| Condition Details / Information Notes |
| The development hereby permitted must be commenced not later than the expiration of three years from the date of the original permission W/23/01193/FUL dated 18.09.24.
Reason: To conform with the requirements of Sections 73 and 91 of the Town and Country Planning Act 1990 (as amended). |
| Unless where required or allowed by other conditions attached to this permission/consent, the development hereby approved shall be carried out in accordance with the information (including details on the proposed materials) provided on the application form and the following plans/drawings/documents –
4862 100 - Site Location Plan
4862 102 Rev A - Proposed Site Plan
4862 103 - House Type 1 Plans and Elevations
4862 104 - House Type 2 Plans and Elevations
4862 105 - House Type 3 Plans and Elevations
4862 106 - House Type 4 Plans and Elevations
4862 107 - Proposed Site Elevations
Reason: To define the permission in accordance with Policy SWDP1 and SWDP2 of the South Worcestershire Development Plan and the relevant aims and objectives of the National Planning Policy Framework. |
| The development hereby permitted shall not commence until an ecological mitigation and enhancement scheme has been submitted to and approved in writing by the local planning authority. The scheme shall be based on the recommendations contained within the Preliminary Ecological Appraisal Report by Indigo Surveys dated 15 November 2022 and shall include an implementation timetable. Thereafter, the ecological mitigation and enhancement scheme shall be carried out in accordance with the approved details and timetable.
Reason: To ensure the development contributes to the conservation and enhancement of biodiversity within the site and the wider area in accordance with policy SWDP22 of the South Worcestershire Development Plan and the relevant aims and objectives of the National Planning Policy Framework. |
| The development hereby permitted shall be carried out in accordance with the 'Revised Construction Environment Management Plan' (‘CEMP’) and Drawing titled 'Proposed Site Plan', Drg No.4862-SK10, further annotated/ labelled thereon 'Construction Management Plan', both received 29 August 2025.
Reason: To protect existing and new occupiers of residential areas from the unreasonable effects of noise, vibration, light and dust nuisance, minimise the risk of accidents for the duration of the construction, in accordance with Policies SWDP4, 21 and 22 of the South Worcestershire Development Plan and the relevant aims and objectives of the National Planning Policy Framework. |
| The development hereby permitted shall not be occupied until full details of all foul and surface water drainage systems to serve the development have been submitted to and approved in writing by the Local Planning Authority. The approved drainage works shall be implemented in accordance with the approved details before the first occupation of the development hereby permitted and shall be retained thereafter.
Reason: To ensure development would not result in unacceptable risk of pollution or harm to the environment and to ensure the proposed development does not exacerbate flood risk and deals with surface water run-off from the site in a sustainable manner, in accordance with policies SWDP28, SWDP29 and SWDP 30 of the South Worcestershire Development Plan and the relevant aims and objectives of the National Planning Policy Framework. |
| Development shall be implemented in accordance with the Ground Investigation Report, ref, 25543v01 dated 06.05.25 and in accordance with Parts 1 to 6, unless otherwise agreed in writing by the Local Planning Authority.
Part 1
Where an unacceptable risk is identified a scheme for detailed site investigation must be submitted to and approved in writing by the local planning authority prior to being undertaken. The scheme must be designed to assess the nature and extent of any contamination and must be led by the findings of the preliminary risk assessment. The investigation and risk assessment scheme must be compiled by competent persons and must be designed in accordance with the Environment Agency’s “Land Contamination: Risk Management” guidance.
Part 2
Where part 1 applies, detailed site investigation and risk assessment must be undertaken, and a written report of the findings produced. This report must be approved by the local planning authority prior to any development taking place. The investigation and risk assessment must be undertaken by competent persons and must be conducted in accordance with the Environment Agency’s “Land Contamination: Risk Management” guidance.
Part 3
Where identified as necessary a detailed remediation scheme to bring the site to a condition suitable for the intended use by removing unacceptable risks to identified receptors must be prepared and is subject to the approval of the local planning authority in advance of undertaking. The remediation scheme must ensure that the site will not qualify as Contaminated Land under Part 2A Environmental Protection Act 1990 in relation to the intended use of the land after remediation.
Part 4
The approved remediation scheme must be carried out in accordance with its terms prior to the commencement of development, other than that required to carry out remediation, unless otherwise agreed in writing by the local planning authority.
Part 5
Following the completion of the measures identified in the approved remediation scheme a validation report that demonstrates the
effectiveness of the remediation carried out must be produced and is subject to the approval of the local planning authority prior to the occupation of any buildings.
Part 6
In the event that contamination is found at any time when carrying out the approved development that was not previously identified it
must be reported in writing immediately to the local planning authority. An investigation and risk assessment must be undertaken and where necessary a remediation scheme must be prepared; these will be subject to the approval of the local planning authority. Following the completion of any measures identified in the approved remediation scheme a validation report must be prepared, which is subject to the approval in writing of the local planning authority prior to the occupation of any buildings.
Reason: To ensure that the proposed development avoids significant adverse impacts from pollution in accordance with policy SWDP31 of the South Worcestershire Development Plan and the relevant aims and objectives of the National Planning Policy Framework. |
| Before the first occupation of the development hereby permitted a plan indicating the positions, design, materials and type of boundary treatment to be erected shall be submitted to and approved in writing by the local planning authority The boundary treatment shall be completed before the first occupation of the development hereby permitted. Development shall be carried out in accordance with the approved details.
Reason - To protect the amenities of properties and ensure the proposed development does not have an adverse effect on the character and appearance of the area in accordance with policies SWDP21 and SWDP25 of South Worcestershire Development Plan and the relevant aims and objectives of the National Planning Policy Framework. |
| Before the first occupation of the development hereby permitted a scheme of landscaping shall be submitted to and approved in writing by the Local Planning Authority. The landscaping scheme shall include:-
(i) a plan(s) showing details of all existing trees and hedges on the application site. The plan should include, for each tree/hedge, the accurate position, canopy spread and species, together with an indication of any proposals for felling/pruning and any proposed changes in ground level, or other works to be carried out, within the canopy spread.
(ii) a plan(s) showing the layout of proposed tree, hedge and shrub planting and grass areas.
(iii) a schedule of proposed planting - indicating species, sizes at time of planting and numbers/densities of plants.
(iv) a written specification outlining cultivation and other operations associated with plant and grass establishment.
(v) a schedule of maintenance, including watering and the control of competitive weed growth, for a minimum period of five years from first planting.
All planting and seeding/turfing shall be carried out in accordance with the approved details in the first planting and seeding/turfing seasons following the completion or first occupation of the development, whichever is the sooner.
The planting shall be maintained in accordance with the approved schedule of maintenance. Any trees or plants which, within a period of five years from the completion of the planting, die, are removed or become seriously damaged or diseased shall be replaced in the next planting season with others of similar size and species.
Reason - To ensure the proposed development does not have an adverse effect on the character and appearance of the area in accordance with policies SWDP21 and SWDP25 of South Worcestershire Development Plan and the relevant aims and objectives of the National Planning Policy Framework. |
| Prior to the first occupation of the development hereby permitted, details of any external lighting to be provided in association with the
development shall be submitted to and approved in writing by the local planning authority. The development shall be implemented in accordance with the approved lighting. Only external lighting in accordance with approved details shall be provided on the application site. Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (or any Order revoking or re-enacting that Order with or without modification) there shall be no other external lighting provided on the application site
Reason - To ensure the proposed development does not have an adverse effect on the character and appearance of the area in accordance with policies SWDP1, SWDP21 and SWDP25 of South Worcestershire Development Plan and to ensure the development contributes to the conservation and enhancement of biodiversity within the site and the wider area in accordance with policy SWDP22 of the South Worcestershire Development Plan and the relevant aims and objectives of the National Planning Policy Framework. |
| The development hereby permitted shall not be occupied until the access, turning and parking areas have been provided in accordance with
Drawing No. 4862-102. Thereafter, these areas shall be retained and kept available for their respective approved uses at all times.
Reason - In the interests of highway safety and to ensure the free flow of traffic using the adjoining highway in accordance with Policies SWDP 4 and SWDP 21 of the South Worcestershire Development Plan and the relevant aims and objectives of the National Planning Policy Framework.
|
| The development hereby permitted shall not be occupied until visibility splays are provided in accordance with Proposed Site Access: Drawing Number 24415-02 Rev A. Thereafter, the required visibility splays shall be maintained free of any obstruction.
Reason - In the interests of highway safety
in accordance with Policies SWDP 4 and SWDP 21 of the South Worcestershire Development Plan and the relevant aims and objectives of the National Planning Policy Framework. |
| Prior to the first occupation of any dwelling hereby permitted, secure cycle parking for each dwelling shall be provided in accordance with a scheme to be submitted to and approved by the local planning authority. Thereafter, the secure cycle parking shall be retained for the lifetime of the development.
Reason - To comply with the Council’s parking standards
and encourage sustainable forms of travel in accordance with Policy SWDP 4 of the South Worcestershire Development Plan and the relevant aims and objectives of the National Planning Policy Framework. |
| Prior to the first occupation of any of the dwellings hereby approved, details of superfast broadband facilities or alternative solutions to serve the dwellings hereby approved shall be submitted to and approved in writing by the local planning authority. The submitted details shall include an implementation programme. The facilities shall be provided in accordance with the approved details.
Reason: To ensure the proposal incorporates satisfactory telecommunication facilities in line with policy SWDP26 of the South Worcestershire Development Plan 2016 and the relevant aims and objectives of the National Planning Policy Framework.
|
| Prior to the first occupation of any dwelling hereby permitted, details of renewable or low carbon energy generating facilities to be incorporated for that dwelling shall be submitted to and approved in writing by the local planning authority, including a timetable for implementation. The details shall demonstrate that at least 10% of the predicted energy requirements of the development will be met using renewable/low carbon energy generating facilities. Thereafter, the development shall be implemented in accordance with the approved details and timescale.
Reason: To ensure the proposed development includes sufficient renewable/low carbon energy generating facilities to comply with Policy 27 of the South Worcestershire Development Plan and the relevant aims and objectives of the National Planning Policy Framework. |
| Prior to the first occupation of any dwelling hereby permitted, details of water efficiency measures, including a timetable for implementation shall be submitted to and approved in writing by the local planning authority. Thereafter, the development shall be implemented in accordance with the approved details and timescale.
Reason: To ensure that an appropriate sustainable drainage system is provided to serve the development in accordance with policy SWDP29 of the South Worcestershire Development Plan and the relevant aims and objectives of the National Planning Policy Framework. |
| No above ground building operations shall begin until details of the materials to be used in the construction of the external surfaces of the dwellings hereby permitted have been submitted to and approved in writing by the local planning authority. The details to be submitted shall include:-
- type, colour, texture, size, coursing, finish, jointing and pointing of brickwork/stonework;
-
type, colour, texture, size and design of roofing materials;
- external window and door details along with architectural details of the proposed external finishes, heads, sills,
Reason - To ensure that the new materials are in keeping with the surroundings and represent quality design in accordance with policy SWDP21 of the South Worcestershire Development Plan |
| Positive and Proactive Statement. No problems have arisen in dealing with this application. The planning application sought an acceptable form of development consistent with the requirements of relevant policies and material considerations. No amendments or alterations were therefore required and no further positive or proactive action was deemed necessary. |