| Condition Details / Information Notes |
| The development hereby permitted must be commenced not later than the expiration of three years from the date of the original permission 21/02562/FUL which was approved on the 1st October 2025.
Reason: To conform with the requirements of Sections 73 and 91 of the Town and Country Planning Act 1990 (as amended). |
| Unless where required or allowed by other conditions attached to this permission/consent, the development hereby approved shall be carried out in accordance with the information (including details on the proposed materials) provided on the application form and the following plans/drawings/documents –
Site Location Plan – OHA15 - PL001 Rev A
Site Layout - OHA15 - PL002 Rev G
Site Layout (Coloured) – OHA15 – PL002 Rev G
Street Scenes – 15OHA15 - PL013 Rev C
Connectivity Plan – OHA15 - PL004 Rev F
Refuse Strategy Plan – OHA15 - PL010 Rev F
Management Company Plan – OHA15 - PL009 Rev F
Enclosures Plan – OHA15 - PL006 Rev J
Parking Plan - OHA15 - PL011 Rev F
Materials Plan OHA15 - PL003 Rev G
Surface Materials Plan – OHA15 - PL008 Rev F
Sections Plan OHA15 - PL014 Rev C
Sections Plan 2 OHA15 – PL016
Storey Heights Plan – OHA15 - PL007 Rev F
Adoptable Drainage – 25089-100 Rev I
Private Drainage & Externals - Sheet 1 25089-101 Rev B
Private Drainage & Externals - Sheet 2 25089-102 Rev A
Highway Adoption Plan – OHA15 - PL012 Rev F
Space Standards Plan OHA15 - PL005 Rev F
Kingfisher Plans & Elevations OHA15 - PL200 Rev B
Kingfisher Plans & Elevations Windows Variant OHA15 - PL200.1 Rev B
Robin Semi Plans & Elevations – Render OHA15 - PL210.1 Rev B
Robin - Mid Plans & Elevations – Render OHA15 - PL211.1 Rev B
Nestling Semi Plans & Elevations OHA15 - PL212 Rev A
Nestling Semi Plans & Elevations Render OHA15 - PL212.1 Rev A
Bullfinch Semi Plans & Elevations OHA15 - PL214 Rev B
Merlin Plans & Elevations OHA15 - PL205 Rev B
Merlin Plans & Elevations Render OHA15 - PL205.1 Rev B
Redwing Semi Plans & Elevations OHA15 - PL208 Rev A
Redwing Mid Plans & Elevations OHA15 - PL209 Rev A
Hawk Plans & Elevations OHA15 - PL206 Rev B
Hawk Plans & Elevations (Render) OHA15 - PL206.1 Rev B
Hawk Plans & Elevations – Windows OHA15 - PL206.2 Rev B
Wren Mid Plans & Elevations OHA15 - PL223
Wren Semi - Plans & Elevations OHA15 - PL222
Martin Plans & Elevations OHA15 - PL227
Martin Plans & Elevations – Render OHA15 - PL227.1 Rev A
The Linnet Render – Elevations OHA15 - PL207.2 Rev B
The Linnet – Plans OHA15 - PL207 Rev B
The Eider - Plans & Elevations OHA15 - PL201 Rev B
Maisonette Plans & Elevations OHA15 - PL213 Rev A
Single Garage OHA15 - PL215 Rev A
Twin Garage OHA15-PL216 Rev A
Plot 19 Section OHA15-PL015 Rev A
Detailed Landscape Proposals Sheet 1 of 3 – c-2352-01 Revision D
Detailed Landscape Proposals Sheet 2 of 3 – c-2352-02 Revision D
Detailed Landscape Proposals Sheet 3 of 3 – c-2352-03 Revision D
Reason: To define the permission in accordance with policies SWDPR01 and SWDPR03 of the South Worcestershire Development Plan Review 2026 and the National Planning Policy Framework. |
| No development shall take place (including any ground works, demolition or clearance) until a construction environmental management plan (CEMP: Biodiversity) has been submitted to and approved in writing by the local planning authority. The CEMP (Biodiversity) shall be based on the recommendations contained within the Ecological Assessment Report by The Environment Partnership (TEP), document ref. 8829.005, dated 22nd October 2021 and shall include the following:
a. Risk assessment of potentially damaging construction activities, based on further survey assessments of ponds within 250m of the site and the development’s impact on connectivity for amphibians;
b. Identification of “biodiversity protection zones”;
c. Practical measures (both physical measures and sensitive working practices) to avoid or reduce impacts during construction (may be provided as a set of method statements, such as ecological precautionary working method statements (PWMS) as per the report by TEP);
d. Tree and hedge protection measures in accordance with BS5837:2012 and based on the Arboricultural Impact Assessment by TEP, document ref. 8829.003, dated 19th October 2021;
e. The location and timing of sensitive works to avoid harm to biodiversity features;
f. The times during construction when specialist ecologists need to be present;
g. Responsible persons and lines of communication;
h. The role and responsibilities on site of an ecological clerk of works (ECoW) or similarly competent person;
i. Use of protective fences, exclusion barriers and warning signs.
The approved CEMP shall be adhered to and implemented throughout the construction period strictly in accordance with the approved details, unless otherwise agreed in writing by the local planning authority.
Reason: To ensure compliance with the Wildlife and Countryside Act 1981 (as amended) and the Conservation of Habitats and Species Regulations 2017, South Worcestershire Development Plan policy 22, and the relevant aims and objectives of the National Planning Policy Framework.
|
| No works or development hereby permitted shall take place until a full drainage strategy and SuDS proposal has been submitted to, and approved in writing by the Local Planning Authority. The scheme shall include the results of an assessment into the potential of disposing of surface water by means of a sustainable drainage system (SuDS) and shall provide an appropriate level of runoff treatment. The approved scheme shall be completed prior to the first use of the development hereby approved.
Reason: To ensure that the proposal would not an adverse impact on the risk of flooding within the site or locality measures in accordance with the provisions of Policies SWDPR38 and SWDPR39 of the South Worcestershire Development Plan Review and the relevant aims and objectives of the National Planning Policy Framework.
|
| No works in connection with site drainage shall commence until infiltration tests have been carried out in accordance with BRE Digest 365, or such other guidance as may be agreed in writing by the Local Planning Authority. The results of the tests shall be submitted to and agreed in writing by the Local Planning Authority and the agreed recommendations shall be implemented in full prior to the first use of the development hereby approved.
Reason: To ensure that the proposal would not an adverse impact on the risk of flooding within the site or locality measures in accordance with the provisions of Policies SWDPR38 and SWDPR39 of the South Worcestershire Development Plan Review and the relevant aims and objectives of the National Planning Policy Framework.
|
| No works in connection with site drainage shall commence until a SuDS management plan which will include details on future management responsibilities, along with maintenance schedules for all SuDS features and associated pipework has been submitted to and approved in writing by the Local Planning Authority. This plan shall detail the strategy that will be followed to facilitate the optimal functionality and performance of the SuDS scheme throughout its lifetime. The approved SuDS management plan shall be implemented in full accordance with the agreed terms and conditions and shall be managed and maintained in accordance with the approved maintenance plan and thereafter.
Reason: To ensure that the proposal would not an adverse impact on the risk of flooding within the site or locality measures in accordance with the provisions of Policies SWDPR38 and SWDPR39 of the South Worcestershire Development Plan Review and the relevant aims and objectives of the National Planning Policy Framework.
|
| No works in connection with site drainage shall take place until an exceedance flow routing plan for flows above the 1 in 100+40% event has been submitted to and approved in writing by the Local Planning Authority. The proposed scheme shall identify exceedance flow routes through the development based on proposed topography with flows being directed to highways and areas of POS. Flow routes through gardens and other areas in private ownership will not be permitted. The approved details shall be implemented in full prior to the first occupation of the development.
Reason: To ensure that the proposal would not an adverse impact on the risk of flooding within the site or locality measures in accordance with the provisions of Policies SWDPR38 and SWDPR39 of the South Worcestershire Development Plan Review and the relevant aims and objectives of the National Planning Policy Framework.
|
| No development shall take place until the proposed route and point of discharge for the restricted surface water discharge from the site has been submitted to, and approved in writing by the Local Planning Authority. The approved scheme shall be completed before the development is occupied.
Reason: To ensure that the proposal would not an adverse impact on the risk of flooding within the site or locality measures in accordance with the provisions of Policies SWDPR38 and SWDPR39 of the South Worcestershire Development Plan Review and the relevant aims and objectives of the National Planning Policy Framework. |
| Notwithstanding the submitted Drainage Strategy, no development shall commence until detailed design drawings for surface water drainage have been submitted to, and approved in writing by the Local Planning Authority. Thereafter the development shall be carried out in accordance with the approved details.
Reason: To ensure that the proposal would not an adverse impact on the risk of flooding within the site or locality measures in accordance with the provisions of Policies SWDPR38 and SWDPR39 of the South Worcestershire Development Plan Review and the relevant aims and objectives of the National Planning Policy Framework. |
| Notwithstanding the information contained within the supporting water management statement, no development shall commence until detailed water efficiency measures have been submitted to, and approved in writing by the Local Planning Authority. Thereafter the development shall be carried out in accordance with the approved details
Reason: To ensure that the proposal would not an adverse impact on the risk of flooding within the site or locality measures and to ensure the proposal incorporates satisfactory water efficiency measures, in accordance with the provisions of Policies SWDPR01 and SWDPR40 of the South Worcestershire Development Plan Review and the relevant aims and objectives of the National Planning Policy Framework.
|
| The development hereby permitted shall be carried out in accordance with the programme of archaeological work approved under discharge of condition application W/26/00351/CCO on 27 February 2026, comprising:
- Methods Statement for an archaeological evaluation, Status V1, by Worcestershire Archaeology;
- Archaeological Written Scheme of Investigation dated November 2021, by Orion Heritage;
- Archaeological evaluation dated September 2022, by Worcestershire Archaeology For Orion Heritage Ltd.
The development shall not be occupied until the site investigation and post investigation assessment has been completed in accordance with the programme set out in the approved Written Scheme of Investigation and the provision made for analysis, publication and dissemination of results and archive deposition has been secured.
Reason: In accordance with Policies SWDPR09 and SWDPR33 of the South Worcestershire Development Plan Review and Policies HE4, HE5 and HE10 of the National Planning Policy Framework. |
| Before development commences, a lighting design strategy shall be submitted to and approved in writing by the Local Planning Authority. The strategy shall have regard to Worcestershire County Councils Street Lighting Design Guide and the recommendations made in paragraph 5.23 of the Ecological Assessment Report by The Environment Partnership (TEP), document ref. 8829.005, dated 22nd October 2021, and shall include the following:
a) Identification of the areas/features on site that are particularly sensitive for bats and that are likely to cause disturbance in or around their breeding sites and resting places, or along important routes used to access key areas of their territory, for example, for foraging; and
b) Show how and where external lighting will be installed (through the provision of appropriate lighting contour plans and technical specifications) so that it can be clearly demonstrated that areas to be lit will not disturb or prevent bats using their territory or having access to their breeding sites and resting places.
All external lighting shall be installed in accordance with the specifications and locations set out in the strategy, and these shall be maintained thereafter in accordance with the strategy. No other external lighting be installed without prior consent from the local planning authority.
Reason: In the interests of highway safety and to ensure compliance with the Wildlife and Countryside Act 1981 (as amended) and the Conservation of Habitats and Species Regulations 2017 and minimise impacts on protected species in accordance with SWDPR28, SWDPR29 and SWDPR35 of the South Worcestershire Development Plan Review and the relevant aims and objectives of the National Planning Policy Framework. |
| Before the first occupation of any dwelling hereby permitted, a schedule of landscape maintenance for the public open space shall be submitted to and approved in writing by the Local Planning Authority. The schedule shall cover a minimum period of 20 years and shall include details of the arrangements for implementation, long-term design objectives, management responsibilities and maintenance schedules for all landscape areas, excluding domestic gardens. The schedule shall also include details for the management and routine maintenance of the existing hedges to Pulley Lane, Newland Road and Woodland Way.
The approved landscape maintenance schedule shall thereafter be fully implemented in accordance with the approved details.
Reason - To ensure the proposed development does not have an adverse effect on the character and appearance of the area in accordance with Policies SWDPR29, SWDPR34 and SWDPR35 of the South Worcestershire Development Plan Review and the relevant aims and objectives of the National Planning Policy Framework. |
| A Ecological Design Strategy (EDS) shall be submitted to and approved in writing by the local planning authority within one month of the commencement of the development hereby approved. The strategy shall be based on the recommendations made in the Ecological Assessment Report by The Environment Partnership (TEP), document ref. 8829.005, dated 22nd October 2021, and shall include the following:
a) Purpose and conservation objectives for the proposed works;
b) Review of site potential and constraints;
c) Detailed designs and working methods to achieve stated objectives (including, where relevant, type and source of materials to be used);
d) Extent and location of proposed works shown on appropriate scale maps and plans;
e) Timetable for implementation;
f) Persons responsible for implementing the works;
g) Initial aftercare;
h) Details for disposal of any wastes arising from works.
The EDS shall be implemented in accordance with the approved details and all features be retained in that manner thereafter.
On completion of the ecological mitigation and enhancement works, a statement of compliance shall be submitted to the local planning authority by the Ecological Clerk of Works confirming that specified and consented measures have been implemented.
Reason: To ensure that the proposed development contributes to the conservation and enhancement of biodiversity within the site and for the wider area in accordance with Policies SWDPR29 and SWDPR30 of the South Worcestershire Development Plan Review, the relevant aims and objectives of the National Planning Policy Framework, and to ensure compliance with the Wildlife and Countryside Act 1981 (as amended) and the Conservation of Habitats and Species Regulations 2017. |
| A landscape and ecological management plan (LEMP) shall be submitted to and be approved in writing by the local planning authority within one month of the commencement of the development hereby approved. The content of the LEMP shall include the following:
a) Description and evaluation of the features to be managed;
b) Ecological trends and constraints on site that might influence management.
c) Aims and objectives of management;
d) Appropriate management options for achieving aims and objectives;
e) Prescriptions for management actions;
f) Preparation of a work schedule, including an annual work plan capable of being rolled forward over a five-year period and longer term thereafter;
g) Details of the body or organisation responsible for implementation of the plan;
h) Ongoing monitoring and remedial measures.
A report describing the results of monitoring shall be submitted to the local planning authority at intervals identified in the LEMP strategy. The plan and monitoring report shall also set out where the results of the monitoring show that conservation aims and objectives of the LEMP are not being met, how contingencies and/or remedial action will be identified, agreed and implemented so that the development still delivers the fully functioning biodiversity objectives of the originally approved scheme.
The approved plan will be implemented in accordance with the approved details.
Reason: To ensure that the proposed development contributes to the conservation and enhancement of biodiversity within the site and for the wider area in accordance with South Worcestershire Development Plan policy SWDP 22, the relevant aims and objectives of the National Planning Policy Framework, and to ensure compliance with the Wildlife and Countryside Act 1981 (as amended) and the Conservation of Habitats and Species Regulations 2017. |
| All planting and seeding/turfing comprised in the submitted landscape scheme, hereby approved, shall be carried out in the first planting season following the first occupation/use of the development OR in accordance with the submitted implementation programme. All planting shall be watered as necessary and competitive weed growth controlled to ensure successful establishment. Any trees or plants that die, or are removed; or become seriously damaged or diseased within a period of five years from the completion of the planting, shall be replaced in the next planting season with others of similar size and species.
Reason: To ensure the proposed development does not have an adverse effect on the character and appearance of the area in accordance with policies SWDPR28 and SWDPR34 of South Worcestershire Development Plan Review, and the relevant aims and objectives of the National Planning Policy Framework.
|
| Prior to the development hereby permitted being brought into use, details of renewable and/or low carbon energy generation measures shall be submitted to and approved in writing by the Local Planning Authority. The measures shall contribute to at least 20% of the predicted energy requirements for each dwelling. The details to be submitted shall include:-
• the overall predicted energy requirements of the approved development;
• the predicted energy generation from the proposed renewable/low carbon energy
• measures; and
• an implementation timetable for the proposed measures.
The development shall be carried out in accordance with the approved details.
Reason: To ensure the development supports the delivery of low carbon/renewable energy and safeguards natural resources in accordance with policy SWDPR37 of the South Worcestershire Development Plan Review, and the relevant aims and objectives of the National Planning Policy Framework. |
| Notwithstanding the information provided within in the Biodiversity Net Gain Design Stage Assessment (8829.007 Version 3.0) and Ecological Assessment Report (8829.005 Version 2.0) produced by The Environment Partnership, no dwelling hereby permitted shall be occupied until a package of biodiversity off-setting scheme that achieves a net gain over the baseline position and timetable for implementation has been submitted to and approved in writing Local Planning Authority. The development shall be carried out in accordance with the approved details.
Reason: To ensure the development contributes to the conservation and enhancement of biodiversity within the site and the wider area in accordance with policy SWDPR29 and SWDPR30 of the South Worcestershire Development Plan Review, the relevant aims and objectives of the National Planning Policy Framework, and to ensure compliance with the Wildlife and Countryside Act 1981 (as amended) and the Conservation of Habitats and Species Regulations 2017.
|
| Prior to the construction of any dwelling(s) hereby permitted, details of all facing materials used in the construction of those dwelling(s) hereby permitted shall be submitted to and approved in writing by the local planning authority. Thereafter the works shall be carried out in accordance with the approved details, unless otherwise agreed in writing by the local planning authority.
Reason: To ensure that the new materials are in keeping with the surroundings and/or represent quality design in accordance with policy SWDPR28 of the South Worcestershire Development Plan Review, and the relevant aims and objectives of the National Planning Policy Framework.
|
| The development to which this permission relates shall be carried out generally in accordance drawings Site Layout - OHA15 - PL002 Rev G and
Site Layout (Coloured) – OHA15 – PL002 Rev G, unless otherwise approved in writing by the Local Planning Authority (in consultation with WCC Highways).
Reason: In the interests of highway safety, adequate vehicle parking provision and to promote sustainable access and to comply with South Worcestershire Development Plan policies SWDPR06 and SWDPR28 of the South Worcestershire Development Plan Review and the relevant aims and objectives of the National Planning Policy Framework.
|
| Before development commences, a detailed scheme for the site access works at Woodland Way, shall be submitted to the Local Planning Authority (and Worcestershire County Council Highways). The development shall not be occupied or brought into use until the submitted scheme, which is broadly in accordance with drawings Site Layout - OHA15 - PL002 Rev G and Site Layout (Coloured) – OHA15 – PL002 Rev G, subject to any necessary changes identified during the detailed design and Road Safety Audit processes, has been agreed in writing by the Local Planning Authority, in consultation with Worcestershire County Council Highways, and has been implemented in full.
Reason: In the interests of achieving safe and suitable highway access for all users and to comply with South Worcestershire Development Plan Review policy SWDPR06, and the relevant aims and objectives of the National Planning Policy Framework.
|
| The development hereby approved shall not be occupied until an emergency vehicle access, broadly in accordance with drawings Site Layout - OHA15 - PL002 Rev G and Site Layout (Coloured) – OHA15 – PL002 Rev G, subject to any necessary changes identified during the detailed design and Road Safety Audit processes, has been agreed in writing by the Local Planning Authority, in consultation with Worcestershire County Council Highways, and has been implemented in full.
Reason: In the interests of achieving safe and suitable highway access for all users and to comply with Policy SWDPR06 of the South Worcestershire Development Plan Review and the relevant aims and objectives of the National Planning Policy Framework.
|
| The Development hereby approved shall not be occupied until the visibility splays shown on drawings Site Layout - OHA15 - PL002 Rev G and Site Layout (Coloured) – OHA15 – PL002 Rev G, have been provided comprising 4.5mx120m to the north-east and south-west of the Woodland Way/Site access junction. The splays shall at all times be maintained free of obstruction exceeding a height of 0.6m above adjacent carriageway.
Reason: In the interests of highway safety and to comply with South Worcestershire Development Plan Review Policy SWDPR06 and the relevant aims and objectives of the National Planning Policy Framework.
|
| The Development hereby permitted shall not be first occupied until details of proposed measures to protect the attenuation pond from pedestrian ingress have been submitted to and approved in writing by the local planning authority. The measures shall be constructed and implemented in full accordance with the approved details.
Reason: In the interest of pedestrian safety and to comply with South Worcestershire Development Plan Review policies SWDPR28 and SWDPR35, and the relevant aims and objectives of the National Planning Policy Framework.
|
| The Development hereby permitted shall not be first occupied until sheltered and secure cycle parking to comply with the Council’s adopted highway design guide has been provided in general accordance the details shown on Site Layout - OHA15 - PL002 Rev G and Site Layout (Coloured) – OHA15 – PL002 Rev G. These facilities shall thereafter be retained for the lifetime of the development.
Reason: To comply with the Council’s parking standards and to comply with South Worcestershire Development Plan Review policies SWDPR06 and SWDPR28 and the relevant aims and objectives of the National Planning Policy Framework.
|
| No dwelling hereby permitted shall be occupied until the car parking spaces allocated to that property have been provided, as shown on Site Layout - OHA15 - PL002 Rev G and Site Layout (Coloured) – OHA15 – PL002 Rev G, in accordance with the standards and dimensions required by Worcestershire County Council’s Streetscape Design Guide. Car parking spaces shall be kept clear of obstruction and retained only for the parking of vehicles in connection with the use of each property as a dwelling house.
Reason: To ensure that satisfactory provision is made for the parking of vehicles and to comply with South Worcestershire Development Plan Review policy SWDPR06, and the relevant aims and objectives of the National Planning Policy Framework.
|
| Before the Electrical Substation is brought into use 1no. vehicle parking space, conforming to dimensions set out with Worcestershire’s Streetscape Design shall be completed in accordance with details and materials to be submitted to and approved by in writing by the Local Planning Authority. Thereafter, the parking space shall be retained and maintained for the duration of use and shall not be used for any other purpose.
Reason: To ensure the provision of adequate on-site facilities and in the interests of highway safety and to comply South Worcestershire Development Plan Review policy SWDPR06, and the relevant aims and objectives of the National Planning Policy Framework.
|
| Before the Foul Pumping Substation is brought into use 1no. vehicle parking space, conforming to dimensions set out with Worcestershire’s Streetscape Design shall be completed in accordance with details and materials to be submitted to and approved by in writing by the Local Planning Authority. Thereafter, the parking space shall be retained and maintained for the duration of use and shall not be used for any other purpose.
Reason: To ensure the provision of adequate on-site facilities and in the interests of highway safety and to comply South Worcestershire Development Plan Review policy SWDPR06, and the relevant aims and objectives of the National Planning Policy Framework.
|
| The Development hereby approved shall not be occupied until a Travel Plan in accordance with the County Council guidelines has been submitted to and approved in writing by the Local Planning Authority (in consultation with Worcestershire County Council Highways) This plan will thereafter be implemented, monitored for a minimum of 5 years and shall be updated in agreement with Worcestershire County Council’s Travel Plan Officer and thereafter implemented as updated.
Reason: To promote sustainable access and to comply with South Worcestershire Development Plan Review Policy SWDPR06 and the relevant aims and objectives of the National Planning Policy Framework.
|
| The Development hereby approved shall not be occupied until a Residential Travel Welcome Pack to be provided to each dwelling at the point of occupation, has been submitted to and approved by the Local Planning Authority (in consultation with Worcestershire County Council Highways.
Reason: To promote sustainable access and to comply with South Worcestershire Development Plan Review Policy SWDPR06 and the relevant aims and objectives of the National Planning Policy Framework.
|
| Notwithstanding information submitted on approved plans, prior to above ground works commencing, details of the levels of the existing site and floor slab levels of each approved dwelling(s), relative to the existing development on the boundary of the site, shall be submitted to and approved in writing by the local planning authority. The development shall be carried out in accordance with the approved details.
Reason: To ensure the proposed development does not have an adverse effect on the character and appearance of the area in accordance with policies SWDPR28, SWDPR34 and SWDPR35 of the South Worcestershire Development Plan Review, and the relevant aims and objectives of the National Planning Policy Framework.
|
| Prior to the first occupation of the development hereby approved, details of superfast broadband facilities or alternative solutions to serve the dwellings hereby approved shall be submitted to and approved in writing by the local planning authority. The submitted details shall include an implementation programme. The facilities shall be provided in accordance with the approved details.
Reason: To ensure the provision of suitable superfast broad for future occupiers in accordance with policy SWDPR36 of the South Worcestershire Development Plan Review and the relevant aims and objectives of the National Planning Policy Framework.
|
| Alteration of highway to provide new or amended vehicle crossover:
This permission does not authorise the Applicant to carry out works within the publicly maintained highway since such works can only be carried out by the County Council’s Approved Contractor, Ringway Infrastructure Service who can be contacted by email: worcestershirevehicle.crossing@ringway.co.uk. The Applicant is solely responsible for all costs associated with construction of the access.
Section 278 Agreement:
The granting of this planning permission does not remove any obligations on the Applicant to undertake a technical design check of the proposed highway works with the Highway Authority, nor does it confirm acceptance of the proposal by the Highway Authority until that design check process has been concluded. Upon the satisfactory completion of the technical check the design would be suitable to allow conditions imposed under this permission to be discharged but works to the public highway cannot take place until a legal agreement under Section 278 of the Highways Act 1980 has been entered into and the Applicant has complied with the requirements of the Traffic Management Act 2004.
The Applicant is urged to engage with the Highway Authority as early as possible to ensure that the approval process is started in a timely manner to achieve delivery of the highway works in accordance with the above-mentioned conditions.
The Applicant should be aware of the term "highway works" being inclusive of, but not limited to, the proposed junction arrangement, street lighting, structures and any necessary traffic regulation orders.
Section 38 Agreement Details:
If it is the Applicant's intention to request the County Council, as Highway Authority, to adopt the proposed roadworks as maintainable at the public expense, then details of the layout and alignment, widths and levels of the proposed roadworks, which shall comply with any plans approved under this planning consent unless otherwise agreed in writing, together with all necessary drainage arrangements and run off calculations shall be submitted to the County Council's Network Control Manager, Worcestershire County Council, County Hall, Spetchley Road, Worcester, WR5 2NP. No works on the site of the development shall be commenced until these details have been approved by the County Council as Highway Authority and an Agreement under Section 38 of the Highways Act, 1980, entered into.
Drainage Details for Section 38:
It is not known if the proposed roadworks can be satisfactorily drained to an adequate outfall. Unless adequate storm water disposal arrangements can be provided, the County Council, as Highway Authority, will be unable to adopt the proposed roadworks as public highways.
The Applicant is, therefore, advised to submit the engineering details referred to in this conditional approval to the County Council's County Network Control Manager, Worcestershire County Council, County Hall, Spetchley Road, Worcester, WR5 2NP at an early date to enable surface water disposal arrangements to be assessed.
No Drainage to Discharge to Highway:
Drainage arrangements shall be provided to ensure that surface water from the driveway and/or vehicular turning area does not discharge onto the public highway. No drainage or effluent from the proposed development shall be allowed to discharge into any highway drain or over any part of the public highway.
Protection of Visibility Splays:
The Applicant's attention is drawn to the need to ensure that the provision of the visibility splay(s) required by this consent is safeguarded in any sale of the application site or part(s) thereof.
Extraordinary Maintenance:
The attention of the Applicant is drawn to Section 59 of the Highways Act 1980 which allows the Highway Authority to recover additional costs of road maintenance due to damage by extraordinary traffic.
Before any work is commenced upon the development hereby approved representatives of Worcestershire County Council, as the Highway Authority and the Applicant, shall carry out a joint road survey/inspection on the roads leading to this site. Any highlighted defects shall be rectified to the specification and satisfaction of the Highway Authority before work is commenced on the development hereby approved. A further joint survey/inspection shall be undertaken following completion of development hereby approved and any necessary remedial works shall be completed to the specification and satisfaction of the Highway Authority within 1 month or other agreed timescale.
Works Adjoining Highway:
Any work involving the removal or disturbance of ground or structures supporting or abutting the publicly maintained highway should be carried out in accordance with details to be submitted to and approved in writing by the Highway Authority.
Temporary Direction Signs to Housing Developments:
This consent does not authorise the erection of temporary direction signs on the public highway. Should the Applicant wish to direct traffic to the development site they should seek the consent of the Highway Authority. All temporary directional sign proposals should be submitted to the Network Control Manager, Worcestershire County Council, County Hall, Spetchley Road, Worcester, WR5 2NP. No signs should be erected without the consent of the Highway Authority.
|
| It is expected that contractors are registered with the Considerate Constructors scheme and comply with the code of conduct in full, but particular reference is made to "respecting the community" this says:
Constructors should give utmost consideration to their impact on neighbours and the public
• Informing, respecting and showing courtesy to those affected by the work;
• Minimising the impact of deliveries, parking and work on the public highway;
• Contributing to and supporting the local community and economy; and
• Working to create a positive and enduring impression and promoting the Code.
The CEMP should clearly identify how the principal contractor will engage with the local community; this should be tailored to local circumstances. Contractors should also confirm how they will manage any local concerns and complaints and provide an agreed Service Level Agreement for responding to said issues.
Contractors should ensure that courtesy boards are provided, and information shared with the local community relating to the timing of operations and contact details for a site coordinator in the event of any difficulties.
This does not offer any relief to obligations under existing Legislation.
Travel Plan Requirements
Worcestershire County Council has published guidance on how it expects travel plans to be prepared, this guidance is freely available from the County Councils Travel Plans Officer. As part of this process the Applicant must register for Modeshift STARS Business and ensure that their targets have been uploaded so that progress on the implementation of the Travel Plan can be monitored. Worcestershire County Council can assist Applicants with this process should they need.
Modeshift STARS Business is a nationally accredited scheme which assists in the effective delivery of travel plans, Applicant can register at www.modeshiftstars.org
This does not offer any relief to obligations under existing Legislation.
|
| The applicant is advised to ensure, in respect of the public right of way within the site:
No disturbance of, or change to, the surface of the path or part thereof should be carried
out without our written consent.
No diminution in the width of the right of way available for use by the public.
Buildings materials must not be stored on the right of way.
Vehicle movements and parking to be arranged so as not to unreasonably interfere with the
public’s use of the right of way.
No additional barriers are placed across the right of way. No stile, gate, fence or other
structure should be created on, or across, a public right of way without written consent of
the Highway Authority.
The safety of the public using the right of way is to be ensured at all times.
The developer should also be aware of the Department of Environment Circular 1/09 (part 7) which
explains that the effect of development on a public right of way is a material consideration in the
determination of applications for planning permission and that the grant of planning consent does
not entitle developers to obstruct a public right of way.
If the development cannot be carried out without temporarily closing the public right of way for the
safety of the public during works, application should be made at least 8 weeks in advance to the
Public Rights of Way Mapping Team of Worcestershire County Council.
The Definitive Map is a minimum record of public rights of way and does not preclude the possibility
that unrecorded public rights may exist, nor that higher rights may exist than those shown.
|
| It is highly recommended that the developer provides an area of equipped play space within the site. Separate planning consent would likely be required. |