habitat; (d) Any registered off-site biodiversity gain allocated to the development and the biodiversity value of that gain in relation to the development; (e) Any biodiversity credits purchased for the development, and (f) Such other matters as the Secretary of State may by regulations specify. Advice about how to prepare a Biodiversity Gain Plan and a template can be found at https://www.gov.uk/guidance/submit-a-biodiversity-gain-plan
The development hereby approved shall not be occupied until visibility splays, as shown on Rappor drawing 240274-RAP-XX-XX-DR-TP-3210 P03 Proposed Access Arrangement Visibility Assessment and Gateway Feature, are provided from a vertical point 1.05m above carriageway level at the centre of the site vehicular access at Rebecca Road and 2.4m back from the near side edge of the adjoining carriageway, (measured perpendicularly), for 90.6m to the east and 97.3m to the west measured along the nearside edge of the adjoining carriageway (vertical off set of 0.6m). Nothing shall be planted, erected and/or allowed to grow on the triangular areas of land so formed which would obstruct the visibility described above. Reason: In the interests of highway safety in accordance with policy SWDP4 of the South Worcestershire Development Plan and the aims and objectives of the National Planning Policy Framework (NPPF).
The Residential Travel Plan hereby approved, dated May 2025, shall be implemented and monitored in accordance with the regime contained within the Plan. In the event of failing to meet the targets within the Plan a revised Plan shall be submitted to and approved in writing by the Local Planning Authority to address any shortfalls, and where necessary make provision for and promote improved sustainable forms of access to and from the site. The Plan thereafter shall be implemented and updated in agreement with the Local Planning Authority and thereafter implemented as amended. Reason: To ensure residents of the development site are offered a genuine choice of sustainable travel modes and to promote sustainable access to the development site in accordance with policy SWDP4 of the South Worcestershire Development Plan and the aims and objectives of the National Planning Policy Framework (NPPF).
The reserved matters application shall not be determined until a Geodiversity Assessment has been submitted to the Local Planning Authority for approval in writing. The Geodiversity Assessment should include an assessment of significance of the site for geodiversity and: a) A programme and methodology of site investigation to determine the extent of the Pershore Sand and Gravel deposits on the site. This could make use of the trial trenching work proposed for archaeological investigation, although greater depth may be required at intervals to establish the significance of any deposits found. b) Plans to reserve an area, at least 10m wide and 10m long, where Pershore Sand and Gravel is present to a depth of at least 1m, that will be undisturbed by any development activity and will remain accessible for scientific investigation once the development is complete. This area should by indicated on all site plans. c) Plans for working with geologists throughout all development phases and enabling investigations where development works expose Pershore Sand and Gravel deposits, for example ditches created for SUDS purposes or other trenches that are required for building works. Investigations could include but are not limited to photography, extraction of samples, execution of dating techniques. d) Plans for publication, dissemination and archiving of the results of site investigations. e) Nomination of a competent person or persons/organisation to undertake the works set out within the Geodiversity Assessment. The development shall thereafter not be occupied until the site investigation and post investigation assessment has been completed in accordance with the programme set out, with provision for publication, dissemination and archiving of the results, and any areas to be left untouched by development and accessible for reserve have been marked on all plans. Reason: In the interests of geodiversity in accordance with policy SWDP22 of the South Worcestershire Development Plan 2016 and the aims and objectives of the National Planning Policy Framework (NPPF).
The development hereby permitted shall be carried out in accordance with the strategy outlined in the submitted Energy Statement by Briary Energy dated February 2025. Reason: To ensure the development supports the delivery of low carbon/renewable energy and safeguards natural resources in accordance with policy SWDP27 of the South Worcestershire Development Plan and the aims and objectives of the National Planning Policy Framework (NPPF).

Copyright Notice

Plans, drawings and material submitted to the council are protected by the copyright acts (section 47, 1988 act). You may only use material which is downloaded and/or printed for consultation purposes, to compare current applications with previous schemes and to check whether developments have been completed in accordance with approved plans. Further copies must not be made without the prior permission of the copyright owner.

Tick here to show you have read and agree with the Copyright Notice.

Document Download Tips

  • In order to view the documents please ensure you have ticked the Copyright Notice box above.
  • In order to view PDF documents, you will need to have the free Adobe Acrobat Reader software installed on your computer. Click here to download.
  • To view individual documents click on the 'Document Type' on the row you require and the document will open as an Adobe Acrobat pdf.
  • To download multiple documents in one go, tick all the boxes relating to the documents you wish to view and click Download selected files button.
  • If you wish to download ALL documents place a tick in the box in the header row and click 'Download Selected Files' button.
  • Note: some devices such as iPads that use iOS browsers do not have the standard capability to download multiple files as a default function. If you are experiencing difficulties you may need to download a free application to enable you to do this - known as a zip file. Go to the AppStore to download a zip file ‘app’.

How to reorder or group rows

Click on a column heading for the ability to sort the ‘group’ listing in ascending or descending order by using the up/down arrows. This is useful to sort by ‘name/organisation’.

Document Type Date Description File Size Drawing/Rev Number
Application Documents
Biodiversity Net Gain
Application Plans
Neighbour and Other Response
Statutory Consultee Response
Committee Documents
Decision
Discharge of Condition
Planning Application Documents

Consultation Responses

Neighbour List


In addition to consultations with the consultee listed, we will publicise the application in accordance with national requirements and our local policy. This publicity usually takes the form of letters to nearby properties, the posting of site notices and/or the placing of a public notice in our local newspapers.


Address Sent Reply Received
25 Choules Close PERSHORE WR10 2FB 14/07/2025
1 Malvern Mews Bomford Place PERSHORE WR10 2GS 29/11/2024
Hunters Gate 76 Stonebow Road Drakes Broughton PERSHORE WR10 2AS 18/11/2024
Worcestershire County Council Wildwood Drive, Worcester, WR5 2LG 23/01/2025
2 Barn View Allesborough Hill PERSHORE WR10 2AB 24/11/2024
12 Allesborough Court Bomford Place PERSHORE WR10 2GS 25/11/2024
Room WB 011, Geological Records Centre University of Worcester Henwick Grove Worcester, WR2 6AJ 12/12/2024
Allesborough Stables Besford Bridge Besford PERSHORE WR10 2GQ 20/11/2024
5 Malvern Mews Bomford Place PERSHORE WR10 2GS 08/12/2025
County Hall, Spetchley Road WR5 2NP 14/11/2024
15 Allesborough Court Bomford Place PERSHORE WR10 2GS 28/11/2024
8, Choules Close, Pershore WR10 2FB 09/07/2025
18 Choules Close Pershore WR10 2FB 11/07/2025
Pear Tree Cottage Worcester Road Wyre Piddle PERSHORE WR10 2HR 06/11/2024
NHS Trust 41 Church Street, Birmingham B3 2RT 05/06/2025
10 Allesborough Court Bomford Place PERSHORE WR10 2GS 29/10/2024 05/12/2025
16 Allesborough Court Bomford Place PERSHORE WR10 2GS 29/10/2024 27/11/2024
8 Allesborough Court Bomford Place PERSHORE WR10 2GS 29/10/2024 17/11/2024
1 Allesborough Cottage Allesborough Hill PERSHORE WR10 2AB 29/10/2024
1 Allesborough Court Bomford Place PERSHORE WR10 2GS 29/10/2024
11 Allesborough Court Bomford Place PERSHORE WR10 2GS 29/10/2024
3 Allesborough Court Bomford Place PERSHORE WR10 2GS 29/10/2024
33 Choules Close PERSHORE WR10 2FB 29/10/2024
34 Choules Close PERSHORE WR10 2FB 29/10/2024
35 Choules Close PERSHORE WR10 2FB 29/10/2024
36 Choules Close PERSHORE WR10 2FB 29/10/2024
37 Choules Close PERSHORE WR10 2FB 29/10/2024
38 Choules Close PERSHORE WR10 2FB 29/10/2024
39 Choules Close PERSHORE WR10 2FB 29/10/2024
4 Allesborough Court Bomford Place PERSHORE WR10 2GS 29/10/2024
40 Choules Close PERSHORE WR10 2FB 29/10/2024
41 Choules Close PERSHORE WR10 2FB 29/10/2024
43 Choules Close PERSHORE WR10 2FB 29/10/2024
44 Choules Close PERSHORE WR10 2FB 29/10/2024
45 Choules Close PERSHORE WR10 2FB 29/10/2024
46 Choules Close PERSHORE WR10 2FB 29/10/2024
5 Allesborough Court Bomford Place PERSHORE WR10 2GS 29/10/2024
9 Allesborough Court Bomford Place PERSHORE WR10 2GS 29/10/2024
2 Allesborough Court Bomford Place PERSHORE WR10 2GS 29/10/2024 28/11/2024
42 Choules Close PERSHORE WR10 2FB 29/10/2024 13/11/2024
7 Allesborough Court Bomford Place PERSHORE WR10 2GS 29/10/2024 18/11/2024

Consultee List


Name Organisation Sent Reply Due Reply Received
Aidan Smyth WDC - Archaeology & Planning Advisor 29/10/2024 19/11/2024
Cllr Charles Tucker Pershore Ward 29/10/2024 19/11/2024
Cllr Dan Boatright-Greene Pershore Ward 29/10/2024 19/11/2024
Cllr Jodi Arnold Pershore Ward 29/10/2024 19/11/2024
Delegated Commissioning Team NHS Herefordshire & Worcs Integrated Care Board 29/10/2024 19/11/2024
Drainage Engineer Engineers - S.W. Land Drainage Partnership 29/10/2024 19/11/2024
Environment Agency West Area Planning 29/10/2024 19/11/2024
Highways County Highways 29/10/2024 19/11/2024
Matt Barker MHDC & WDC Carbon Reduction Project Officer 29/10/2024 19/11/2024
Mrs Charlie MacIntyre Pershore Town Council 29/10/2024 19/11/2024
Mrs E Marshall Landscape Officer 29/10/2024 19/11/2024 27/01/2025
Mrs H Fleming Natural England 29/10/2024 19/11/2024
Mrs V Wood Pershore Civic Society 29/10/2024 19/11/2024
Ms R Clare Environment Agency 29/10/2024 19/11/2024
Policy Plans - General Policy Plans - General 29/10/2024 19/11/2024
WCC LLFA Planning Consultation WCC Lead Local Flood Authority 29/10/2024 19/11/2024
WDC Natural Heritage & Biodiversity Officer WDC Natural Heritage & Biodiversity 29/10/2024 19/11/2024
Worcestershire & Herefordshire LMC Ltd Local Medical Committee 29/10/2024 19/11/2024
Worcestershire Regulatory Services - Cont. Land Worcestershire Regulatory Services 29/10/2024 19/11/2024
Housing Team - WDC Housing - WDC 16/01/2025 06/02/2025
Mr S Bloomfield Worcestershire Wildlife Trust 20/01/2025 10/02/2025
Drainage Engineer Engineers - S.W. Land Drainage Partnership 21/03/2025 11/04/2025
Eileen Marshall Eileen Marshall 21/03/2025 11/04/2025 22/05/2025
Highways County Highways 21/03/2025 11/04/2025
Mr S Bloomfield Worcestershire Wildlife Trust 21/03/2025 11/04/2025
Mrs Charlie MacIntyre Pershore Town Council 21/03/2025 11/04/2025
Mrs H Fleming Natural England 21/03/2025 11/04/2025
WCC LLFA Planning Consultation WCC Lead Local Flood Authority 21/03/2025 11/04/2025 14/04/2025
WDC Natural Heritage & Biodiversity Officer WDC Natural Heritage & Biodiversity 21/03/2025 11/04/2025
Worcestershire Regulatory Services - Air Quality Worcestershire Regulatory Services 21/03/2025 11/04/2025
Worcestershire Regulatory Services - Nuisance Worcestershire Regulatory Services 21/03/2025 11/04/2025
Mrs Charlie MacIntyre Pershore Town Council 09/06/2025

Constraints List


Constraints List
Paper: Evesham Journal - Thursday
Minor Aquifer
Contaminated Land
Outside SWDP Development Boundary
Section 106 Agreement
CIL008 - Non-Urban Area
Surface Water: Low 1 in 1000 extent
Wind Turbines
Policy Case HLA - WDC/93/HOU. Allesborough Farm, Allesborough Hill, Pershore, WR10 2AB. Demolition of existing modern farm buildings, removal of hardstanding and erection of 27no dwellings with associated landscaping enhancements.. Affordable; Open Market. Large windfall (HLA only)
SWDP 5: Protect and Enhance
SWDP 22: Local Geological Sites
Site of Special Scientific Interest
No associated appeals