| Condition Details / Information Notes |
| The development hereby permitted shall be begun before the expiration of three years from the date of this permission.
Reason: To conform with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
| Unless where required or allowed by other conditions attached to this permission/consent, the development hereby approved shall be carried out in accordance with the information (including details on the proposed materials) provided on the application form and the following plans/drawings/documents –
Drg no. 24-45-00 – Location Plan
Drg no. 24-45-01 – Existing Block Plan
Drg no. 24-45-02 – Existing Ground Floor Plan
Drg no. 24-45-03 – Existing Elevations
Drg no. 24-45-11A – Proposed Block Plan
Drg no. 24-45-12 – Proposed Ground Floor Plan
Drg no. 24-45-13B – Proposed Elevations
Reason: To define the permission in accordance with Policy SWDP1 and SWDP2 of the South Worcestershire Development Plan and the National Planning Policy Framework. |
| The materials to be used in the construction of the external surfaces of the extension hereby permitted shall match in type, colour, texture, size, coursing, jointing and pointing those used in the existing building.
Reason - To ensure that the new materials are in keeping with the surroundings and/or represent quality design in accordance with policy SWDP21 of the South Worcestershire Development Plan and the relevant aims and objectives of the National Planning Policy Framework. |
| The premises shall be used for purposes incidental to and in connection with the existing B2 general industrial use of the site, and shall not be used as a separate planning unit, nor for any other purpose (including a use in any other Class of the Schedule to the Town and Country Planning (Use Classes) Order 1987 (as amended), or in any provision equivalent to those Classes in any statutory instrument revoking and re-enacting that Order with or without modification).
Reason: To ensure the development remains ancillary to the existing use of the site, to prevent the creation of a separate planning unit which could result in additional impacts on highway safety, amenity, and the character of the area, in accordance with Policies SWDP4 and SWDP21 of the South Worcestershire Development Plan and the relevant aims and objectives of the National Planning Policy Framework. |
| The areas shown on the approved plans for vehicle parking and turning shall be retained and kept available for those purposes at all times.
Reason: In the interests of highway safety and to ensure the free flow of traffic using the adjoining highway in accordance with SWDP4 of the South Worcestershire Development Plan and the relevant aims and objectives of the National Planning Policy Framework. |
| In the event that contamination is found at any time when carrying out the approved development that was not previously identified it must be reported immediately to the Local Planning Authority. The applicant is advised to immediately seek the advice of an independent geo-environmental consultant experienced in contaminated land risk assessment, including intrusive investigations and remediation.
No further works should be undertaken in the areas of suspected contamination, other than that work required to be carried out as part of an approved remediation scheme, unless otherwise agreed by the Local Planning Authority, until requirements 1 to 4 below have been complied with:
1. Detailed site investigation and risk assessment must be undertaken by competent persons in accordance with the Environment Agency’s ‘Land Contamination: Risk Management’ guidance and a written report of the findings produced. The riskassessment must be designed to assess the nature and extent of suspected contamination and approved by the Local Planning Authority prior to any further development taking place.
2. Where identified as necessary, a detailed remediation scheme to bring the site to a condition suitable for the intended use by removing unacceptable risks to identified receptors must be prepared and is subject to the approval of the Local Planning Authority in advance of undertaking. The remediation scheme must ensure that the site will not qualify as Contaminated Land under Part 2A Environmental Protection Act 1990 in relation to the intended use of the land after remediation.
3. The approved remediation scheme must be carried out in accordance with its terms prior to the re-commencement of any site works in the areas of suspected contamination, other than that work required to carry out remediation, unless otherwise agreed in writing by the Local Planning Authority.
4. Following completion of measures identified in the approved remediation scheme a verification report that demonstrates the effectiveness of the remediation carried out must be produced and is subject to the approval of the Local Planning Authority prior to the occupation of any buildings on site.
REASON: To ensure that the risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property, and ecosystems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors in accordance with SWDP31 of the South Worcestershire Development Plan and the relevant aims and objectives of the National Planning Policy Framework. |
| Prior to the first use/occupation of the development hereby permitted, the details set out in the submitted Water Management Statement shall be fully implemented and remain thereafter.
Reason: To ensure that an appropriate sustainable drainage system is provided to serve the development in accordance with policy SWDP29 of the South Worcestershire Development Plan 2016. |
| Positive and Proactive Statement. No problems have arisen in dealing with this application. The planning application sought an acceptable form of development consistent with the requirements of relevant policies and material considerations. No amendments or alterations were therefore required and no further positive or proactive action was deemed necessary. |