| Condition Details / Information Notes |
| The development hereby permitted must be commenced not later than the expiration of three years from the date of the original permission W/23/00726/FUL, approved on the 30th November 2023.
Reason: To conform with the requirements of Sections 73 and 91 of the Town and Country Planning Act 1990 (as amended). |
| Unless where required or allowed by other conditions attached to this permission/consent, the development hereby approved shall be carried out in accordance with the information (including details on the proposed materials) provided on the application form and the following plans/drawings/documents –
2452/1 A - 1:1250 Location Plan
Drg no. TURUP02a – Upper House Elevations – Scale 1:100
Drg no. TURUP01a – Upper House Floor Plans – Scale 1:100
Drg no. TURLO01b – Lower House Floor Plans – Scale 1:100
Drg no. TURLO03 – Block Plan – Scale 1:500
Drg no. TURLO02e – Lower House Elevations – Scale 1:100
Reason: To define the permission. |
| No above ground building operations hereby permitted shall commence until details of the materials to be used in the construction of the external surfaces of the dwellings hereby permitted have been submitted to and approved in writing by the local planning authority.
The details to be submitted shall include:-
- the type, colour, texture, size, coursing, finish, jointing and pointing of any brickwork and/or stonework;
- the type, colour, texture, size and design of all roofing materials;
- a precise specification of the proposed external render, including colour, texture and finish;
- details of all external doors and garage doors, including materials, colour and finish;
- details of all windows, including materials, colour, finish and reveal depths;
-
details of all rooflights, including drawings showing their design, materials and profile.
The development shall be carried out using the materials as approved.
Reason - To ensure that the new materials are in keeping with the surroundings and/or represent quality design in accordance with Policies SWDPR05, SWDPR28 and SWDPR34 of the South Worcestershire Development Plan Review. |
| The development hereby permitted shall not be occupied until full details of all surface water drainage systems to serve the development have been submitted to and approved in writing by the Local Planning Authority. The approved drainage works shall be implemented in accordance with the approved details before the first occupation of the development hereby permitted and shall be retained thereafter.
Reason: To ensure development would not result in unacceptable risk of pollution or harm to the environment and to ensure the proposed development does not exacerbate flood risk and deals with surface water run-off from the site in a sustainable manner, in accordance with Policies SWDPR38 and SWDPR39 of the South Worcestershire Development Plan Review. |
| No development shall begin until a Construction Environment Management Plan (CEMP) has been submitted to and approved in writing by the Local Planning Authority. The CEMP shall include the following details:-
a. details to minimise the impact of noise, vibration and dust from construction, demolition and site clearance activities and the traffic associated with this development, including a scheme for vehicle wheel cleaning and other measures to ensure that vehicles leaving the site do not deposit mud or other detritus on the public highway. The CEMP shall broadly accord with BS 5228 - 1&2:2009 +A1:2014 (Code of practice for noise and vibration control on construction and open sites) and the WRS Demolition and Construction Guidance;
b. details of site operative parking areas, material storage areas and the location of site operative facilities (offices, toilets etc);
c. restrictions on burning;
d. details in relation to the prevention of pollution of waterways;
e. construction exclusion zones to prevent soil compaction in areas to be planted and remediation proposals for any soil compaction which does occur;
f. a strategy for the handling and storage of topsoil;
g. a management strategy and proposals for the minimisation of construction waste;
h. details of any temporary construction accesses and their reinstatement;
i. a scheme of temporary signage to direct construction related traffic to enter and exit the site;
The measures set out in the approved Plan shall be carried out and complied with in full during the construction of the development hereby approved. Site operatives' parking, material storage and the positioning of operatives' facilities shall only take place on the site in locations approved in writing by the Local Planning Authority.
The CEMP should generally comply with the requirements of Worcestershire Regulatory Services Code of Best Practice for Demolition and Construction Sites 2nd Edition September 2020 and the Construction Logistics and Community Safety (CLOCS) Standard www.clocs.org.uk/clocsworks
Reason: To protect existing and new occupiers of residential areas from the unreasonable effects of noise, vibration, light and dust nuisance,, in accordance with Policies SWDPR35 and SWDPR42 of the South Worcestershire Development Plan Review. |
| The development hereby permitted shall not be brought into use until areas for the manoeuvring and parking of vehicles have been laid out, consolidated, surfaced and drained in accordance with a scheme to be submitted to and approved in writing by the Local Planning Authority and these areas shall thereafter be retained and kept available for those uses at all times.
Reason - To minimise the likelihood of indiscriminate parking in the interests of highway safety in accordance with
Policies SWDPR05, SWDPR06 and SWDPR28 of the South Worcestershire Development Plan Review and paragraph 116 of the NPPF. |
| Unless otherwise agreed by the Local Planning Authority development, other than that required to be carried out as part of an approved scheme of remediation, must not commence until conditions 1 to 6 have been complied with:
1. A preliminary risk assessment must be carried out. This study shall take the form of a Phase I desk study and site walkover and shall include the identification of previous site uses, potential contaminants that might reasonably be expected given those uses and any other
relevant information. The preliminary risk assessment report shall contain a diagrammatical representation (conceptual model) based on the information above and shall include all potential contaminants, sources and receptors to determine whether a site investigation is required and this should be detailed in a report supplied to the Local Planning Authority. The risk assessment must be approved in writing before any development takes place.
2. Where an unacceptable risk is identified a scheme for detailed site investigation must be submitted to and approved in writing by the Local Planning Authority prior to being undertaken. The scheme must be designed to assess the nature and extent of any
contamination and must be led by the findings of the preliminary risk assessment. The investigation and risk assessment scheme must be compiled by competent persons and must be designed in accordance with the Environment Agency's "Land Contamination: Risk
Management" guidance.
3. Detailed site investigation and risk assessment must be undertaken and a written report of the findings produced. This report must be approved by the Local Planning Authority prior to any development taking place. The investigation and risk assessment must be
undertaken by competent persons and must be conducted in accordance with the Environment Agency's "Land Contamination: Risk Management" guidance.
4. Where identified as necessary a detailed remediation scheme to bring the site to a condition suitable for the intended use by removing unacceptable risks to identified receptors must be prepared and is subject to the approval of the Local Planning Authority in advance of
undertaking. The remediation scheme must ensure that the site will not qualify as Contaminated Land under Part 2A Environmental Protection Act 1990 in relation to the intended use of the land after remediation.
5. The approved remediation scheme must be carried out in accordance with its terms prior to the commencement of development, other than that required to carry out remediation, unless otherwise agreed in writing by the Local Planning Authority.
6. Following the completion of the measures identified in the approved remediation scheme a validation report that demonstrates the effectiveness of the remediation carried out must be produced, and is subject to the approval of the Local Planning Authority prior to the
occupation of any buildings.
7. In the event that contamination is found at any time when carrying out the approved development that was not previously identified it must be reported in writing immediately to the Local Planning Authority. An investigation and risk assessment must be undertaken and where
necessary a remediation scheme must be prepared, these will be subject to the approval of the Local Planning Authority. Following the completion of any measures identified in the approved remediation scheme a validation report must be prepared, which is subject to the approval in writing of the Local Planning Authority prior to the occupation of any buildings.
REASON:To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors in accordance with Policies SWDPR35 and SWDPR42 of the South Worcestershire Development Plan Review. |
| The development hereby permitted shall be carried out in accordance with the recommendations set out in the report carried out by Chelmarsh RG, dated 12 March 2023, and submitted with the original application with reference W/23/00726/FUL.
Reason: To ensure the development contributes to the conservation and enhancement of biodiversity within the site and the wider area, in accordance with Policies SWDPR29 and SWDPR34 of the South Worcestershire Development Plan Review. |
| Work should avoid disturbance to nesting birds. Nesting birds are protected under the 1981 Wildlife and Countryside Act and the Countryside and Rights of Way Act 2000. The main nesting season lasts approximately from March to September, so work should take place outside these dates if at all possible.
However, birds can nest at any time and the site including any buildings should ideally be checked for their presence immediately before work starts. |
| Buildings are frequently used as roosting sites by bats. Bats and their 'roost' sites are protected under the 1981 Wildlife and Countryside Act and the Habitat Regulations 1994, the latter of which deems them a European Protected Species.
It is a criminal offence to recklessly disturb or destroy a bat 'roost'. The applicant is advised to take professional advice on the matter since it is possible that a protected species licence might be necessary to undertake these works.
Further information about species licensing and legislation can be obtained from the Species Licensing Service on 0117 372 8000. If evidence of bats is found during works, work should stop immediately and Natural England must be contacted on 01453 764450 for advice on the best way to proceed. |