| Condition Details / Information Notes |
| The development hereby permitted shall be begun before the expiration of three years from the date of this permission.
Reason: To conform with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
| Unless where required or allowed by other conditions attached to this permission/consent, the development hereby approved shall be carried out in accordance with the information (including details on the proposed materials) provided on the application form and the following plans/drawings/documents –
Site Location Plan - ver. 5.0 August 2025
Existing and Proposed Block Plan - ver. 4.0 August 2025
Block Layout Plan - ver. 5.0 August 2025
Aerial View - ver. 5.0 August 2025
Elevations - ver. 4.0 August 2025
Floorplan - ver. 3.0 May 2025
Reason: To define the permission in accordance with Policy SWDP1 and SWDP2 of the South Worcestershire Development Plan and the National Planning Policy Framework. |
| No development above floor slab level shall commence until details of the materials to be used in the construction of the external surfaces of the barn hereby permitted have been submitted to and approved in writing by the local planning authority. The details to be submitted shall include:-
- a precise specification of the colour and surface finish of the proposed steel cladding for the external walls and roof to include RAL number.
The development shall be carried out using the materials as approved.
Reason - To ensure that the new materials are in keeping with the surroundings and/or represent quality design in accordance with policy SWDP21 of the South Worcestershire Development Plan and the relevant aims and objectives of the National Planning Policy Framework.
|
| Before the first use of the development hereby permitted a scheme of landscaping shall be submitted to and approved in writing by the Local Planning Authority. The landscaping scheme shall include:-
(i) a plan(s) showing details of all existing trees and hedges on the application site. The plan should include, for each tree/hedge, the accurate position, canopy spread and species, together with an indication of any proposals for felling/pruning and any proposed changes in ground level, or other works to be carried out, within the canopy spread.
(ii) a plan(s) showing the layout of proposed tree, hedge and shrub planting and grass areas.
(iii) a schedule of proposed planting - indicating species, sizes at time of planting and numbers/densities of plants.
(iv) a written specification outlining cultivation and other operations associated with plant and grass establishment.
(v) a schedule of maintenance, including watering and the control of competitive weed growth, for a minimum period of five years from first planting.
All planting and seeding/turfing shall be carried out in accordance with the approved details in the first planting and seeding/turfing seasons following the completion or first occupation/use of the development, whichever is the sooner.
The planting shall be maintained in accordance with the approved schedule of maintenance. Any trees or plants which, within a period of five years from the completion of the planting, die, are removed or become seriously damaged or diseased shall be replaced in the next planting season with others of similar size and species.
Reason - To ensure the proposed development does not have an adverse effect on the character and appearance of the area in accordance with policies SWDP21 and SWDP25 of South Worcestershire Development Plan and the relevant aims and objectives of the National Planning Policy Framework. |
| The development shall not commence until a Habitat Management and Monitoring Plan (the HMMP), has been prepared in accordance with the approved Biodiversity Gain Plan, the approved landscape scheme and BNG assessments and calculations, submitted to and approved in writing by the Local Planning Authority. It shall include:
(a) a non-technical summary;
(b) the roles and responsibilities of the people or organisation(s) delivering the HMMP;
(c) the planned habitat creation and enhancement works to create or improve habitat to achieve the biodiversity net gain in accordance with the approved Biodiversity Gain Plan;
(d) the management measures to maintain habitat in accordance with the approved Biodiversity Gain Plan for a period of 30 years from the completion of development; and
(e) the monitoring methodology and frequency in respect of the created or enhanced habitat to be submitted to the local planning authority,
Notice in writing shall be given to the Council when the habitat creation and enhancement works as set out in the HMMP have been completed.
The created and enhanced habitat specified in the approved HMMP shall thereafter be managed and maintained in accordance with the approved HMMP.
Monitoring reports shall be submitted to the local planning authority in writing in accordance with the methodology and frequency specified in the approved HMMP.
The plan shall also set out where the results of the monitoring show that conservation aims and objectives of the HMMP are not being met, how contingencies and/or remedial action are identified, agreed and implemented so that the development still delivers the fully functioning biodiversity objectives of the originally approved scheme.
Reason: To ensure the development delivers a biodiversity net gain on site in accordance with Schedule 7A of the Town and Country Planning Act 1990 and SWDP22 of the South Worcestershire Development Plan, the relevant aims and objectives of the National Planning Policy Framework and the Environment Act 2021.
|
| The development hereby approved and land edged red and blue on the Block Layout Plan – ver. 5.0 August 2025 as listed under Condition 2 of this Decision Notice shall not be sold. Let, or sublet separately from each other
Reason – In the interests of sustainable development, to avoid piecemeal and unrelated development in the countryside and to comply with Policies SWDP1, SWDP2, SWDP4, and SWDP12 and the relevant aims and objectives of the National Planning Policy Framework |
| Notwithstanding the provisions of Schedule 2 of the Town and Country Planning (General Permitted Development) (England) Order 2015,(or any order revoking or re-enacting that Order with or without modification), no development which would otherwise be permitted under Classes Q, R and S of Part 3 of Schedule 2, shall be carried out.
Reason: In the interests of sustainable development and in order to protect the character and amenity of the locality, to maintain the amenities of adjoining property and to comply with Policies SWDP1, SWDP2, SWDP4 and SWDP24 and the National Planning Policy Framework. |
| The development hereby permitted shall not be first used until full details of surface water drainage systems to serve the development have been submitted to and approved in writing by the Local Planning Authority. The approved drainage works shall be implemented in accordance with the approved details before the first use of the development hereby permitted and shall be retained thereafter.
Reason: To ensure the proposed development does not exacerbate flood risk and deals with surface water run-off from the site in a sustainable manner, in accordance with policies SWDP28, SWDP29 and SWDP 30 of the South Worcestershire Development Plan. |
| The applicant is advised that the disposal of surface water to an existing ditch would not be acceptable. An alternative method for surface water disposal is required. |