Application Number W/25/00966/FUL
Status Application Approved

Sign up to notifications on this planning application Back to search results New search

Planning Online Status


  • Application
    Valid
    06/06/2025
  • Consultation
    End
    10/07/2025
  • Committee
    Meeting
    N/A
  • Decision

    Approval
  • Decision
    Date
    25/07/2025
  • Appeal
    Started
    N/A
  • Appeal
    Decision
    N/A
Summary
Application Number W/25/00966/FUL
Location Address Holly House Manor Road Lower Moor Pershore WR10 2NZ
Proposal Vary Condition 2 (approved plans) of planning permission W/23/00407/FUL (Erection of 3 bed house at the bottom of the garden at Holly House)
Status Approval
Application Type Full planning permission
Appeal Decision N/A

Important Dates
Application Received Date 02/05/2025
Application Valid Date 06/06/2025
Consultation Start Date 11/06/2025
Site Visited / Site Notice Date
Consultation End 10/07/2025
Advert Expiry 10/07/2025
Committee Date (if applicable)
Committee Agenda
Decision Date 25/07/2025

Further Information
Expected Decision Level Delegated
Case Officer Frances Fleming
Parish Hill and Moor
Ward Pinvin Ward
Applicant Mr Jon Brewer, Purple Granite
Agent Mr Simon Blakemore, Blakemore Design
Agent Address 21 Williamson Way Drakes Broughton Pershore WR10 2FR

Condition Details / Information Notes
The development hereby permitted must be commenced not later than the expiration of three years from the date of the original permission (W/23/00407/FUL; 20/04/2024) Reason: To conform with the requirements of Sections 73 and 91 of the Town and Country Planning Act 1990 (as amended).
Unless where required or allowed by other conditions attached to this permission/consent, the development hereby approved shall be carried out in accordance with the information (including details on the proposed materials) provided on the application form and the following plans/drawings/documents – Location plan – historic overlay Location Plan 20.66 / 02 General Arrangement (site plan) 20.66 / 01 General Arrangement (elevations and floor plans) Archaeological Evaluation by Cursus Archaeology, dated October 2024 Written Scheme of Investigation by Cursus Archaeology, dated August 2024 Reason: In order to define the permission in accordance with Policy SWDP1 and SWDP2 of the South Worcestershire Development Plan and the National Planning Policy Framework.
Prior to the first occupation of the development hereby permitted, the details set out in the submitted Water Management Statement shall be fully implemented and remain thereafter. Reason: To ensure that an appropriate sustainable drainage system is provided to serve the development in accordance with policy SWDP29 of the South Worcestershire Development Plan and the relevant aims and objectives of the National Planning Policy Framework.
The Development hereby approved shall not be occupied until at least the first six metres of the improved access into the development, measured from the edge of the carriageway, has been surfaced in a bound material. REASON: In the interests of highway safety in accordance with policy SWDP4 and SWDP21 of the South Worcestershire Development Plan and the relevant aims and objectives of the National Planning Policy Framework.
One of the following to measures must be carried out :- a) Gas protection measures complying with Characteristic Situation 2 as set out in BS8485:2015 and CIRIA C665 as a minimum requirement must be incorporated within the foundations of the proposed structure(s). Following installation of these measures, and prior to the first occupation of the development, a verification report shall be submitted to and approved in writing by the Local Planning Authority. Verification of the installation of gas protection measures must be carried out in accordance with current UK guidance and best practice. Or b) A risk assessment should be undertaken to establish whether the proposed development is likely to be affected by landfill or ground gas or vapours. The risk assessment must be provided to and approved in writing by the Local Planning Authority, prior to the commencement of development. The assessment shall be carried out in accordance with current UK guidance and best practice. c) Where the approved risk assessment (required by condition (b) above) identifies ground gases or vapours posing unacceptable risks, no development shall commence until a detailed remediation scheme to protect the development from the effects of such ground gases or vapours has been submitted to and approved in writing by the Local Planning Authority. Following approval, the remediation scheme shall be implemented on site in complete accordance with approved details unless otherwise agreed in writing by the Local Planning Authority. d) Following implementation and completion of the approved remediation scheme (required by condition (c) above) and prior to the first occupation of the development, a verification report shall be submitted to and approved in writing by the Local Planning Authority to confirm completion of the remediation scheme in accordance with approved details. Verification of the installation of gas protection measures must be carried out in accordance with current UK guidance and best practice. Reason: To ensure that the risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecosystems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors. In accordance with policy SWDP31 of the South Worcestershire Development Plan and the relevant aims and objectives of the National Planning Policy Framework.
Before first occupation of any part of the development hereby permitted details of renewable or low carbon energy generating facilities to be incorporated as part of the development shall be submitted to and approved in writing by the local planning authority. The details shall demonstrate that at least 10% of the predicted energy requirements of the development will be met through the use of renewable/low carbon energy generating facilities. The approved facilities shall be provided prior to any part of the development hereby permitted being first occupied or in accordance with a timetable submitted to and approved by the local planning authority as part of the details required by this condition. Reason: To ensure the proposed development includes sufficient renewable/low carbon energy generating facilities to comply with Policy 27 of the South Worcestershire Development Plan and the relevant aims and objectives of the National Planning Policy Framework.
No building operations above dpc level shall commence until details of the materials to be used in the construction of the external surfaces of the dwelling hereby permitted have been submitted to and approved in writing by the local planning authority. The details to be submitted shall include:- - type, colour, texture, size, coursing, finish, jointing and pointing of brickwork/stonework; - type, colour, texture, size and design of roofing materials; - type of mortar. The development shall be carried out using the materials as approved. Reason: To protect, conserve and enhance the significance of heritage assets and to ensure that the new materials are in keeping with the surroundings and represent quality design in accordance with policies SWDP 6, SWDP21 and SWDP24 of the South Worcestershire Development Plan and the relevant aims and objectives of the National Planning Policy Framework.
Before the first occupation of the development hereby permitted a plan indicating the positions, design, materials and type of boundary treatment to be erected shall be submitted to and approved in writing by the local planning authority. The boundary treatment shall be completed before the first occupation of the development hereby permitted or in accordance with a timetable agreed in writing by the local planning authority. Development shall be carried out in accordance with the approved details. Reason - To protect the amenities of properties and ensure the proposed development does not have an adverse effect on the character and appearance of the area in accordance with policies SWDP21 and SWDP25 of South Worcestershire Development Plan and the relevant aims and objectives of the National Planning Policy Framework.
Positive and Proactive Statement. In dealing with this application, the Council has worked with the applicant in the following ways:- providing pre-application advice; - seeking further information following receipt of the application; - seeking amendments to the proposed development following receipt of the application;. In such ways the Council has demonstrated a positive and proactive manner in seeking solutions to problems arising in relation to the planning application.
The applicants attention is drawn to the existence of an agreement made under Section 106 of the Town and Country Planning Act 1990 (as amended), and the restrictions imposed therein.
All existing trees and hedges along the boundary lines of the application site shall be retained and maintained, as indicated on drawing 20.66 / 02A. If any retained tree/hedge is removed, uprooted or destroyed or dies, replacement planting shall be carried out in the first available planting season and shall be a minimum height of 3 metres. Reason – To preserve the visual amenities of the surrounding natural and built environment and to protect, conserve and enhance the setting of nearby heritage assets in accordance with policies SWDP6, SWDP21, SWDP24 and SWDP25 of the South Worcestershire Development Plan.

Copyright Notice

Plans, drawings and material submitted to the council are protected by the copyright acts (section 47, 1988 act). You may only use material which is downloaded and/or printed for consultation purposes, to compare current applications with previous schemes and to check whether developments have been completed in accordance with approved plans. Further copies must not be made without the prior permission of the copyright owner.

Tick here to show you have read and agree with the Copyright Notice.

Document Download Tips

  • In order to view the documents please ensure you have ticked the Copyright Notice box above.
  • In order to view PDF documents, you will need to have the free Adobe Acrobat Reader software installed on your computer. Click here to download.
  • To view individual documents click on the 'Document Type' on the row you require and the document will open as an Adobe Acrobat pdf.
  • To download multiple documents in one go, tick all the boxes relating to the documents you wish to view and click Download selected files button.
  • If you wish to download ALL documents place a tick in the box in the header row and click 'Download Selected Files' button.
  • Note: some devices such as iPads that use iOS browsers do not have the standard capability to download multiple files as a default function. If you are experiencing difficulties you may need to download a free application to enable you to do this - known as a zip file. Go to the AppStore to download a zip file ‘app’.

How to reorder or group rows

Click on a column heading for the ability to sort the ‘group’ listing in ascending or descending order by using the up/down arrows. This is useful to sort by ‘name/organisation’.

Document Type Date Description File Size Drawing/Rev Number
Application Documents
Application Plans
Neighbour and Other Response
Statutory Consultee Response
Decision

Consultation Responses

Neighbour List


In addition to consultations with the consultee listed, we will publicise the application in accordance with national requirements and our local policy. This publicity usually takes the form of letters to nearby properties, the posting of site notices and/or the placing of a public notice in our local newspapers.


Address Sent Reply Received
Wymondley May Tree Road Lower Moor PERSHORE WR10 2NY 10/07/2025
Holly House Manor Road Lower Moor PERSHORE WR10 2NZ 11/06/2025 21/06/2025
8 Back Way Lower Moor PERSHORE WR10 2PG 11/06/2025
Orchard House Manor Road Lower Moor PERSHORE WR10 2NZ 11/06/2025
The Hawthorns 5 Back Way Lower Moor PERSHORE WR10 2PG 11/06/2025
Abbey House 1 Back Way Lower Moor PERSHORE WR10 2PG 11/06/2025
The Hawthorns 5 Back Way Lower Moor PERSHORE WR10 2PG 11/06/2025
Cherrymead Manor Road Lower Moor PERSHORE WR10 2NZ 11/06/2025
Anvil Cottage Blacksmiths Lane Lower Moor PERSHORE WR10 2PA 11/06/2025

Consultee List


Name Organisation Sent Reply Due Reply Received
Aidan Smyth WDC - Archaeology & Planning Advisor 11/06/2025
Chief Executive Officer Worcestershire Local Medical Commmittee Limited 11/06/2025
Cllr Elizabeth Tucker Pinvin Ward 11/06/2025
Drainage Engineer Engineers - S.W. Land Drainage Partnership 11/06/2025
Highways County Highways 11/06/2025
Landscape Officer WDC Landscape Officer 11/06/2025
Ms C Hirst Hill & Moor Parish Council 11/06/2025
WDC Heritage Officer WDC Heritage Officer 11/06/2025
WDC Natural Heritage & Biodiversity Officer WDC Natural Heritage & Biodiversity 11/06/2025
Worcestershire Regulatory Services - Cont. Land Worcestershire Regulatory Services 11/06/2025

Constraints List


Constraints List
Paper: Evesham Journal - Thursday
CIL008 - Non-Urban Area
Landfill Consultation
Section 106 Agreement
Surface Water: Low 1 in 1000 extent
Wind Turbines
Policy Case HLA - PAR/47/09/HOU. Holly House, Manor Road, Lower Moor, Pershore, WR10 2NZ. COX HOMES. Affordable. Small site (EMP only)
Policy Case HLA - WDC/697/HOU. Holly House, Manor Road, Lower Moor, Pershore, WR10 2NZ. Erection of 3 bed house at the bottom of the garden at Holly House . Open Market. Small windfall (HLA only)
SWDP 15: Designated Rural Areas
SWDP 2: Development Boundary
SWDP 5: Protect and Restore
Minor Aquifer
No associated appeals