Application Number W/25/02481/FUL
Status Application Approved

Sign up to notifications on this planning application Back to search results New search

Planning Online Status


  • Application
    Valid
    11/12/2025
  • Consultation
    End
    05/01/2026
  • Committee
    Meeting
    N/A
  • Decision

    Approval
  • Decision
    Date
    07/01/2026
  • Appeal
    Started
    N/A
  • Appeal
    Decision
    N/A
Summary
Application Number W/25/02481/FUL
Location Address Elision Uk Ltd Millennium Way EVESHAM WR11 1GR
Proposal Proposed extension to existing warehouse
Status Approval
Application Type Full planning permission
Appeal Decision N/A

Important Dates
Application Received Date 14/11/2025
Application Valid Date 11/12/2025
Consultation Start Date 23/12/2025
Site Visited / Site Notice Date
Consultation End 05/01/2026
Advert Expiry
Committee Date (if applicable)
Committee Agenda
Decision Date 07/01/2026

Further Information
Expected Decision Level Delegated
Case Officer Isabelle Badland
Parish Evesham
Ward Evesham South Ward
Applicant Mr S Howard
Agent Mr Stuart Bond, absolute architecture ltd
Agent Address 42 Waterloo Road Bidford on Avon B50 4JP

Condition Details / Information Notes
The development hereby permitted shall be begun before the expiration of three years from the date of this permission. Reason: To conform with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
Unless where required or allowed by other conditions attached to this permission/consent, the development hereby approved shall be carried out in accordance with the information (including details on the proposed materials) provided on the application form and the following plans/drawings/documents – Site layout-existing 890-001 Proposed site plan 890-002 Proposed floor plan 890-003 Proposed elevations 890-004 Block and location plans 890-005 Existing Building 890-006 Reason: To define the permission in accordance with Policy SWDP1 and SWDP2 of the South Worcestershire Development Plan and the National Planning Policy Framework.
The materials to be used in the construction of the external surfaces of the proposed extension hereby permitted shall match those to the existing warehouse approved under W/25/00777/FUL and W/25/02479/CCO. Reason - To ensure that the new materials are in keeping with the surroundings and represent quality design in accordance with policy SWDP21 and SWDP25 of the South Worcestershire Development Plan,2016 and the relevant aims and objectives of the National Planning Policy Framework.
The Development hereby approved shall not be brought into use until the turning area and parking facilities shown on Drawing 890-002 has been provided. These areas shall thereafter be retained and kept available for their respective approved uses at all times. Reason: In the interests of highway safety and to ensure the free flow of traffic using the adjoining highway and in accordance with SWDP4 of the South Worcestershire Development Plan,2016 and the relevant aims and objectives of the National Planning Policy Framework.
Prior to the first use/occupation of the development hereby permitted, the details set out in the submitted Water Management Statement shall be fully implemented and remain thereafter. Reason: To ensure that an appropriate sustainable drainage system is provided to serve the development in accordance with policy SWDP29 of the South Worcestershire Development Plan, 2016 and the relevant aims and objectives of the National Planning Policy Framework.
Before the commencement of development hereby permitted, details of renewable and/or low carbon energy generation measures shall be submitted to and approved in writing by the Local Planning Authority. The measures shall contribute to at least 10% of the predicted energy requirements of the development. The details to be submitted shall include:- - the overall predicted energy requirements of the approved development; - the predicted energy generation from the proposed renewable/low carbon energy measures; and - an implementation timetable for the proposed measures. The development shall be carried out in accordance with the approved details. Reason - To ensure the development supports the delivery of low carbon/renewable energy and safeguards natural resources in accordance with policy SWDP27 of the South Worcestershire Development Plan and the relevant aims and objectives of the National Planning Policy Framework.
The extension hereby approved shall not be sold, let or sublet separately from the existing warehouse. Reason – To ensure that the extension remains functionally and operationally linked to the existing warehouse and to prevent the creation of an independent unit that would result in an unacceptable intensification of use, increased servicing and traffic movement, and harm to the character of the area. The restriction is necessary to ensure compliance with Policies SWDP2, SWDP4, SWDP21 and SWDP25 of the South Worcestershire Development Plan and the relevant aims and objectives of the National Planning Policy Framework.
Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (as amended), the extension hereby approved shall be solely used for purposes falling within class B8 (storage and distribution) and no mezzanine floors shall be added. Reason: To ensure appropriate definition and control of the development hereby permitted for clarity and the avoidance of doubt, to ensure the development provides appropriate employment uses and to ensure highway safety and sufficient parking provision, in accordance with Policies SWDP2, SWDP3, SWDP14 and SWDP21 of the South Worcestershire Development Plan. and the relevant aims and objectives of the National Planning Policy Framework.
Alteration of Highway to Provide New or Amended Vehicle Crossover This permission does not authorise the Applicant to carry out works within the publicly maintained highway since such works can only be carried out by the County Council’s Approved Contractor, Ringway Infrastructure Service who can be contacted by email worcestershirevehicle.crossing@ringway.co.uk. The Applicant is solely responsible for all costs associated with construction of the access.

Copyright Notice

Plans, drawings and material submitted to the council are protected by the copyright acts (section 47, 1988 act). You may only use material which is downloaded and/or printed for consultation purposes, to compare current applications with previous schemes and to check whether developments have been completed in accordance with approved plans. Further copies must not be made without the prior permission of the copyright owner.

Tick here to show you have read and agree with the Copyright Notice.

Document Download Tips

  • In order to view the documents please ensure you have ticked the Copyright Notice box above.
  • In order to view PDF documents, you will need to have the free Adobe Acrobat Reader software installed on your computer. Click here to download.
  • To view individual documents click on the 'Document Type' on the row you require and the document will open as an Adobe Acrobat pdf.
  • To download multiple documents in one go, tick all the boxes relating to the documents you wish to view and click Download selected files button.
  • If you wish to download ALL documents place a tick in the box in the header row and click 'Download Selected Files' button.
  • Note: some devices such as iPads that use iOS browsers do not have the standard capability to download multiple files as a default function. If you are experiencing difficulties you may need to download a free application to enable you to do this - known as a zip file. Go to the AppStore to download a zip file ‘app’.

How to reorder or group rows

Click on a column heading for the ability to sort the ‘group’ listing in ascending or descending order by using the up/down arrows. This is useful to sort by ‘name/organisation’.

Document Type Date Description File Size Drawing/Rev Number
Application Documents
Application Plans
Statutory Consultee Response
Decision

Consultation Responses

Neighbour List


In addition to consultations with the consultee listed, we will publicise the application in accordance with national requirements and our local policy. This publicity usually takes the form of letters to nearby properties, the posting of site notices and/or the placing of a public notice in our local newspapers.


Address Sent Reply Received
1 Millenium Court Enterprise Way Vale Park EVESHAM WR11 1GS 11/12/2025
2 Millenium Court Enterprise Way Vale Park EVESHAM WR11 1GS 11/12/2025
3 Millenium Court Enterprise Way Vale Park EVESHAM WR11 1GS 11/12/2025

Consultee List


Name Organisation Sent Reply Due Reply Received
Cllr Mrs Julie Tucker Evesham South Ward 11/12/2025 01/01/2026
Cllr Peter Knight Evesham South Ward 11/12/2025 01/01/2026
Drainage Engineer Engineers - S.W. Land Drainage Partnership 11/12/2025 01/01/2026
Highways County Highways 11/12/2025 01/01/2026
Town Clerk Evesham Town Council 11/12/2025 01/01/2026
Worcestershire Regulatory Services (Enquiries) Worcestershire Regulatory Services 23/12/2025 13/01/2026 02/01/2026

Constraints List


Constraints List
Paper: Evesham Journal - Thursday
CIL004 - Main Urban Area
Section 106 Agreement
Surface Water: High 1 in 30 extent
Surface Water: Medium 1 in 100 extent
Surface Water: Low 1 in 1000 extent
Wind Turbines
Policy Case ELA - 37-158. Wellpak UK Ltd Millennium Way Evesham, Worcestershire WR11 1GR . Proposed pallet store in connection with existing business.. Complete.
SWDP 2: Development Boundary
SWDP 5: Protect and Enhance
PD Rights Removed may apply: W/98/00376/PP - Plot 13, Vale Park Industrial Estate, Four Pools Lane, Evesham, Worcs
No associated appeals