| Condition Details / Information Notes |
| The development hereby permitted shall be begun before the expiration of three years from the date of this permission.
Reason: To conform with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
| Unless where required or allowed by other conditions attached to this permission/consent, the development hereby approved shall be carried out in accordance with the information (including details on the proposed materials) provided on the application form and the following plans/drawings/documents:
Existing Block Plan
Proposed Block Plan
Location Plan
2025 14 01
2025 14 02
2025 14 03
2025 14 04
2025 14 05
2025 14 06
2025 14 07
2025 14 08
2025 14 09 Rev A
2025 14 10 Rev A
2025 14 11 Rev A
2025 14 12 Rev A
2025 14 13
2025 14 14
2025 14 15
2025 14 15 Rev A
2025 14 16 Rev A
Reason: To define the permission in accordance with Policy SWDP1 and SWDP2 of the South Worcestershire Development Plan and the National Planning Policy Framework. |
| Prior to the first use/occupation of the development hereby permitted, the details set out in the submitted Water Management Statement shall be fully implemented and remain thereafter.
Reason: To ensure that an appropriate sustainable drainage system is provided to serve the development in accordance with policy SWDP29 of the South Worcestershire Development Plan 2016. |
| Prior to its/their installation details of the materials to be used in the construction of the external surfaces of the extension hereby permitted have been submitted to and approved in writing by the local planning authority. The details to be submitted shall include:
- type, colour, texture, size, coursing, finish, jointing and pointing of brickwork;
- type, colour, texture, size and design of roofing materials;
- details of approved windows and rooflights, including drawings showing design, materials and profile;
- details of external doors including information on finish;
The development shall be carried out using the materials as approved.
Reason: To protect, conserve and enhance the significance of heritage assets and to ensure that the new materials are in keeping with the surroundings and/or represent quality design in accordance with policies SWDP 6, SWDP21 and SWDP24 of the South Worcestershire Development Plan. |
| Prior to the first use / occupation of the development hereby approved, a bat box shall be installed within the land ownership of the site (e.g. Ibstock enclosed bat box, Habibat bat box, Schwegler Wall-mounted Bat Shelter 2FE, Schwegler 2F Bat Box). The box should be installed at least 4m above ground-level, facing south (or southwest/southeast), and not placed above windows.
Reason: To ensure the development contributes to the conservation and enhancement of biodiversity within the site and the wider area in accordance with policy SWDP22 of the South Worcestershire Development Plan.
|
| Buildings, and particularly roofs and the spaces underneath them, are frequently used as roosting sites by bats. Bats and their 'roost' sites are protected under the Wildlife and Countryside Act 1981 (as amended) and the Conservation of Habitats & Species Regulations 2017 (as amended), the latter of which deems them a European Protected Species. It is a criminal offence to damage or destroy a roost (even if bats are not occupying the roost at the time), to deliberately kill or injure a bat, disturb a bat in its roost, or intentionally or recklessly obstruct access to a bat roost. Planning consent for a development does not provide a defence against prosecution under these acts.
Any removal of roof and wall coverings including roof tiles, slates, hanging tiles, timber boarding, soffit boxes and facia boards shall be carried out carefully by hand. If bats or any sign of bats such as an accumulation of droppings are encountered at any stage of work, work must cease immediately and advice sought from an appropriately licenced bat ecologist on how to proceed lawfully. All contractors working on site should be made aware of the advice and provided with the contact details of a relevant ecological consultant.
|