| Condition Details / Information Notes |
| The development hereby permitted shall be begun before the expiration of three years from the date of this permission.
Reason: To conform with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
| Unless where required or allowed by other conditions attached to this permission/consent, the development hereby approved shall be carried out in accordance with the information (including details on the proposed materials) provided on the application form and the following plans/drawings/documents –
599 1-O-100 - Location Plan
599 1-O-201 Rev A - Proposed Site Plan
101 B - Proposed Plans and Elevations
Reason: To define the permission in accordance with Policy SWDP1 and SWDP2 of the South Worcestershire Development Plan and the National Planning Policy Framework. |
| No development above floor slab level shall take place until details of the materials to be used in the construction of the external surfaces of the dwelling hereby permitted have been submitted to and approved in writing by the local planning authority. The details to be submitted shall include:-
- type, colour, and design of roofing materials;
- detailed specification of the new weatherboarding showing the dimensions, profile and a description of the stain or paint finish to be applied to the boarding:
Reason - To ensure that the new materials are in keeping with the surroundings and/or represent quality design in accordance with policy SWDP21 of the South Worcestershire Development Plan and the relevant aims and objectives of the National Planning Policy Framework.
|
| Development, other than that required to be carried out as part of an approved scheme of remediation, shall not commence until Parts 1 to 6 have been complied with:
Part 1
A preliminary risk assessment shall be carried out. This study shall take the form of a Phase I desk study and site walkover and shall include the identification of previous site uses, potential contaminants that might reasonably be expected given those uses and any other relevant information. A preliminary risk assessment report including:-
- a diagrammatical representation (conceptual model) based on the information above; and
- all potential contaminants, sources and receptors to determine whether a site investigation is required
shall be submitted to and approved in writing by the Local Planning Authority prior to the commencement of construction works on the development hereby approved.
Part 2
Where an unacceptable risk is identified and prior to the commencement of construction work on the development hereby permitted a scheme for detailed site investigation shall be submitted to and approved in writing by the Local Planning Authority. The scheme must be compiled by competent persons and must be designed in accordance with the Environment Agency's "Land Contamination: Risk Management" guidance.
Part 3
Where part 2 applies, a detailed site investigation and risk assessment shall be undertaken in accordance with the approved scheme required under Part 2 and a written report of the findings produced, submitted to and approved in writing by the local planning authority. The investigation/assessment shall be approved prior to the commencement of construction works on the development hereby approved.
Part 4
Where identified as necessary in the report approved under Part 3, a detailed remediation scheme to bring the site to a condition suitable for the intended use by removing unacceptable risks to identified receptors shall be produced, submitted to and approved in writing by the local planning authority. The scheme shall include an implementation programme. The scheme shall be approved prior to the commencement of construction works on the development hereby approved and must ensure that the site will not qualify as Contaminated Land under Part 2A Environmental Protection Act 1990 in relation to the intended use of the land after remediation
Part 5
The remediation scheme approved under Part 4 shall be carried out in accordance with its terms prior to the commencement of development, other than that required to carry out remediation, unless otherwise agreed in writing by the Local Planning Authority.
Part 6
Following the completion of the measures identified in the remediation scheme approved under Part 4, a validation report that demonstrates the effectiveness of the remediation carried out shall be produced, submitted to and approved in writing by the Local Planning Authority. None of the development hereby approved shall be occupied until the validation report has been approved.
Part 7
In the event that contamination is found at any time when carrying out the approved development that was not previously identified in the report approved under Part 3, construction works shall cease and this shall be reported immediately in writing to the Local Planning Authority. In such circumstances an investigation and risk assessment must be undertaken and a revised remediation scheme must be produced, submitted to and approved in writing by the Local Planning Authority. Development works shall not resume until the revised remediation scheme has been approved in writing. The measures as set out in the revised remediation scheme shall be carried out. Following the completion of any measures identified in the approved revised remediation scheme a validation report must be produced, submitted to and approved in writing by the Local Planning Authority. None of the development hereby approved shall be occupied until the validation report has been approved.
Reason: To ensure that the proposed development avoids significant adverse impacts from pollution in accordance with policy SWDP31 of the South Worcestershire Development Plan and the relevant aims and objectives of the National Planning Policy Framework. |
| The Development hereby approved shall not be first occupied until sheltered and secure
cycle parking to comply with the Council’s adopted highway design guide has been provided
in accordance with details which shall first be submitted to and approved in writing by the
Local Planning Authority and thereafter the approved cycle parking shall be kept available
for the parking of bicycles only.
Reason - To comply with the Council’s parking standards and to promote sustainable forms of travel in accordance with Policies SWDP 4 and SWDP 21 of the South Worcestershire Development Plan and the relevant aims and objectives of the National Planning Policy Framework.
|
| The Development hereby approved shall not be first occupied until the parking and turning
facilities have been provided as shown on Drawing Number 5991-O-201 Rev A.
Reason: To ensure conformity with summited details and ensure highway safety in accordance with Policy SWDP 4 of the South Worcestershire Development Plan and the relevant aims and objectives of the National Planning Policy Framework.
|
| The development hereby permitted shall not be occupied until full details of all foul and surface water drainage systems to serve the development have been submitted to and approved in writing by the Local Planning Authority. The approved drainage works shall be implemented in accordance with the approved details before the first occupation of the development hereby permitted and shall be retained thereafter.
Reason: To ensure development would not result in unacceptable risk of pollution or harm to the environment and to ensure the proposed development does not exacerbate flood risk and deals with surface water run-off from the site in a sustainable manner, in accordance with policies SWDP28, SWDP29 and SWDP 30 of the South Worcestershire Development Plan and the relevant aims and objectives of the National Planning Policy Framework. |
| Before the first occupation of the development hereby permitted a plan indicating the positions, design, materials and type of boundary treatment to be erected shall be submitted to and approved in writing by the local planning authority. The boundary treatment shall be completed before the first occupation of the development hereby permitted. Development shall be carried out in accordance with the approved details.
Reason - To protect the amenities of properties and ensure the proposed development does not have an adverse effect on the character and appearance of the area in accordance with policies SWDP21 and SWDP25 of South Worcestershire Development Plan and the relevant aims and objectives of the National Planning Policy Framework. |
| The development hereby permitted shall be carried out in strict accordance with the recommendations set out in the Phase 2 Bat Survey Report carried out by Ridgeway Ecology Ltd, ref, RE2025-157 dated 1st September 2024 and submitted with this application. In particular:
- the installation of two bat boxes at the southern and eastern gables of the proposed replacement building to be positioned away from windows and other light sources.
- a bat box will be installed on site prior to work starting to be used as a temporary roost site if any bats are discovered during works.
Reason: To ensure the development contributes to the conservation and enhancement of biodiversity within the site and the wider area in accordance with policy SWDP22 of the South Worcestershire Development Plan and the relevant aims and objectives of the National Planning Policy Framework. |
| Before the development hereby permitted is first occupied, details of any external lighting to be provided in association with the development shall be submitted to and approved in writing by the Local Planning Authority. Only external lighting in accordance with approved details shall be provided on the application site. Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (or any Order revoking or re-enacting that Order with or without modification) there shall be no other external lighting provided on the application site.
Reason - To ensure the proposed development does not have an adverse effect on the character and appearance of the area in accordance with policies SWDP1, SWDP21 and SWDP25 of South Worcestershire Development Plan and to ensure the development contributes to the conservation and enhancement of biodiversity within the site and the wider area in accordance with policy SWDP22 of the South Worcestershire Development Plan and the relevant aims and objectives of the National Planning Policy Framework. |
| Before the first occupation of the development hereby permitted a scheme of landscaping shall be submitted to and approved in writing by the Local Planning Authority. The landscaping scheme shall include:-
(i) a plan showing the layout of proposed tree, hedge and shrub planting and grass areas.
(ii) a schedule of proposed planting - indicating species, sizes at time of planting and numbers/densities of plants.
(iii) a written specification outlining cultivation and other operations associated with plant and grass establishment.
(iv) a schedule of maintenance, including watering and the control of competitive weed growth, for a minimum period of five years from first planting.
All planting and seeding/turfing shall be carried out in accordance with the approved details in the first planting and seeding/turfing seasons following the completion or first occupation of the development, whichever is the sooner.
The planting shall be maintained in accordance with the approved schedule of maintenance. Any trees or plants which, within a period of five years from the completion of the planting, die, are removed or become seriously damaged or diseased shall be replaced in the next planting season with others of similar size and species.
Reason - To ensure the proposed development does not have an adverse effect on the character and appearance of the area in accordance with policies SWDP21 and SWDP25 of South Worcestershire Development Plan and the relevant aims and objectives of the National Planning Policy Framework. |
| Prior to the occupation of any part of the development hereby permitted details of renewable or low carbon energy generating facilities to be incorporated as part of the development shall be submitted to and approved in writing by the local planning authority. The details shall demonstrate that at least 10% of the predicted energy requirements of the development will be met through the use of renewable/low carbon energy generating facilities. The approved facilities shall be provided prior to any part of the development hereby permitted being first occupied or in accordance with a timetable submitted to and approved by the local planning authority as part of the details required by this condition.
Reason: To ensure the proposed development includes sufficient renewable/low carbon energy generating facilities to comply with Policy 27 of the South Worcestershire Development Plan and the relevant aims and objectives of the National Planning Policy Framework. |
| Prior to the first occupation of the development hereby permitted, a Water Management Statement, setting out
water efficiency measures and confirming that the daily non-recycled water use per person
will not exceed 110 litres per day, shall be submitted to, and approved in writing by, the Local
Planning Authority. The scheme shall be implemented in accordance with the approved
details before the first occupation of the development and retained thereafter.
Reason: To ensure sustainability measures are taken into account in the development in
accordance with Policies SWDP 21 and SWDP 30 of the South Worcestershire Development
Plan and the relevant aims and objectives of the National Planning Policy Framework. |
| Prior to the first occupation of the dwelling hereby approved, details of superfast broadband facilities or alternative solutions to serve the dwellings hereby approved shall be submitted to and approved in writing by the local planning authority. The submitted details shall include an implementation programme. The facilities shall be provided in accordance with the approved details.
Reason: To ensure the proposal incorporates satisfactory telecommunication facilities in line with policy SWDP26 of the South Worcestershire Development Plan and the relevant aims and objectives of the National Planning Policy Framework.
|
| Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (as amended) (or any order revoking, re-enacting, substituting, amending, extending, consolidating, replacing or modifying that Order), no new windows or other openings other than those expressly authorised by this permission shall be constructed/carried out on or involving the West elevation or roof of the application site following the completion of the development hereby permitted in accordance with the plans listed under Condition 2 of this Decision Notice.
Reason: To protect the amenity of the neighbouring dwellings in accordance with policy SWDP21 of the South Worcestershire Development Plan and the relevant aims and objectives of the National Planning Policy Framework. |
| Positive and Proactive Statement. In dealing with this application, the Council has worked with the applicant in the following ways:- seeking further information following receipt of the application;
- seeking amendments to the proposed development following receipt of the application;
and considering the imposition of conditions and the completion of a s.106 legal agreement.
In such ways the Council has demonstrated a positive and proactive manner in seeking solutions to problems arising in relation to the planning application. |
|
Buildings, and particularly roofs and the spaces underneath them, are frequently used as roosting sites by bats. Bats and their 'roost' sites are protected under the Wildlife and Countryside Act 1981 (as amended) and the Conservation of Habitats & Species Regulations 2010, the latter of which deems them a European Protected Species. It is a criminal offence to deliberately kill or injure a bat, to disturb or destroy a bat roost or to obstruct an entrance to a roost. If evidence of bats is found, work should stop immediately and an ecological consultant contacted for advice on the best way to proceed. All contractors working on site should be made aware of the advice and provided with the contact details of a relevant ecological consultant. |