Application NumberW/16/03028/OU
StatusApproved

  • Application Details
  • Documents
  • Consultations
  • Map
  • Appeals
  • Application Details
  • Documents
  • Consultations
  • Map
  • Appeals

Planning Online Status

Application
Valid
Consultation
End
Committee
Meeting
Decision Decision
Date
Appeal
Started
Appeal
Decision
06/01/2017 16/02/2017 11/05/2017 Approval 06/12/2018 N/A N/A

Summary
Application NumberW/16/03028/OU
Location AddressLand At Station Road Pershore
ProposalErection of up-to 75 dwellings with vehicular access from Station Road, a sustainable drainage system, Green Infrastructure and associated utilities.
StatusApproval
Application TypeOutline Application
Appeal DecisionN/A

Important Dates
Application Received Date22/12/2016
Application Valid Date06/01/2017
Consultation Start Date19/01/2017
Site Visited / Site Notice Date19/01/2017
Consultation End16/02/2017
Advert Expiry16/02/2017
Committee Date (if applicable)11/05/2017
Committee AgendaPlanning Committee Information
Decision Date06/12/2018

Further Information
Expected Decision LevelCommittee
Case OfficerJonathan Edwards
ParishPershore
WardPershore Ward
Applicant NameWelbeck Strategic Land LLP
Agent NameMr D Barnes
Agent Address140 Brandwood Road Kings Heath Birmingham B14 6BX

Condition Details / Information Notes
Approval of the details of siting, appearance and scale of the building(s) and the landscaping of the site (hereinafter called "the reserved matters") shall be obtained from the Local Planning Authority in writing before any development is commenced. Reason : This permission is in outline only and further details of the reserved matters are required to ensure satisfactory development.
Application for approval of reserved matters shall be made to the Local Planning Authority before the expiration of three years from the date of this permission. The development hereby permitted shall be begun before the expiration of twelve calendar months from the date of approval of the last of the reserved matters to be approved. Reason : In accordance with the requirements of Section 91 (1) of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
Demolition, clearance or construction work and deliveries to and from the site in connection with the development hereby approved shall only take place between the hours of 08.00 and 18.00hrs Monday to Friday and 08.00 and 13.00hrs on a Saturday. There shall be no demolition, clearance or construction work or deliveries to and from the site on Sundays or Bank Holidays. Reason : To preserve the amenities of the locality and avoid significant adverse impacts from noise pollution on human health and well-being in line with policy SWDP31 of the South Worcestershire Development Plan 2016.
No development shall take place until a Construction Method Statement has been submitted to, and approved in writing by, the local planning authority. The approved Statement shall be adhered to throughout the construction period. The Statement shall provide for: i. the parking of vehicles of site operatives and visitors ii. loading and unloading of plant and materials iii. storage of plant and materials used in constructing the development iv. the erection and maintenance of security hoarding including decorative displays and facilities for public viewing, where appropriate v. wheel washing facilities vi. measures to control the emission of dust and dirt during construction vii. a scheme for recycling/disposing of waste resulting from demolition and construction works; viii measures to prevent pollution incidents during the construction of the approved development. Reason : To protect the amenities of adjoining/nearby properties from unacceptable adverse effects in accordance with policies SWDP21 and SWDP31 of the South Worcestershire Development Plan 2016.
Any application seeking approval of landscaping reserved matters shall include: 1. survey information of all existing trees and hedges on the application site, and branches from trees on adjacent land that overhang the site. The survey shall include for each tree/hedge: i) the accurate position, canopy spread and species plotted on a plan. ii) an assessment of its general health and stability. iii) an indication of any proposals for felling or pruning. iv) details of any proposed changes in ground level, or other works to be carried out, within the canopy spread. 2. a landscape scheme which shall include: i) a plan(s) showing the planting layout of proposed tree, hedge, shrub and grass areas. ii) a schedule of proposed planting - indicating species, size at time of planting and numbers/densities of plants. iii) a written specification outlining cultivation and others operations associated with plant and grass establishment. iv) a schedule of maintenance, including watering and the control of competitive weed growth, for a minimum period of five years from first planting. Reason : To preserve and enhance the visual amenities of the area and to ensure the satisfactory development of the site - in accordance with Policies SWDP21 and SWDP25 of the South Worcestershire Development Plan 2016.
All existing trees and hedges on site, or branches from trees on adjacent land that overhang the site, unless indicated to be removed as part of any reserved matters approval, shall be retained and shall not be felled or pruned or otherwise removed within a period of five years from the completion of the development without the previous written consent of the Local Planning Authority. Temporary fencing for the protection of all retained trees/hedges on site during development shall be erected, to a minimum height of 1.2 metres, below the outermost limit of the branch spread, or at a distance equal to half the height of the tree, whichever is the further from the tree. Such fencing should be erected in accordance with BS 5837:2005, before any materials or machinery are brought onto site and before any demolition or development, including erection of site huts, is commenced. This protective fencing shall be maintained on site until the completion of development, and nothing should be stored or placed, nor shall any ground levels be altered, within the fenced area without the previous written consent of the Local Planning Authority. There shall be no burning of any material within 10 metres of the extent of the canopy of any retained tree/hedge. If any retained tree/hedge is removed, uprooted or destroyed or dies, replacement planting shall be carried out in the first available planting season of such species, sizes and numbers and in positions on site as may be specified by the Local Planning Authority. Reason : To prevent existing trees/hedges from being damaged during construction work and to preserve the amenities of the locality, in accordance with policies SWDP21 and SWDP25 of the South Worcestershire Development Plan 2016.
Notwithstanding the information submitted with the application and prior to the commencement of development hereby approved the following details shall be submitted to the Local Planning Authority for approval in writing:- - details on how renewable energy measures are to be incorporated into the proposed development. In line with the application submissions, these measures shall provide for at least 10% of the energy requirement of the proposed development; - details of measures to conserve and recycle water to be incorporated into the proposed development; - details of energy efficiency measures to be incorporated into the proposed development; and - details of construction materials to be used in the proposed development with the aim of minimising the use of primary non-sustainable materials. The approved measures shall be implemented and incorporated into the approved development in line with a implementation timetable to be submitted and approved in writing by the local planning authority prior to the commencement of development. Reason : To ensure the prudent use of natural resources and to ensure compliance with policies SWDP27 and SWDP30 of the South Worcestershire Development Plan 2016.
None of the dwellinghouses hereby approved shall exceed two and a half storeys in height (in regard of this condition the term two and half storeys means where any third floor habitable accommodation is provided within the roof space of a pitched roof building). Reason : To protect the visual amenities/character of the area in line with policy SWDP25 of the South Worcestershire Development Plan 2016.
In relation to the requirements of conditions 1 and 2, details of the facilities for the storage of refuse for all proposed buildings within the development shall be submitted as part of any reserved matters application(s). No individual dwelling shall be occupied until approved refuse storage facilities to serve that dwelling have been constructed in accordance with approved details. Reason : To ensure the proposed dwellings have adequate refuse storage facilities and represent high quality design in accordance with policy SWDP21 of the South Worcestershire Development Plan 2016.
Prior to the commencement of development, details of scheme for the provision and implementation of a surface water regulation system that includes the use of Sustainable Drainage Systems shall be submitted to the Local Planning authority for approval in writing. As well as the details of the physical drainage system, the details to be submitted shall include: - information about the design storm period and intensity, the method employed to delay and control the surface water discharged from the site and the measures taken to prevent pollution of the receiving groundwater and/or surface waters ; - details of any maintenance/clearance works to be carried to existing drainage ditches, ponds or culverts; and - details of how the drainage system and any associated drainage ditches, ponds, swales or culverts are to be maintained in the future and for the lifetime of the development, including any arrangements for adoption by any public authority or statutory undertaker and any other arrangements to secure the operation of the scheme throughout its lifetime; - an implementation timetable The maintenance/clearance works and a surface water drainage system shall be implemented in accordance with approved details and timetable. Reason : To ensure the provision of an adequate and sustainable drainage system in accordance with policy SWDP 29 of the South Worcestershire Development Plan 2016.
The development hereby permitted shall include at least 1.6 hectares of green infrastructure space. The information submitted with any reserved matters application shall include details of any landscaping features (including ponds etc) and to be included within the public open/amenity space area(s). Prior to the commencement of the construction of any dwelling house hereby permitted, details of when the green infrastructure space is to be provided and how it is to be maintained shall be submitted to and approved in writing by the Local Planning Authority. The green infrastructure space shall be provided and laid out in accordance with the approved details and maintained in accordance with the approved maintenance details. Reason : To ensure the provision and maintenance of an adequate green infrastructure/public pen space to serve the proposed development and to help ensure the development enhances/protects the biodiversity value of the site in accordance with policies SWDP5 and SWDP39 of the South Worcestershire Development Plan 2017.
In relation to the requirements of conditions 1 and 2, details of the floor levels of all proposed buildings shall be submitted as part of any reserved matters application(s). Any buildings approved shall be constructed at approved floor levels. Reason : In the interests of visual amenity and to ensure compliance with policies SWDP21 and SWDP25 of the South Worcestershire Development Plan 2016.
1) No development shall take place until a programme of archaeological work, including a Written Scheme of Investigation, has been submitted to and approved by the local planning authority in writing. The scheme shall include an assessment of significance and research questions; and: a. The programme and methodology of site investigation and recording. b. The programme for post investigation assessment. c. Provision to be made for analysis of the site investigation and recording. d. Provision to be made for publication and dissemination of the analysis and records of the site investigation e. Provision to be made for archive deposition of the analysis and records of the site investigation f. Nomination of a competent person or persons/organisation to undertake the works set out within the Written Scheme of Investigation. 2) No demolition/development shall take place other than in accordance with the Written Scheme of Investigation approved under condition (1). 3) The development shall not be occupied until the site investigation and post investigation assessment has been completed in accordance with the programme set out in the Written Scheme of Investigation approved under condition (1) and the provision made for analysis, publication and dissemination of results and archive deposition has been secured. Reason : To ensure no harm is caused to the archaeological interest and significance of the site in line with policies SWDP6 and SWDP24 of the South Worcestershire Development Plan 2016.
Prior to the commencement of development, a comprehensive green infrastructure and biodiversity management plan and ecological mitigation/enhancement plan shall be submitted to the local planning authority for approval in writing. The management/mitigation/enhancement plan shall include details of measures to enhance and protect the biodiversity and ecological value of the site, as well as an implementation timetable. The details shall include:- - measures to prevent harm or risk of harm to badgers during construction of the development; - design and position of bat boxes, artificial roosts and bat tubes to be incorporated in the scheme; - timing of vegetation removal to ensure breeding birds are not disturbed; - design details of balancing ponds to encourage wildlife; - information on further wildlife surveys to be carried out prior to or during construction. Measures included in the approved management plan shall be implemented in accordance with the approved timetable. Reason : To ensure the proposed development enhances the bio-diversity value of the site in line with the requirements of policy SWDP22 of the South Worcestershire Development Plan 2016.
No development shall take place until a site investigation of the nature and extent of contamination has been carried out in accordance with a methodology which has previously been submitted to and approved in writing by the local planning authority. The results of the site investigation shall be submitted to, and approved by, the local planning authority before any development begins. If any contamination is found during the site investigation, a report specifying the measures to be taken to remediate the site to render it suitable for the development hereby permitted shall be submitted to and approved in writing by the local planning authority. The site shall be remediated in accordance with the approved measures before development begins. If, during the course of development, any contamination is found which has not been identified in the site investigation, additional measures for the remediation of this source of contamination shall be submitted to and approved in writing by the local planning authority. The remediation of the site shall incorporate the approved additional measures. Reason : To prevent pollution of the environment in line with policy SWDP31 of the South Worcestershire Development Plan 2016.
None of the individual dwelling houses hereby approved shall be first occupied until parking facilities and associated turning areas have been provided to serve the dwelling. Details of how parking and turning areas are to be constructed, surfaced and drained in accordance shall be submitted to and approved in writing prior to the occupation of any individual unit. The approved parking and turning areas shall thereafter be retained and kept available for those uses at all times. Reason : In the interests of highway safety and to ensure the free flow of traffic using the adjoining highway in line with policy SWDP4 and SWDP21 of the South Worcestershire Development Plan 2016.
No construction work on the development hereby permitted shall commence until the signalised junction on Station Road (as referred to in para. 5.3 of the TJA Transport Statement dated December 2016 and diagrammatically shown on drawing numbered 1006 21302 rev 02) has been fully provided/constructed and is fully operational. Reason : To ensure the safe and free flow of traffic on the highway in line with policy SWDP4 of the South Worcestershire Development Plan 2016.
None of the dwellings hereby approved shall be occupied until the engineering details and specification of the proposed roads and highway drains have been submitted to and approved in writing by the Local Planning Authority. None of the dwellings hereby approved shall be occupied until roads constructed in accordance with the approved details and providing access to the nearest public road to the building have been constructed to at least binder course level. Reason : To ensure an adequate and acceptable means of access is available before the dwelling or building is occupied in accordance with policies SWDP4 and SWDP21 of the South Worcestershire Development Plan 2016.
None of the dwellings hereby approved shall be occupied until a travel plan that promotes sustainable forms of access to and from the site has been submitted to and have approved in writing by the Local Planning Authority. The travel plan shall include an implementation timetable and the plan thereafter shall be implemented in accordance with the approved details. Reason : To reduce vehicle movements and promote sustainable access in accordance with policy SWDP4 of the South Worcestershire Development Plan 2016.
Reserved matters details as required under the provisions of condition 1 and 2 shall allow for the provision of the "Potential Link to Future Phase development to the east" as shown on the fpcr Illustrative Masterplan numbered 4575-2-PL-03 rev F. Construction work on the development hereby permitted shall not be commenced until information on when a road linking the approved development to the housing development site to the east has been submitted to and approved in writing by the local planning authority. The road to the eastern boundary shall be provided in accordance with the approved details. Reason : To ensure the proposed development is designed and delivered in a way that does not prevent or prejudice the delivery of housing on land adjoining the application site and to encourage linkages through the comprehensive housing development approved on land to the west of Station Road - in line with Policy SWDP4 and SWDP21 of the South Worcestershire Development Plan 2016.
None of the dwellings or buildings hereby approved shall be located in areas identified as being at high risk of flooding in the Strategic Flood Risk Assessment affecting the site or the latest flood risk maps (both fluvial or surface water maps) produced by the Environment Agency. Reason : To ensure the proposed development is not at unacceptable risk of flooding or exacerbates flood risk elsewhere in line with policy SWDP28 of the South Worcestershire Development Plan 2016.
Positive and Proactive Statement In dealing with this application, the Council has worked with the applicant in the following ways:- - seeking further information following receipt of the application; - considering the imposition of conditions and or the completion of a s.106 legal agreement In such ways the Council has demonstrated a positive and proactive manner in seeking solutions to problems arising in relation to the planning application.
The attention of the applicant is drawn to the need to keep the highway free from any mud or other material emanating from the application site or any works pertaining thereto.
This permission does not authorise the laying of private apparatus within the confines of the public highway The applicant should apply to the Worcestershire County Council's Community and Response Unit, County Hall, Spetchley Road, Worcester WR5 2NP (telephone 0845 607 2005), for consent under the New Roads and Streetworks Act 1991 to install private apparatus within the confines of the public highway. Precise details of all works within the public highway must be agreed on site with the Highway Authority.
This permission does not authorise the applicant to carry out works within the publicly maintained highway since such works can only be carried out by the County Council's Approved Contractor following the issue of a license under Section 184 and 278 of the Highways Act, 1980. The applicant should contact Worcestershire County Council's Highways Community and Response Unit, County Hall, Spetchley Road, Worcester WR5 2NP (telephone 0845 607 2005), regarding the issue of the necessary license authorising the access works to be carried out by the County Council's Approved Contractor at the applicant's expense. The applicant should give the County Council sufficient notice to enable, as far as possible, the licence procedure to be carried out so that there is no disruption to the applicant's programme of works.
No work on the site should commence until engineering details of the improvements to the public highway have been approved by the Highway Authority and an agreement under Section 278 of the Highways Act 1980 entered into.
If it is the Developer's intention to request the County Council, as a Highway Authority, to adopt the proposed road works as maintainable at the public expense, then details of the layout and alignment, widths and levels of the proposed road works, which shall comply with the County Council's requirements, together with all necessary drainage arrangements and run off calculations shall be submitted to Worcestershire County Council's Network Control Manager, Environmental Services Directorate, County Hall, Spetchley Road, Worcester WR5 2NP (telephone 01905 763763). No works on the site of the development shall be commenced until these details have been approved and an Agreement under Section 38 of the Highways Act, 1980, entered into.
It is not known if the proposed road works can be satisfactorily drained to an adequate outfall. Unless adequate storm water disposal arrangements can be provided, the County Council, as Highway Authority, will be unable to adopt the proposed road works as public highways. The applicant is, therefore, advised to submit the engineering details referred to in this conditional approval to the Worcestershire County Council's Network Control Manager, Environmental Services Directorate, County Hall, Spetchley Road, Worcester WR5 2NP (telephone 01905 763763), at an early date to enable surface water disposal arrangements to be assessed.
Prior to the first occupation of any of the dwellings hereby approved, details of superfast broadband facilities or alternative solutions to serve the dwellings hereby approved shall be submitted to and approved in writing by the local planning authority. The submitted details shall include an implementation programme. The facilities shall be provided in accordance with the approved details. Reason: To ensure the proposal incorporates satisfactory telecommunication facilities in line with policy SWDP26 of the South Worcestershire Development Plan 2016.

Copyright Notice

Plans, drawings and material submitted to the council are protected by the copyright acts (section 47, 1988 act). You may only use material which is downloaded and/or printed for consultation purposes, to compare current applications with previous schemes and to check whether developments have been completed in accordance with approved plans. Further copies must not be made without the prior permission of the copyright owner.

Tick here to show you have read and agree with the Copyright Notice.


Document Download Tips

  • In order to view PDF documents, you will need to have the free Adobe Acrobat Reader software installed on your computer. Click here to download.
  • To view individual documents click on the 'Document Type' on the row you require and the document will open as an Adobe Acrobat pdf.
  • To download multiple documents in one go, tick all the boxes relating to the documents you wish to view and click Download selected files button.
  • If you wish to download ALL documents place a tick in the box in the header row and click Download selected files button.
  • Note: some devices such as iPads that use iOS browsers do not have the capability to download multiple files as a default function. If you are experiencing difficulties you will need to download a free application to be able to do this, known as a zip file. Go to the AppStore to download a zip file app. Single file downloads are not affected.

How to reorder or group rows

  • Click on a column heading for the ability to sort the ‘group’ listing in ascending or descending order by using the up/down arrows. This is useful to sort by ‘name/organisation’.
 Document TypeDate PublishedDescriptionFile SizeDrawing/Rev Number

Group: Application Documents

  01. Application Form 17/01/2017Application Form No Personal Data (unknown size) -
  01. Application Form 19/01/2017Site Notice (unknown size) -
  01. Application Form 25/01/2017Press Advert (unknown size) -
  01. Application Form 09/05/2018Revised application form (unknown size) -
  02. Supporting Information 17/01/2017Affordable Housing Statement (unknown size) -
  02. Supporting Information 17/01/2017Design & Access Statement (unknown size) -
  02. Supporting Information 17/01/2017Community Consultation Statement (unknown size) -
  02. Supporting Information 17/01/2017Drainage Statement (unknown size) -
  02. Supporting Information 17/01/2017Framework Travel Plan (unknown size) -
  02. Supporting Information 17/01/2017Heritage Statement (unknown size) -
  02. Supporting Information 17/01/2017Flood Risk Assessment (unknown size) -
  02. Supporting Information 17/01/2017Landscape & Visual Impact Assessment (unknown size) -
  02. Supporting Information 17/01/2017Planning Obligation Statement (unknown size) -
  02. Supporting Information 17/01/2017Planning Statement (unknown size) -
  02. Supporting Information 17/01/2017Transport Statement (unknown size) -
  02. Supporting Information 17/01/2017Tree Survey & Arboricultural Statement (unknown size) -
  02. Supporting Information 17/01/2017Energy Statement (unknown size) -
  02. Supporting Information 17/01/2017Ecological Appraisal (unknown size) -
  02. Supporting Information 17/01/2017Covering Letter.pdf (unknown size) -
  02. Supporting Information 08/02/2017Email from agent (unknown size) -
  02. Supporting Information 08/02/2017Email from agent (unknown size) -
  02. Supporting Information 02/03/2017Technical Note in response to WCC Highway comments (unknown size) -
  02. Supporting Information 02/03/2017Email from applicants highway representatives (unknown size) -
  07. Revised Documents 16/03/2017Email from agent re public open space (unknown size) -
  07. Revised Documents 21/04/2017Email from agent (unknown size) -

Group: Plans

  04. Site/Location Plan 22/12/2016Drawing No 1006-21302 Rev 2 Site Access (unknown size)
  04. Site/Location Plan 26/01/20174575-2-PL-01 C APPLICATION RED LINE AND BLUE LINE (unknown size) - C
  04. Site/Location Plan 26/01/20174575-2-PL-02 REV C Parameters Plan (unknown size) - C
  06. Proposed Plans 22/12/2016Drawing No 2946 Topographical (unknown size)
  06. Proposed Plans 20/04/20174575-2-PL-03F Illustrative MasterPlan (unknown size) 4575-2-03 - F

Group: Representations

  08. Response - Neighbour 21/01/2017B. Petros (unknown size) -
  09. Response - Consultee 25/01/2017Enivronment Agency (unknown size) -
  09. Response - Consultee 30/01/2017Severn Trent (unknown size) -
  09. Response - Consultee 30/01/2017Engineers comments (unknown size) -
  09. Response - Consultee 30/01/2017Worcester Regs (unknown size) -
  09. Response - Consultee 03/02/2017Housing Response (unknown size) -
  09. Response - Consultee 07/02/2017Landscape officer comments (unknown size) -
  09. Response - Consultee 13/02/2017Mike Stephenson Crime Risk Manager (unknown size) -
  09. Response - Consultee 13/02/2017WCC Historic Environment Advisor (unknown size) -
  09. Response - Consultee 13/02/2017Education Contribution Assessment (unknown size) -
  09. Response - Consultee 15/02/2017Historic Environment Advisor (unknown size) -
  09. Response - Consultee 27/02/2017Worcestershire County Council Highways (unknown size) -
  09. Response - Consultee 15/03/2017Policy Comment (unknown size) -
  09. Response - Consultee 15/03/2017Education Planning Obligation Assessment W16-03028.pdf (unknown size) -
  09. Response - Consultee 15/03/2017Email from Worcs CC Education (unknown size) -
  09. Response - Consultee 24/04/2017Email from County Council Highways (unknown size) -
  09. Response - Consultee 11/05/2017Email from Highways Officer (unknown size) -
  09. Response - Consultee 11/05/2017Highways Officer Contributions - Justification SWDPIDP V1.4.docx (unknown size) -
  09. Response - Consultee 11/05/2017Highways Officer Contributions - SWDPIDP Calculator.xlsx (unknown size) -
  09. Response - Consultee 18/05/2017Email from Planning Policy (unknown size) -

Group: Committee Documents

  10. Committee Documents 02/05/2017Individual Committee Report (unknown size) -
  10. Committee Documents 10/05/2017Individual Committee updates (unknown size) -

Group: Decision

  11. Decision Information 10/12/2018S.106~no signatures~Mount Pleasant Park Phase 2 (unknown size) -
  12. Decision Notice 06/12/2018Decision Notice (unknown size) -

Group: Discharge of Condition

  15. DoC Supporting Documents 06/11/2019P5672 Station Rd eval WSI rev1.pdf (unknown size) -

Group: System Generated Letter

  19. System Generated Letter 20/01/2017Screening Opinion (unknown size) -
  19. System Generated Letter 11/12/2017Extension of Time (unknown size) -

Consultation Responses

Neighbour List
In addition to consultations with the consultee listed, we will publicise the application in accordance with national requirements and our local policy. This publicity usually takes the form of letters to nearby properties, the posting of site notices and/or the placing of a public notice in our local newspapers.


NameAddressSentReply Received
Occupier1 Pardoe Drive Pershore WR10 1RJ17/01/2017 
Occupier1 Westcott Way Pershore WR10 1RH17/01/2017 
Occupier10 Westcott Way Pershore WR10 1RH17/01/2017 
Occupier11 Westcott Way Pershore WR10 1RH17/01/2017 
Occupier12 Westcott Way Pershore WR10 1RH17/01/2017 
Occupier14 Westcott Way Pershore WR10 1RH17/01/2017 
Occupier15 Westcott Way Pershore WR10 1RH17/01/2017 
Occupier16 Westcott Way Pershore WR10 1RH17/01/2017 
Occupier17 Westcott Way Pershore WR10 1RH17/01/2017 
B. Petros18 Westcott Way, PERSHORE, WR10 1RH17/01/201721/01/2017
Occupier19 Westcott Way Pershore WR10 1RH17/01/2017 
Occupier20 Westcott Way Pershore WR10 1RH17/01/2017 
Occupier21 Westcott Way Pershore WR10 1RH17/01/2017 
Occupier22 Westcott Way Pershore WR10 1RH17/01/2017 
Occupier23 Westcott Way Pershore WR10 1RH17/01/2017 
Occupier24 Westcott Way Pershore WR10 1RH17/01/2017 
Occupier25 Westcott Way Pershore WR10 1RH17/01/2017 
Occupier26 Westcott Way Pershore WR10 1RH17/01/2017 
Occupier28 Westcott Way Pershore WR10 1RH17/01/2017 
Occupier3 Pardoe Drive Pershore WR10 1RJ17/01/2017 
Occupier3 Westcott Way Pershore WR10 1RH17/01/2017 
Occupier5 Westcott Way Pershore WR10 1RH17/01/2017 
Occupier7 Westcott Way Pershore WR10 1RH17/01/2017 
Occupier9 Westcott Way Pershore WR10 1RH17/01/2017 
Mr Mike StephensonCrime Risk manager Police Station Castle Street Worcester WR13AD 13/02/2017

Consultee List


NameOrganisationSentReply DueReply Received
Cllr Tony RowleyPershore Ward22/12/2016  
Cllr Mrs Val WoodPershore Ward22/12/2016  
Cllr Charles TuckerPershore Ward22/12/2016  
Mrs A DobbinsPershore Town Council22/12/2016  
HighwaysCounty Highways17/01/201707/02/2017 
Environment Agency West Area Planning17/01/201707/02/2017 
Mr D LordSevern Trent Water Ltd17/01/201707/02/2017 
Emma DabbsWCC Lead Local Flood Authority 17/01/201707/02/2017 
Worcestershire Regulatory Services (Enquiries)Worcestershire Regulatory Services17/01/201707/02/2017 
Ms L StevensClient Services (Parks Officer)17/01/201707/02/2017 
Housing WDC - Bruce Lomax & Hannah HunterHousing17/01/201707/02/2017 
Mrs E MarshallLandscape Officer17/01/201707/02/201707/02/2017
Mrs S HiscockNatural Heritage Officer17/01/201707/02/2017 
Mrs S GriffithsTree Preservation Officer17/01/201707/02/2017 
Drainage EngineerEngineers19/01/201709/02/201730/01/2017
Mrs A DobbinsPershore Town Council02/05/2017  

Constraints List


Constraints List
Section 106 Agreement
Minor Aquifer (Ground Water/Boreholes)
Surface water (High 1 in 30)
Surface water (Medium 1 in 100)
Surface water (Low 1 in 1000)
Minor Aquifer
Paper: Evesham Journal
Section 106 Agreement
Surface Water: High 1 in 30 years
Surface Water: Medium 1 in 100 years
Surface Water: Low 1 in 1000 years
Wind Turbines
SWDP 2: Development Boundary
SWDP 5: Protect and Enhance
SWDP47/1: Housing Allocations
No associated appeals

Document Download Tips

  • In order to view PDF documents, you will need to have the free Adobe Acrobat Reader software installed on your computer. Click here to download.
  • To view individual documents click on the 'Document Type' on the row you require and the document will open as an Adobe Acrobat pdf.
  • To download multiple documents in one go, tick all the boxes relating to the documents you wish to view and click Download selected files button.
  • If you wish to download ALL documents place a tick in the box in the header row and click Download selected files button.
  • Note: some devices use iOS browsers (such as iPads) but do not have the standard capability to download multiple files as a default function If you are experiencing difficulties you may need to download a free application to enable you to do this - known as a zip file. Go to the AppStore to down load a zip file ‘app’.

How to reorder or group rows

  • Click on a column heading for the ability to sort the ‘group’ listing in ascending or descending order by using the up/down arrows. This is useful to sort by ‘name/organisation’.

Copyright Notice

Plans, drawings and material submitted to the council are protected by the copyright acts (section 47, 1988 act). You may only use material which is downloaded and/or printed for consultation purposes, to compare current applications with previous schemes and to check whether developments have been completed in accordance with approved plans. Further copies must not be made without the prior permission of the copyright owner.

Tick here to show you have read and agree with the Copyright Notice.


Note: some devices such as iPads that use iOS browsers, Do not have the capability to downloading multiple files as a default function. If you are experiencing difficulties you will require to down load a free application to able to do this , known as a zip file . Go to the AppStore to down load a zip file app. Single file downloads are not effected.