| Application Number | W/25/00914/GPDQ |
| Status | Application Approved |
| Application Valid |
|---|
| 25/04/2025 |
| Consultation End |
|---|
| 30/05/2025 |
| Committee Meeting |
|---|
| N/A |
| Decision |
|---|
| Approval |
| Decision Date |
|---|
| 19/06/2025 |
| Appeal Started |
|---|
| N/A |
| Appeal Decision |
|---|
| N/A |
| Summary | |
| Application Number | W/25/00914/GPDQ |
| Location Address | Radford Landfill Site Alcester Road Radford |
| Proposal | Notification for Prior Approval for the proposed change of use of an Agricultural Building to 2 dwellinghouses (Class C3), and for building operations reasonably necessary for the conversion. |
| Status | Approval |
| Application Type | GPDQ - agricultural to C3 dwellinghouse |
| Appeal Decision | N/A |
| Important Dates | |
| Application Received Date | 25/04/2025 |
| Application Valid Date | 25/04/2025 |
| Consultation Start Date | 29/04/2025 |
| Site Visited / Site Notice Date | |
| Consultation End | 30/05/2025 |
| Advert Expiry | |
| Committee Date (if applicable) | |
| Committee Agenda | |
| Decision Date | 19/06/2025 |
| Further Information | |
| Expected Decision Level | Delegated |
| Case Officer | Karen Wightman (Mrs) |
| Parish | Rous Lench |
| Ward | Inkberrow Ward |
| Applicant | Mr Simon Crane |
| Agent | Mark Broughton-Taylor, TM Building Consultants |
| Agent Address | T M Building Consultants Columbine Cottage Worcester WR7 4YF |
| Condition Details / Information Notes |
| Development under Class Q is permitted subject to the condition that development under Class Q must be carried out in accordance with the following approved plans:- 2435/1A, 2435/2A Reason: To define the permission. |
| Unless otherwise agreed by the Local Planning Authority development, other than that required to be carried out as part of an approved scheme of remediation, must not commence until conditions 1 to 5 have been complied with: 1. A preliminary risk assessment (a Phase I desk study) submitted to the Local Authority in support of the application has identified unacceptable risk(s) exist on the site as represented in the Conceptual Site Model. A scheme for detailed site investigation must be submitted to and approved in writing by the Local Planning Authority prior to being undertaken to address those unacceptable risks identified. The scheme must be designed to assess the nature and extent of any contamination and must be led by the findings of the preliminary risk assessment. The investigation and risk assessment scheme must be compiled by competent persons and must be designed in accordance with the Environment Agency's "Land Contamination: Risk Management" guidance. 2. The detailed site investigation and risk assessment must be undertaken in accordance with the approved Scheme and a written report of the findings produced. This report must be approved by the Local Planning Authority prior to any development taking place. 3. Where the site investigation identified remediation is required, a detailed remediation scheme to bring the site to a condition suitable for the intended use by removing unacceptable risks to identified receptors must be prepared and is subject to the approval of the Local Planning Authority in advance of undertaking. The remediation scheme must ensure that the site will not qualify as Contaminated Land under Part 2A Environmental Protection Act 1990 in relation to the intended use of the land after remediation. 4. The approved remediation scheme must be carried out in accordance with its terms prior to the commencement of development, other than that required to carry out remediation, unless otherwise agreed in writing by the Local Planning Authority. 5. Following the completion of the measures identified in the approved remediation scheme a validation report that demonstrates the effectiveness of the remediation carried out must be produced, and is subject to the approval of the Local Planning Authority prior to the occupation of any buildings. 6. In the event that contamination is found at any time when carrying out the approved development that was not previously identified it must be reported in writing immediately to the Local Planning Authority. An investigation and risk assessment must be undertaken and where necessary a remediation scheme must be prepared, these will be subject to the approval of the Local Planning Authority. Following the completion of any measures identified in the approved remediation scheme a validation report must be prepared, which is subject to the approval in writing of the Local Planning Authority prior to the occupation of any buildings. Reason: To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors and to comply with policy SWDP31 and the relevant aims and objectives of the National Planning Policy Framework. |
| The applicant should also be aware, that notwithstanding the detail on the approved plans, Class Q only allows the provision of operational development to the actual building subject to conversion under the provisions of Class Q. The provision of operational development to create any additional form of hard surfacing to provide a vehicular/pedestrian means of access to the dwellings or, for off road parking provision, other than currently exists on site, are not permitted by Class Q and would require separate planning permission. In particular the applicant's attention is drawn to Article 3 (6) of the Town and Country Planning (General Permitted Development) (England) Order 2015, (as amended) which specifies:- The permission granted by Schedule 2 does not, except in relation to development permitted by Classes A, B, D and E of Part 9 and Class A of Part 18 of that Schedule, authorise any development which requires or involves the formation, laying out or material widening of a means of access to an existing highway which is a trunk road or classified road, or creates an obstruction to the view of persons using any highway used by vehicular traffic, so as to be likely to cause danger to such persons. |
| Buildings, and particularly roofs and the spaces underneath them, are frequently used as roosting sites by bats. Bats and their 'roost' sites are protected under the Wildlife and Countryside Act 1981 (as amended) and the Conservation of Habitats & Species Regulations 2010, the latter of which deems them a European Protected Species. It is a criminal offence to deliberately kill or injure a bat, to disturb or destroy a bat roost or to obstruct an entrance to a roost. If evidence of bats is found, work should stop immediately and an ecological consultant contacted for advice on the best way to proceed. All contractors working on site should be made aware of the advice and provided with the contact details of a relevant ecological consultant. |
| Work should avoid disturbance to nesting birds. Nesting birds are protected under the 1981 Wildlife and Countryside Act and the Countryside and Rights of Way Act 2000. The main nesting season lasts approximately from March to September, so work should take place outside these dates if at all possible. However, birds can nest at any time and the site including any buildings should ideally be checked for their presence immediately before work starts. |
Plans, drawings and material submitted to the council are protected by the copyright acts (section 47, 1988 act). You may only use material which is downloaded and/or printed for consultation purposes, to compare current applications with previous schemes and to check whether developments have been completed in accordance with approved plans. Further copies must not be made without the prior permission of the copyright owner.
Tick here to show you have read and agree with the Copyright Notice.
Document Download Tips
How to reorder or group rows
Click on a column heading for the ability to sort the ‘group’ listing in ascending or descending order by using the up/down arrows. This is useful to sort by ‘name/organisation’.
In addition to consultations with the consultee listed, we will publicise the application in accordance with national requirements and our local policy. This publicity usually takes the form of letters to nearby properties, the posting of site notices and/or the placing of a public notice in our local newspapers.
| No associated neighbours |
| Name | Organisation | Sent | Reply Due | Reply Received |
|---|---|---|---|---|
| Cllr Ben Hurdman | Inkberrow Ward | 29/04/2025 | 20/05/2025 | |
| Cllr Nick Dawkes | Inkberrow Ward | 29/04/2025 | 20/05/2025 | |
| Drainage Engineer | Engineers - S.W. Land Drainage Partnership | 29/04/2025 | 20/05/2025 | |
| Highways | County Highways | 29/04/2025 | 20/05/2025 | |
| WDC Natural Heritage & Biodiversity Officer | WDC Natural Heritage & Biodiversity | 29/04/2025 | 20/05/2025 | |
| Worcestershire Regulatory Services - Cont. Land | Worcestershire Regulatory Services | 29/04/2025 | 20/05/2025 | |
| Worcestershire Regulatory Services - Nuisance | Worcestershire Regulatory Services | 29/04/2025 | 20/05/2025 |
| Constraints List |
| SWDP 5: Protect and Restore |
| Contaminated Land |
| Paper: Evesham Journal - Thursday |
| Landfill Consultation |
| Outside SWDP Development Boundary |
| Section 106 Agreement |
| Historic Landfill Consultation (within 250m) |
| CIL008 - Non-Urban Area |
| Wind Turbines |
| Policy Case HLA - WDC/477/HOU. Radford Landfill Site, Alcester Road, Radford, (access opposite No. 1 & 2 Alcester Road, Radford WR7 4LS). Notification for Prior Approval for the proposed change of use of existing agricultural building to form two dwellings (Class C3) and associated operational development.. Open Market. Small windfall (HLA only) |
| SWDP 15: Designated Rural Areas |
| Surface Water: Low 1 in 1000 extent |
| Site of Special Scientific Interest |
| No associated appeals |