| Condition Details / Information Notes |
| The development hereby permitted shall be begun before the expiration of three years from the date of this permission.
Reason: To conform with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
| Positive and Proactive Statement. No problems have arisen in dealing with this application. The planning application sought an acceptable form of development consistent with the requirements of relevant policies and material considerations. No amendments or alterations were therefore required and no further positive or proactive action was deemed necessary. |
| Unless where required or allowed by other conditions attached to this permission/consent, the development hereby approved shall be carried out in accordance with the information (including details on the proposed materials) provided on the application form and the following plans/drawings/documents –
63 – Proposed Entrance Gate Plan & Elevation
62 C – Proposed Entrance Gate Plan & Elevation
J1126 B – Location Plan
Reason: To define the permission in accordance with Policy SWDP1 and SWDP2 of the South Worcestershire Development Plan and the National Planning Policy Framework. |
| Prior to the first use/occupation of the development hereby permitted, the details set out in the submitted Water Management Statement shall be fully implemented and remain thereafter.
Reason: To ensure that an appropriate sustainable drainage system is provided to serve the development in accordance with policy SWDP29 of the South Worcestershire Development Plan 2016. |
| The development hereby permitted shall be carried out in strict accordance with the recommendations set out in the Tree Survey Report (BS5837: 2012) – Revision (-)
carried out by AJSP Woodland Management dated 13th May 2025
and submitted with this application.
Reason - To prevent existing trees/hedges from being damaged during construction work and to preserve the amenities of the locality. In accordance with policy SWDP 22 and SWDP 25 of the South Worcestershire Development Plan |
| A bat box shall be installed within the land ownership of the site (e.g. Ibstock enclosed bat box, Habibat bat box, Schwegler Wall-mounted Bat Shelter 2FE, Schwegler 2F Bat Box). The box should be installed at least 4m above ground-level, and not placed above windows. The roosting feature shall be installed before the first use of any part of the development.
Reason: To ensure the development contributes to the conservation and enhancement of biodiversity within the site and the wider area in accordance with policy SWDP22 of the South Worcestershire Development Plan.
|
| Prior to the commencement of the development hereby approved, details of the wall foundations, their required depths and method of excavation shall be submitted to and approved in writing by the Local Planning Authority.
Either a pile or pile and void foundation technique should be used. The foundations must be kept to the minimal depth that is deemed necessary for this development. Plant machinery used for the proposed foundation excavation is required to use a loading dispersing planking technique.
The development shall be carried out in accordance with the approved details.
Reason - To prevent existing trees/hedges from being damaged during construction work and to preserve the amenities of the locality. In accordance with policy SWDP 22 and SWDP25 of the South Worcestershire Development Plan.
|
| The materials to be used in the construction of the external surfaces of the wall hereby permitted shall match in type, colour, texture, size, coursing, jointing and pointing to those used in the existing wall surrounding the property.
Reason: To protect, conserve and enhance the significance of heritage assets and to ensure that the new materials are in keeping with the surroundings and/or represent quality design in accordance with policies SWDP 6, SWDP21 and SWDP24 of the South Worcestershire Development Plan. |
| (A) No development shall take place until a programme of archaeological work, including a Written Scheme of Investigation, has been submitted to and approved by the local planning authority in writing. The scheme shall include an assessment of significance and research questions; and:
1) The programme and methodology of site investigation and recording.
2) The programme for post investigation assessment.
3) Provision to be made for analysis of the site investigation and recording.
4) Provision to be made for publication and dissemination of the analysis and records of the site investigation.
5) Provision to be made for archive deposition of the analysis and records of the site investigation.
6) Nomination of a competent person or persons/organisation to undertake the works set out within the Written Scheme of Investigation.
(B) The development shall not be occupied until the site investigation and post investigation assessment has been completed in accordance with the programme set out in the Written Scheme of Investigation approved under condition (A) and the provision made for analysis, publication and dissemination of results and archive deposition has been secured.
Reason: In accordance with the requirements of paragraphs 207 and 218 of the National Planning Policy Framework (as amended) and SWDP 6 & 24 of the South Worcestershire Development Plan 2016.
|