| Condition Details / Information Notes |
| The works to which this Listed Building Consent relates must be commenced before the expiration of three years beginning with the date of this consent.
Reason: To conform with the requirements of Section 18 of the Planning (Listed Buildings and Conservation Areas) Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
| Unless where required or allowed by other conditions attached to this permission/consent, the development hereby approved shall be carried out in accordance with the information (including details on the proposed materials) provided on the application form and the following plans/drawings/documents –
Design, access and Heritage Statement Recieved 31st March 2025
Timber Window Refurb Method Statement Recived 31st March 2025
Drawing Numbers:
0300-0304 Inclusive
0500-0503 Inclusive
0700.
Reason: To define the permission in accordance with Policy SWDP1 and SWDP2 of the South Worcestershire Development Plan and the National Planning Policy Framework. |
| Prior to its/their installation as part of the development hereby approved, details of the following shall be submitted to and approved in writing by the local planning authority:-
-
New external joinery details along with architectural details of the proposed external finishes, heads, sills, position in wall reveal and any surrounding dressings (elevational drawings at a minimum scale of 1:20 and vertical sectional drawings at minimum scale of 1:2);
-
a precise specification and method for the removal of the external render and for the replacement lime render – including detailed specification of the mix, the number of coats and surface finish to be used;
Reason: To protect, conserve and enhance the significance of heritage assets and to ensure that the new materials are in keeping with the surroundings and/or represent quality design in accordance with policies SWDP 6, SWDP21 and SWDP24 of the South Worcestershire Development Plan. |
| Prior to their installation as part of the development hereby approved, details of the following shall be submitted to and approved in writing by the local planning authority:-
-
Detailed schedule of thermal and sound insulation and damp proofing proposals for the building;
-
Details of new and/or relocated soil and vent pipes with their connecting waste pipes;
-
Detailed plans at minimum 1:100 of all plumbing, to include no chasing for pipework, pipe runs and locations of radiators
Detailed floor plans at minimum 1:100 of the where new or replacement lime plaster is proposed including plaster mix, surface finish and method of fixing to the wall;
-
Detailed floor plans at minimum 1:100 for rewiring, to include no chasing of wires, runs of wiring, socket and light locations
Reason: To protect, conserve and enhance the significance of heritage assets and to ensure that the new materials are in keeping with the surroundings and/or represent quality design in accordance with policies SWDP 6, SWDP21 and SWDP24 of the South Worcestershire Development Plan. |
| No building operations hereby permitted shall commence until details of the materials to be used in the construction of the external surfaces of the building hereby permitted have been submitted to and approved in writing by the local planning authority.
The details to be submitted shall include:-
Type, colour, texture, size, coursing, finish, jointing and pointing of brickwork/stonework;
- type, colour, texture, size and design of roofing materials;
- sample panel of the brickwork, type of pointing and the mortar to be used with the panel kept on site for reference;
- type of mortar;
-
a precise specification of Brick cleaning method
Reason: To protect, conserve and enhance the significance of heritage assets and to ensure that the new materials are in keeping with the surroundings and/or represent quality design in accordance with policies SWDP 6, SWDP21 and SWDP24 of the South Worcestershire Development Plan. |
| Prior to the commencement of works, an historic building recording is required which is
commensurate with the requirements of level 2, as set out within Historic England guidance
Understanding Historic Buildings; A Guide to Good Recording Practice (2016) and in
accordance with current Worcestershire Archaeological Standards and Guidance (2019).
(A) No development shall take place until a programme of archaeological work, including a
Written Scheme of Investigation, has been submitted to and approved by the local planning
authority in writing. The scheme shall include an assessment of significance and research
questions; and:
1) The programme and methodology of site investigation and recording.
2) The programme for post investigation assessment.
3) Provision to be made for analysis of the site investigation and recording.
4) Provision to be made for publication and dissemination of the analysis and records of the
site investigation.
5) Provision to be made for archive deposition of the analysis and records of the site
investigation.
6) Nomination of a competent person or persons/organisation to undertake the works set out
within the Written Scheme of Investigation.
(B) The development shall not be occupied until the site investigation and post investigation
assessment has been completed in accordance with the programme set out in the Written
Scheme of Investigation approved under condition A) and the provision made for analysis,
publication and dissemination of results and archive deposition has been secured.
Reason: In accordance with the requirements of paragraphs 207 and 218 of the National
Planning Policy Framework (as amended) and SWDP 6 & 24 of the South Worcestershire
Development Plan 2016.
Note: A fee is chargeable for the provision of archaeological curatorial services. The service
includes advice and liaison throughout the archaeological works, including the provision of a
brief (if requested), checking the Written Scheme of Investigation for compliance with local
and national standards, monitoring fieldwork and ensuring any archaeological reports
generated by the project are acceptable. The Archaeology and Planning Advisor will be
happy to offer advice on all stages of the proceedings. Additional site visits will be
chargeable at £60 per visit if required if it is considered that breaches of condition have
taken place or when other situations arise that require a visit additional to the usual service.
As this scheme is considered to be a small-scale development of less than 1-ha the fee for
curatorial services will be £140.00 (Inc VAT).( |