Application Number W/25/00529/FUL
Status Application Approved

Sign up to notifications on this planning application Back to search results New search

Planning Online Status


  • Application
    Valid
    13/03/2025
  • Consultation
    End
    06/06/2025
  • Committee
    Meeting
    N/A
  • Decision

    Approval
  • Decision
    Date
    18/08/2026
  • Appeal
    Started
    N/A
  • Appeal
    Decision
    N/A
Summary
Application Number W/25/00529/FUL
Location Address Thornleigh Nurseries Stonebow Road Drakes Broughton Pershore WR10 2AP
Proposal Full planning permission for demolition of 2 existing dwellinghouses and associated outbuildings and erection of 53 dwellings, associated open space and vehicular access from Stonebow Road as approved under planning permission W/23/01681/FUL - variation of condition 2 to amend materials and elevations of roof scape.
Status Approval
Application Type Full planning permission
Appeal Decision N/A

Important Dates
Application Received Date 13/03/2025
Application Valid Date 13/03/2025
Consultation Start Date 19/03/2025
Site Visited / Site Notice Date
Consultation End 06/06/2025
Advert Expiry 17/04/2025
Committee Date (if applicable)
Committee Agenda
Decision Date 18/08/2026

Further Information
Expected Decision Level Delegated
Case Officer Adam White
Parish Drakes Broughton and Wadborough
Ward Drakes Broughton, Norton & Whittington Ward
Applicant Mr Andrew Cockayne, Kendrick Homes Ltd
Agent Mr Andrew Cockayne, Kendrick Homes Ltd
Agent Address Westhill House Hagley Road Stourbridge West Midlands DY8 1RD

Condition Details / Information Notes
Unless where required or allowed by other conditions attached to this permission/consent, the development hereby approved shall be carried out in accordance with the following plans/drawings/documents: P22_2704_DE_008_F_05 - Site Location Plan 392-00-620 P1 - Materials Layout P22-2704_DE_001_G_09 - Boundary Treatments Plan P22-2704_DE_008_AE_01 - Site Layout Plan 1:500 P22-2704_DE_008_AE_02 - Site Layout Plan 1:1000 P22-2704_DE_001_F_10 - Refuse Strategy Plan P22-2704_DE_005_C_01 - Lulsley Plans & Elevations P22-2704_DE_005_D_04 - Hawford Plans & Elevations P22-2704_DE_004_C_05 - Claydon Floor Plans & Elevations P22-2704_DE_005_E_07 - Kingston Plans & Elevations P22-2704_DE_005_D_08 - Henley Plans & Elevations P22-2704-DE_005_C_09 - Hallow Plan & Elevations P22-2704_DE_005_B_10 - 1B Cluster Plans & Elevations P22-2704_DE_005_C_11 - A2 + Gable End Plans & Elevations P22-2704_DE_005_B_12 - A2 + Mid Terrace Plans & Elevations 392-12-01 - Housetype A2+ Plans and Elevations - Plots 22 & 23 P22-2704_DE_005_C_13 - A3 + Plans & Elevations P22-2704_DE-005_B_14 - Single Garage Plan & Elevations P22-2704_DE_005_B_15 - Double Garage Plan & Elevations P22-2704_DE_005_B_16 - Twin Garage Plan & Elevations P22-2704_DE_005_C_17 - A3 + Mid Terrace Elevations and Floorplans P22-2704_DE_005_D_20 - Oakley Plans & Elevations P22-2704_DE_005_C_21 - 2 Bed Aff M4 (3) Plans & Elevations P22-2704_DE_005_A_22 - Gable End A3 + Plans & Elevations 220722-RAP-XX-XX-DR-TP-3202/P01 - Access Arrangement & Visibility Assessment Reason: In order to define the permission in accordance with policies SWDPR 01, SWDPR 05 and SWDPR 28 of the South Worcestershire Development Plan Review and the National Planning Policy Framework.
The development hereby permitted shall be built in accordance with the floor slab levels shown on drawing No. 392-00-102 P1 (External Levels Plan) as approved under condition 3 of permission Ref: W/23/01681/FUL. Reason: To ensure the proposed development does not have an adverse effect on the character and appearance of the area in accordance with policies SWDPR 05, SWDPR 28 and SWDPR 35 of South Worcestershire Development Plan Review and the aims and objectives of the National Planning Policy Framework (NPPF).
The development hereby permitted shall be carried out in accordance with the following landscaping details approved under condition 4 of permission Ref: W/23/01681/FUL: • Boundary Treatments / Landscaping Layout Sheet 1: 392-00-110 P5 • Boundary Treatments / Landscaping Layout Sheet 2: 392-00-111 P5 • Boundary Treatments / Landscaping Layout Sheet 3: 392-00-112 P5 • Boundary Treatments / Landscaping Layout Sheet 4: 392-00-113 P5 • Boundary Treatments / Landscaping Layout Sheet 5: 392-00-114 P5 • Schedule of Planting Revision P3 All planting and seeding/turfing shall be carried out in accordance with the approved details in the first planting and seeding/turfing seasons following the completion or first occupation/use of the development, whichever is the sooner. The planting shall be maintained in accordance with the approved schedule of maintenance. Any trees or plants which, within a period of five years from the completion of the planting, die, are removed or become seriously damaged or diseased shall be replaced in the next planting season with others of similar size and species. Reason: To ensure the proposed development does not have an adverse effect on the character and appearance of the area in accordance with policies SWDPR 05 and SWDPR 28 of South Worcestershire Development Plan Review and the aims and objectives of the National Planning Policy Framework (NPPF).
The development hereby permitted shall be built in accordance with the hard landscaping details shown on drawing No. 392-00-106 P1 (External Finishes Layout) as approved under condition 5 of permission Ref: W/23/01681/FUL. Reason: To ensure the proposed development represents high quality design and does not have an adverse effect on the character and appearance of the area in accordance with policies SWDPR 05 and SWDPR 28 of South Worcestershire Development Plan Review and the aims and objectives of the National Planning Policy Framework (NPPF).
The development hereby permitted shall be carried out in accordance with the following boundary treatment details approved under condition 6 of permission Ref: W/23/01681/FUL: • Fencing Details ‘PFC’ Lap Panel Fence with Concrete Post: KHSD-8-100 C1 • Fencing Details ‘CBC’ Close Board Panel Fence & Concrete Post: KHSD-8-120 C1 • Fencing Details - 1.2M ‘SPF’ Stock Proof, ‘SPFG’ Stock Proof + Gravel Board ‘PR3’ Ranch Fence: KHSD-8-140 C1 • Fencing Details ‘G1, G2 & G3’ Timber Gates: KHSD-8-150 C1 • Boundary Treatments / Landscaping Layout Sheet 1: 392-00-110 P5 • Boundary Treatments / Landscaping Layout Sheet 2: 392-00-111 P5 • Boundary Treatments / Landscaping Layout Sheet 3: 392-00-112 P5 • Boundary Treatments / Landscaping Layout Sheet 4: 392-00-113 P5 • Boundary Treatments / Landscaping Layout Sheet 5: 392-00-114 P5 Reason: To protect the amenities of properties and ensure the proposed development does not have an adverse effect on the character and appearance of the area in accordance with policies SWDPR 05, SWDPR 28 and SWDPR 35 of South Worcestershire Development Plan Review and the aims and objectives of the National Planning Policy Framework (NPPF).
The development hereby permitted shall be carried out in accordance with the following Public Open Space details approved under condition 7 of permission Ref: W/23/01681/FUL: • Boundary Treatments / Landscaping Layout Sheet 1: 392-00-110 P5 • Boundary Treatments / Landscaping Layout Sheet 2: 392-00-111 P5 • Boundary Treatments / Landscaping Layout Sheet 3: 392-00-112 P5 • Boundary Treatments / Landscaping Layout Sheet 4: 392-00-113 P5 • Boundary Treatments / Landscaping Layout Sheet 5: 392-00-114 P5 • Timetable for implementation set out in the email from Mark Perrins dated 23rd January 2026 Reason: To ensure the development incorporates adequate green infrastructure and outdoor recreation space in accordance with policies SWDPR 07 and SWDPR 49 of the South Worcestershire Development Plan Review and the aims and objectives of the National Planning Policy Framework (NPPF).
Temporary fencing for the protection of all retained trees/hedges on site and trees outside the site whose Root Protection Areas fall within the site shall be erected in accordance with BS 5837:2012 (Trees in Relation to Design, Demolition and Construction) before development of any type commences, including site clearance, demolition, materials delivery, vehicular movement and erection of site huts. Any alternative fencing type or position not strictly in accordance with BS 5837 (2012) must be agreed in writing by the local planning authority prior to the commencement of development. This protective fencing shall remain in place until the completion of development or unless otherwise agreed in writing with the local planning authority. Nothing should be stored or placed (including soil), nor shall any ground levels altered, within the fenced area without the previous written consent of the local planning authority. There shall be no burning of any material within 10 metres of the extent of the canopy of any retained tree/hedge. Reason: To prevent existing trees/hedges from being damaged during construction work and to preserve the amenities of the locality. This is in accordance with policies SWDPR 05 and SWDPR 28 of South Worcestershire Development Plan Review and the aims and objectives of the National Planning Policy Framework (NPPF).
Demolition, clearance or construction work and deliveries to and from the site in connection with the development hereby approved shall only take place between the hours of 08.00 and 18.00hrs Monday to Friday and 08.00 and 13.00hrs on a Saturday. There shall be no demolition, clearance or construction work or deliveries to and from the site on Sundays or Bank Holidays. Reason: To preserve the amenities of the locality in accord with policy SWDPR 35 of the South Worcestershire Development Plan Review and the aims and objectives of the National Planning Policy Framework (NPPF).
The development hereby permitted shall be carried out in accordance with the details contained in the Renewable and Low Carbon Energy Statement (Version 1.0 dated June 2025) approved under condition 10 of permission Ref: W/23/01681/FUL. Reason: To ensure the proposed development includes sufficient renewable/low carbon energy generating facilities to comply with policy SWDPR 37 of the South Worcestershire Development Plan Review and the aims and objectives of the National Planning Policy Framework (NPPF).
The development hereby permitted shall be carried out in accordance with the details contained in the Landscape and Ecological Management Plan (Ref: 82-251-R2-2 dated March 25) approved under condition 11 of permission Ref: W/23/01681/FUL. Reason: To ensure that the proposed development contributes to the conservation and enhancement of biodiversity within the site, and to ensure the proposal harmonises with the surroundings in accordance with policies SWDPR 05, SWDPR 28 and SWDPR 29 of South Worcestershire Development Plan Review and the aims and objectives of the National Planning Policy Framework (NPPF).
The development hereby permitted shall be carried out in accordance with the details contained in the Construction Ecological Management Plan: Biodiversity (Ref: 82-251-R1 dated January 25) approved under condition 12 of permission Ref: W/23/01681/FUL. Reason: To ensure compliance with the Wildlife and Countryside Act 1981 (as amended) and the Conservation of Habitats and Species Regulations 2017, the Environment Act 2021, policy SWDPR 29 of the South Worcestershire Development Plan Review and the aims and objectives of the National Planning Policy Framework (NPPF).
All external lighting shall be installed in accordance with the specifications and locations set out in the following lighting strategy details approved under condition 13 of permission Ref: W/23/01681/FUL: - Proposed Private Lighting and Illuminance Layout: 3111-D-01 - Lighting Review and Letter Statement from E3P dated 24th January 2025 Under no circumstances should any other external lighting be installed without prior consent from the local planning authority. Reason: To ensure compliance with the Wildlife and Countryside Act 1981 (as amended) and the Conservation of Habitats and Species Regulations 2010 and to minimise impacts on protected species in accordance with Policy SWDPR 29 of the South Worcestershire Development Plan Review and the aims and objectives of the National Planning Policy Framework (NPPF).
The development hereby permitted shall be carried out in accordance with the following surface water drainage details approved under condition 14 of permission Ref: W/23/01681/FUL: • Drainage Strategy and Water Management Strategy Report Revision D • Drainage Maintenance Schedule The approved surface water drainage scheme shall be implemented prior to the first use of the development and thereafter maintained in accordance with the agreed scheme. Reason: To ensure the proposed development does not exacerbate flood risk and deals with surface water run-off from the site in a sustainable manner, in accordance with policies SWDPR 38 and SWDPR 39 of the South Worcestershire Development Plan Review and the aims and objectives of the National Planning Policy Framework (NPPF).
The development hereby permitted shall be carried out in accordance with the details contained in the Surface Water Management Plan (Revision B dated July 2025) approved under condition 15 of permission Ref: W/23/01681/FUL. The approved construction surface water management plan shall be implemented as soon as works start on site thereafter maintained during the full duration of the construction phase. Reason: To ensure the proposed development does not exacerbate flood risk and deals with surface water run-off from the site in a sustainable manner, in accordance with policies SWDPR 38 and SWDPR 39 of the South Worcestershire Development Plan Review and the aims and objectives of the National Planning Policy Framework (NPPF).
The development hereby permitted shall be carried out in accordance with the following foul drainage details approved under condition 16 of permission Ref: W/23/01681/FUL: - Drainage Strategy and Water Management Strategy Report Revision D - Letter from T-T Pumps Limited (Ref: QK31026 Rev A - 48 Hr Storage 50mm - 21st February 2025) - T-T Pumps Limited - XL - XXL Package Pumping Stations - Installation - Product Manual - T-T Projects Engineer's Report - Timetable for implementation set out in the email from Mark Perrins dated 23rd January 2026 Reason: To ensure the development is served by satisfactory arrangements for the disposal of foul sewage and to ensure that the development does not increase the risk of flooding. These details are required prior to the commencement of the development as they form an intrinsic part of the proposal, the approval of which cannot be disaggregated from the carrying out of the rest of the development, in accordance with policies SWDPR 38, SWDPR 39 and SWDPR 40 of the South Worcestershire Development Plan Review and the aims and objectives of the National Planning Policy Framework (NPPF).
The remediation scheme detailed in the following documents approved under condition 17 of permission Ref: W/23/01681/FUL must be carried out in accordance with its terms. • Phase I and II Geo-environmental Report Ref: M44214-JNP-XX-XX-RP-G-0001 P03 (10 August 2023) • Additional Geo-Environmental Investigation & Remediation Strategy Ref: BRD4530-OR1-D (January 2026) Following the completion of the measures identified in the approved remediation scheme a validation report that demonstrates the effectiveness of the remediation carried out must be produced and is subject to the approval of the Local Planning Authority prior to the occupation of any buildings. In the event that contamination is found at any time when carrying out the approved development that was not previously identified it must be reported in writing immediately to the Local Planning Authority. An investigation and risk assessment must be undertaken and where necessary a remediation scheme must be prepared, these will be subject to the approval of the Local Planning Authority. Following the completion of any measures identified in the approved remediation scheme a validation report must be prepared, which is subject to the approval in writing of the Local Planning Authority prior to the occupation of any buildings. Reason: To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors in accordance with policy SWDP31 of the South Worcestershire Development Plan and the aims and objectives of the National Planning Policy Framework (NPPF).
No dwelling hereby approved shall be occupied until the vehicular access has been provided as shown on Drawing No. 220722-RAP-XX-XX-DR-TP-3202/P01. Reason: In the interests of highway safety in accordance with policy SWDPR 06 of the South Worcestershire Development Plan Review and the aims and objectives of the National Planning Policy Framework (NPPF).
Development shall not begin until visibility splays are provided from a vertical point 1.05m above carriageway level at the centre of the application main site access and 2.4m back from the near side edge of the adjoining carriageway, (measured perpendicularly), for 46m northwards and 48m southwards, respectively, measured along the nearside edge of the adjoining carriageway (vertical off set of 0.6m). Nothing shall be planted, erected and/or allowed to grow on the triangular areas of land so formed which would obstruct the visibility described above. Reason: In the interests of highway safety in accordance with policy SWDPR 06 of the South Worcestershire Development Plan Review and the aims and objectives of the National Planning Policy Framework (NPPF).
The Travel Plan prepared by Rappor (dated July 2026) approved under condition 20 of permission Ref: W/23/01681/FUL shall be implemented, monitored for a minimum of 5 years and shall be updated in agreement with Worcestershire County Council’s Travel Plan Officer and thereafter implemented as updated. Reason: To reduce vehicle movements and promote sustainable access in accordance with policy SWDPR 06 of the South Worcestershire Development Plan Review and the aims and objectives of the National Planning Policy Framework (NPPF).
The Travel Information Pack approved under condition 21 of permission Ref: W/23/01681/FUL shall be provided to each resident at the point of occupation. Reason: To reduce vehicle movements and promote sustainable access in accordance with policy SWDPR 06 of the South Worcestershire Development Plan Review and the aims and objectives of the National Planning Policy Framework (NPPF).
The development hereby approved shall not be brought into use until the following highway improvements works comprising:- • New sections of 2.0m footway on north side of Stonebow Road from the new site access in either direction; and • Two sets of uncontrolled pedestrian points, with dropped kerbs and tactile paving, on Stonebow Road, either side of the new site access. have been completed to the satisfaction of the Local Planning Authority and approved in writing (in discussion with the Local Highway Authority) and open to traffic. Reason: To ensure the safe and free flow of traffic onto the highway in accordance with policy SWDPR 06 of the South Worcestershire Development Plan Review and the aims and objectives of the National Planning Policy Framework (NPPF).
The development hereby permitted shall be carried out in accordance with the details contained in the Construction Method Statement (Revision B dated 10.06.2025) approved under condition 24 of permission Ref: W/23/01681/FUL. Reason: To ensure the provision of adequate on-site facilities and in the interests of highway safety in accordance with policy SWDPR 06 of the South Worcestershire Development Plan Review and the aims and objectives of the National Planning Policy Framework (NPPF).
Before the first occupation of the building(s) hereby permitted the following windows shall be fitted with Pilkington Level 4 obscured glazing or equivalent and shall be permanently retained in that condition thereafter: - The first floor window in the flank elevation of plots 24 and 26 serving bedroom 2. - The first floor windows in the flank elevation of plot 38 serving the landing and bathroom Reason: To protect the amenities of adjoining/nearby properties from unacceptable overlooking/loss of privacy and/or represent quality design in accordance with policy SWDPR 35 of the South Worcestershire Development Plan Review and the aims and objectives of the National Planning Policy Framework (NPPF).
The development hereby permitted shall be carried out in accordance with the details contained in the Refuse & Recycling Storage & Auto Track Layout: 392-00-150 P1 approved under condition 26 of permission Ref: W/23/01681/FUL. Reason: To ensure a satisfactory form of development, in accordance with policies SWDPR 01, SWDPR 05 and SWDPR 28 of South Worcestershire Development Plan Review and the aims and objectives of the National Planning Policy Framework (NPPF).
The development hereby permitted shall be carried out in accordance with the following details of proposed utilities connections to facilitate super-fast broadband connectivity approved under condition 27 of permission Ref: W/23/01681/FUL: • Letter from Openreach dated 24th January 2025 • Openreach plan of site showing fibre network – Ref: POP/00K Reason: To ensure that the new development includes broadband that allows residents to choose how they work, how they interact with services and facilities and to provide a greater opportunity for home working and a reduction in car based commuting in accordance with policy SWDPR 36 of the South Worcestershire Development Plan Review and the aims and objectives of the National Planning Policy Framework (NPPF).
The development hereby permitted shall be carried out in accordance with the details contained in the Drainage Strategy and Water Management Strategy Report (Revision D) approved under condition 28 of permission Ref: W/23/01681/FUL and thereafter retained in accordance with the approved details. Reason: To ensure sustainability measures are taken into account in the development in accordance with policies SWDPR 38 and SWDPR 39 of the South Worcestershire Development Plan Review and the aims and objectives of the National Planning Policy Framework (NPPF).
Positive and Proactive Statement. In dealing with this application, the Council has worked with the applicant in the following ways:- - seeking further information following receipt of the application; - seeking amendments to the proposed development following receipt of the application; - considering the imposition of conditions and or the completion of a s.106 legal agreement. In such ways the Council has demonstrated a positive and proactive manner in seeking solutions to problems arising in relation to the planning application.
The applicant should be aware that polluting the nearby watercourse, for instance by allowing the discharge of sediment rich runoff from the construction site, might constitute an environmental offence. The applicant is expected to fully assess the risks from all pollution sources and pathways and take sufficient precautionary measures to mitigate these risks for this development.

Copyright Notice

Plans, drawings and material submitted to the council are protected by the copyright acts (section 47, 1988 act). You may only use material which is downloaded and/or printed for consultation purposes, to compare current applications with previous schemes and to check whether developments have been completed in accordance with approved plans. Further copies must not be made without the prior permission of the copyright owner.

Tick here to show you have read and agree with the Copyright Notice.

Document Download Tips

  • In order to view the documents please ensure you have ticked the Copyright Notice box above.
  • In order to view PDF documents, you will need to have the free Adobe Acrobat Reader software installed on your computer. Click here to download.
  • To view individual documents click on the 'Document Type' on the row you require and the document will open as an Adobe Acrobat pdf.
  • To download multiple documents in one go, tick all the boxes relating to the documents you wish to view and click Download selected files button.
  • If you wish to download ALL documents place a tick in the box in the header row and click 'Download Selected Files' button.
  • Note: some devices such as iPads that use iOS browsers do not have the standard capability to download multiple files as a default function. If you are experiencing difficulties you may need to download a free application to enable you to do this - known as a zip file. Go to the AppStore to download a zip file ‘app’.

How to reorder or group rows

Click on a column heading for the ability to sort the ‘group’ listing in ascending or descending order by using the up/down arrows. This is useful to sort by ‘name/organisation’.

Document Type Date Description File Size Drawing/Rev Number
Application Documents
Application Plans
Neighbour and Other Response
Statutory Consultee Response
Decision

Consultation Responses

Neighbour List


In addition to consultations with the consultee listed, we will publicise the application in accordance with national requirements and our local policy. This publicity usually takes the form of letters to nearby properties, the posting of site notices and/or the placing of a public notice in our local newspapers.


Address Sent Reply Received
Milina 4 The Lapwings Drakes Broughton PERSHORE WR10 2FS 18/03/2026
1 Williamson Way Drakes Broughton PERSHORE WR10 2FR 19/03/2025
11 Williamson Way Drakes Broughton PERSHORE WR10 2FR 19/03/2025
15 Williamson Way Drakes Broughton PERSHORE WR10 2FR 19/03/2025
17 Williamson Way Drakes Broughton PERSHORE WR10 2FR 19/03/2025
19 Williamson Way Drakes Broughton PERSHORE WR10 2FR 19/03/2025
21 Williamson Way Drakes Broughton PERSHORE WR10 2FR 19/03/2025
23 Williamson Way Drakes Broughton PERSHORE WR10 2FR 19/03/2025
25 Williamson Way Drakes Broughton PERSHORE WR10 2FR 19/03/2025
27 Williamson Way Drakes Broughton PERSHORE WR10 2FR 19/03/2025
29 Williamson Way Drakes Broughton PERSHORE WR10 2FR 19/03/2025
3 Williamson Way Drakes Broughton PERSHORE WR10 2FR 19/03/2025
31 Williamson Way Drakes Broughton PERSHORE WR10 2FR 19/03/2025
33 Williamson Way Drakes Broughton PERSHORE WR10 2FR 19/03/2025
35 Williamson Way Drakes Broughton PERSHORE WR10 2FR 19/03/2025
37 Williamson Way Drakes Broughton PERSHORE WR10 2FR 19/03/2025
39 Williamson Way Drakes Broughton PERSHORE WR10 2FR 19/03/2025
41 Williamson Way Drakes Broughton PERSHORE WR10 2FR 19/03/2025
43 Williamson Way Drakes Broughton PERSHORE WR10 2FR 19/03/2025
45 Williamson Way Drakes Broughton PERSHORE WR10 2FR 19/03/2025
47 Williamson Way Drakes Broughton PERSHORE WR10 2FR 19/03/2025
5 Williamson Way Drakes Broughton PERSHORE WR10 2FR 19/03/2025
7 Williamson Way Drakes Broughton PERSHORE WR10 2FR 19/03/2025
77 Stonebow Road Drakes Broughton PERSHORE WR10 2AP 19/03/2025
79 Stonebow Road Drakes Broughton PERSHORE WR10 2AP 19/03/2025
81 Stonebow Road Drakes Broughton PERSHORE WR10 2AP 19/03/2025
83 Stonebow Road Drakes Broughton PERSHORE WR10 2AP 19/03/2025
85 Stonebow Road Drakes Broughton PERSHORE WR10 2AP 19/03/2025
87 Stonebow Road Drakes Broughton PERSHORE WR10 2AP 19/03/2025
89 Stonebow Road Drakes Broughton PERSHORE WR10 2AP 19/03/2025
9 Williamson Way Drakes Broughton PERSHORE WR10 2FR 19/03/2025
91 Stonebow Road Drakes Broughton PERSHORE WR10 2AP 19/03/2025
93 Stonebow Road Drakes Broughton PERSHORE WR10 2AP 19/03/2025
95 Stonebow Road Drakes Broughton PERSHORE WR10 2AP 19/03/2025
97 Stonebow Road Drakes Broughton PERSHORE WR10 2AP 19/03/2025
99 Stonebow Road Drakes Broughton PERSHORE WR10 2AP 19/03/2025
Freshfields 75 Stonebow Road Drakes Broughton PERSHORE WR10 2AP 19/03/2025
Laurel House 99A Stonebow Road Drakes Broughton PERSHORE WR10 2AP 19/03/2025

Consultee List


Name Organisation Sent Reply Due Reply Received
Cllr Liz Turier Drakes Broughton, Norton & Whittington Ward 19/03/2025 09/04/2025
Cllr Rob Adams Drakes Broughton, Norton & Whittington Ward 19/03/2025 09/04/2025
Danielle Lyons Drakes Broughton & Wadborough Parish Council 19/03/2025 09/04/2025
Drainage Engineer Engineers - S.W. Land Drainage Partnership 19/03/2025 09/04/2025

Constraints List


Constraints List
Neighbourhood Plan: NPA Boundaries
Agricultural Occupancy condition may apply: W/99/00764/PP
Agricultural Occupancy condition may apply: 79/00910
Agricultural Occupancy condition may apply: W/99/01433/OU
Paper: Evesham Journal - Thursday
CIL008 - Non-Urban Area
Outside SWDP Development Boundary
Public Right of Way: Type- Footpath. Path No- DB-527 B
Agricultural Occupancy condition may apply: W/96/00650/PP
Minor Aquifer
Section 106 Agreement
Surface Water: High 1 in 30 extent
Surface Water: Medium 1 in 100 extent
Surface Water: Low 1 in 1000 extent
Wind Turbines
Policy Case HLA - PAR/31/53/HOU. Thornleigh Nurseries, Stonebow Road, Drakes Broughton, Pershore, WR10 2AP. MKT GDNR'S UNIT. Open Market. Small windfall (HLA only)
Policy Case HLA - PAR/31/67/HOU. Thornleigh Nurseries, Stonebow Road, Drakes Broughton, Pershore, WR10 2AP. Erection of 2 detached houses and alterations to access. Open Market. Small site (EMP only)
Policy Case HLA - PAR/31/62/HOU. Thornleigh Nurseries, Stonebow Road, Drakes Broughton, Pershore, WR10 2AP. Erection of nine new houses & two bungalows for affordable rented housing (resubmission of application W/11/00175/PN).. Affordable. Large windfall (HLA only)
SWDP 15: Designated Rural Areas
SWDP 5: Protect and Restore
SWDP60x: Housing Allocations
Public Right of Way: Type- Footpath. Path No- DB-526 B
Public Right of Way: Type- Footpath. Path No- DB-508 C
No associated appeals