| Application Number | W/24/02507/FUL |
| Status | Application Approved |
| Application Valid |
|---|
| 21/01/2025 |
| Consultation End |
|---|
| 13/03/2025 |
| Committee Meeting |
|---|
| 27/03/2025 |
| Decision |
|---|
| Approval |
| Decision Date |
|---|
| 28/03/2025 |
| Appeal Started |
|---|
| N/A |
| Appeal Decision |
|---|
| N/A |
| Summary | |
| Application Number | W/24/02507/FUL |
| Location Address | Evesham Leisure Centre Abbey Road Evesham WR11 4SU |
| Proposal | Full planning application for the installation of PV panels and 2no. air source heat pumps. |
| Status | Approval |
| Application Type | Full planning permission |
| Appeal Decision | N/A |
| Important Dates | |
| Application Received Date | 11/12/2024 |
| Application Valid Date | 21/01/2025 |
| Consultation Start Date | 29/01/2025 |
| Site Visited / Site Notice Date | |
| Consultation End | 13/03/2025 |
| Advert Expiry | |
| Committee Date (if applicable) | 27/03/2025 |
| Committee Agenda | Planning Committee Information |
| Decision Date | 28/03/2025 |
| Further Information | |
| Expected Decision Level | Committee |
| Case Officer | Charlotte Barry |
| Parish | Evesham |
| Ward | Evesham North Ward |
| Applicant | Wychavon District Council |
| Agent | Mrs Louisa Nelson, Ingleton Wood LLP |
| Agent Address | 8 Whiting Road Norwich Business Park Norwich Norfolk NR4 6DN |
| Condition Details / Information Notes |
| The development hereby permitted shall be begun before the expiration of three years from the date of this permission. Reason: To conform with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
| Unless where required or allowed by other conditions attached to this permission/consent, the development hereby approved shall be carried out in accordance with the information (including details on the proposed materials) provided on the application form and the following plans/drawings/documents – Drg no. 7000182 IWD EV XX DR Z 9904 - Site Location Plan Drg no. 7000182 IWD EV XX DR Z 9905 – ASHP Scale Drg no. 7000182 IWD EV XX DR Z 9900 – Site Plan Proposed Drg no. 7000182 IWD EV XX DR Z 9901 – Site Plan Existing Drg no. 7000182-IWD-EV-XX-DR-Z-9902 – Building Elevations Proposed Drg no. 7000182 IWD EV XX DR Z 9903 – Building Elevations Existing Reason: To define the permission in accordance with Policy SWDP1 and SWDP2 of the South Worcestershire Development Plan and the National Planning Policy Framework. |
| Prior to the first use/occupation of the development hereby permitted, the details set out in the submitted Water Management Statement shall be fully implemented and remain thereafter. Reason: To ensure that an appropriate sustainable drainage system is provided to serve the development in accordance with policy SWDP29 of the South Worcestershire Development Plan 2016. |
| The development hereby permitted shall be carried out in strict accordance with the recommendations set out in the Preliminary Roost Assessment report carried out by Arbtech dated 29th October 2024 and submitted with this application. In particular: - The removal of the plant should be done quickly with minimal noise and lighting and with no contact made to the bat loft by machinery. The works should be undertaken in the shoulder season (October-November or March-April) to minimise the risk to any bats that may roost or hibernate within the building from after the survey has been conducted but before the works take place. - In the unlikely event that a bat or evidence of bats is discovered during the development all work must stop and a bat licensed ecologist contacted for further advice. - The client has been advised that efforts should be made to contact the named ecologist and provide an updated assessment of the use of the bat loft by bats. It is recommended that removing the metal access grate and installing a loft hatch over the winter period will provide clearer access for bats and could increase uptake. Reason: To ensure the development contributes to the conservation and enhancement of biodiversity within the site and the wider area in accordance with policy SWDP22 of the South Worcestershire Development Plan. |
| Prior to its / their installation as part of the development hereby approved, the following details shall be submitted to and approved in writing by the authority: - A detailed specification of the proposed solar panels to be installed, including details of the dimensions, number of panels to be installed, materials, colour and finish. In addition, the method of fixing to the roof, including the proposed angle, of the panels. Reason: In order to ensure the proposed development integrates effectively with the exisitng building in terms of form and retains a high-quality design that does not adversely impact the visual characteristics of the surrounding landscape, in accordance with SWDP21, SWDP25 of the South Worcestershire Development Plan. |
| If the PV panels hereby permitted are no longer required for the purposes of energy production, they shall be dismantled and all materials removed from the site, including all fixtures, fittings, frame and any other associated infrastructure/development within 6 months from the date of cessation of the use. Reason - To preserve the high-quality design of the building and characteristics of the surrounding area in accordance with Policies SWDP21 and SWDP25 of the South Worcestershire Development Plan (February 2016). |
| Positive and Proactive Statement. No problems have arisen in dealing with this application. The planning application sought an acceptable form of development consistent with the requirements of relevant policies and material considerations. No amendments or alterations were therefore required and no further positive or proactive action was deemed necessary. |
Plans, drawings and material submitted to the council are protected by the copyright acts (section 47, 1988 act). You may only use material which is downloaded and/or printed for consultation purposes, to compare current applications with previous schemes and to check whether developments have been completed in accordance with approved plans. Further copies must not be made without the prior permission of the copyright owner.
Tick here to show you have read and agree with the Copyright Notice.
Document Download Tips
How to reorder or group rows
Click on a column heading for the ability to sort the ‘group’ listing in ascending or descending order by using the up/down arrows. This is useful to sort by ‘name/organisation’.
In addition to consultations with the consultee listed, we will publicise the application in accordance with national requirements and our local policy. This publicity usually takes the form of letters to nearby properties, the posting of site notices and/or the placing of a public notice in our local newspapers.
| Address | Sent | Reply Received |
|---|---|---|
| Abbey Road Nurseries Abbey Road EVESHAM WR11 4ST | 29/01/2025 | |
| Evesham Fire Station Abbey Road EVESHAM WR11 4ST | 29/01/2025 | |
| Old Sewage Works Abbey Lane EVESHAM WR11 4BN | 29/01/2025 | |
| The Cottage Abbey Road EVESHAM WR11 4ST | 29/01/2025 | |
| Wishmore Workshop At The Old Sewage Works Abbey Lane EVESHAM WR11 4BN | 29/01/2025 |
| Name | Organisation | Sent | Reply Due | Reply Received |
|---|---|---|---|---|
| Asset Protection Team | Severn Trent Water Limited | 29/01/2025 | 19/02/2025 | |
| Cllr Charlie Homer | Evesham North Ward | 29/01/2025 | 19/02/2025 | |
| Cllr Mary Tasker | Evesham North Ward | 29/01/2025 | 19/02/2025 | |
| Drainage Engineer | Engineers - S.W. Land Drainage Partnership | 29/01/2025 | 19/02/2025 | |
| Environment Agency | West Area Planning | 29/01/2025 | 19/02/2025 | |
| Highways | County Highways | 29/01/2025 | 19/02/2025 | |
| Ms R Clare | Environment Agency | 29/01/2025 | 19/02/2025 | |
| Town Clerk | Evesham Town Council | 29/01/2025 | 19/02/2025 | |
| Worcestershire Regulatory Services - Cont. Land | Worcestershire Regulatory Services | 29/01/2025 | 19/02/2025 | |
| Town Clerk | Evesham Town Council | 18/03/2025 |
| Constraints List |
| Paper: Evesham Journal - Thursday |
| CIL004 - Main Urban Area |
| Contaminated Land |
| Historic Flood Map |
| Flood Zone 2: Medium |
| Landfill Consultation |
| Surface Water: Low 1 in 1000 extent |
| Wind Turbines |
| Policy Case HLA - PAR/37/479/HOU. Land Off, Boat Lane, Evesham. Outline Planning Application 18/00549/OUT for up to 200 dwellings, open space and landscaping including children's play, new vehicular and pedestrian access, community orchard, parking, expansion of leisure centre car park, engineering (including ground modelling) works, site reclamation (including demolition) and infrastructure (including cycle and pedestrian connections). Affordable; Open Market. Previously allocated large |
| SWDP 2: Development Boundary |
| SWDP 5: Urban - Unsurveyed |
| Minor Aquifer |
| No associated appeals |