| Application Number | 17/00432/FUL |
| Status | Application Refused |
| Application Valid |
|---|
| 15/03/2017 |
| Consultation End |
|---|
| 16/02/2018 |
| Committee Meeting |
|---|
| N/A |
| Decision |
|---|
| Refusal |
| Decision Date |
|---|
| 23/10/2017 |
| Appeal Started |
|---|
| 15/02/2018 |
| Appeal Decision |
|---|
| Allowed |
| Summary | |
| Application Number | 17/00432/FUL |
| Location Address | Allesborough Farm, Allesborough Hill, Pershore, WR10 2AB |
| Proposal | Demolition of existing modern farm buildings, removal of hardstanding and erection of 27no dwellings with associated landscaping enhancements. |
| Status | Refusal |
| Application Type | Full planning permission |
| Appeal Decision | Allowed |
| Important Dates | |
| Application Received Date | 28/02/2017 |
| Application Valid Date | 15/03/2017 |
| Consultation Start Date | 21/03/2017 |
| Site Visited / Site Notice Date | |
| Consultation End | 16/02/2018 |
| Advert Expiry | 24/04/2017 |
| Committee Date (if applicable) | |
| Committee Agenda | Planning Committee Information |
| Decision Date | 23/10/2017 |
| Further Information | |
| Expected Decision Level | Committee |
| Case Officer | Jonathan Edwards |
| Parish | Pershore |
| Ward | Pershore Ward - Pre 01/05/23 |
| Applicant | William Morrison (Pershore) Ltd |
| Agent | SF Planning Limited |
| Agent Address | 12 Royal Crescent Cheltenham GL50 3DA |
| Condition Details / Information Notes |
| The proposed development would be located outside of the development boundary of Pershore as defined by Policy SWDP2 of the South Worcestershire Development Plan. The site is therefore defined as being in the open countryside, where development shall be strictly controlled. The proposed development fails to accord with the provisions of policy SWDP2 part C of the South Worcestershire Development Plan 2016 and is not supported by any other SWDP policy. In line with the provisions of para. 15 of the NPPF, the policies of the SWDP reflect the presumption in favour of sustainable development and guide how the presumption should be applied locally. The Council can demonstrate a robust supply of specific deliverable sites sufficient to provide five years' worth of housing against the objectively assessed housing need identified as recommended by and set by the South Worcestershire Development Plan examination Inspector. Consequently, the strategic housing policies of the adopted development plan are not to be regarded as out of date in terms of paragraph 49 of the Framework. Therefore, the last bullet point of paragraph 14 of the Framework is not engaged and SWDP2 carries the full weight of the statutory development plan with respect to the distribution of housing development. Paragraphs 11, 12, 17 and 196 of the National Planning Policy Framework state that the planning system is plan-led and that planning law requires that planning applications must be determined in accordance with the development plan unless material considerations indicate otherwise. No material circumstances exist that justify a departure from the policies of the development plan and the grant of planning permission would go against the core planning principle that planning should be genuinely plan-led. The proposal would not represent sustainable development and the adverse impacts of the scheme would significantly and demonstrably outweigh the benefits. The proposed development is, therefore contrary to adopted South Worcestershire Development Plan (2016) Policies SWDP1 & SWDP2 as well as guidance contained in the National Planning Policy Framework (2012). |
| The application submissions indicate that 4 of the 27 units proposed would be provided as affordable units, although no legal agreement has been completed that secures the delivery of any affordable dwellings. Under the provisions of policy SWDP15 of the South Worcestershire Development Plan 2016 on site provision of 10 affordable houses as well as contribution towards off-site provision should be included as part of the scheme/application unless shown that the proposal can not support such provision for viability reasons. Insufficient information has been submitted that shows the scheme is unable to support the level of affordable housing required under policy SWDP15. As last used for agricultural purposes, the site is not brownfield or previously developed land (as defined in the NPPF) and therefore vacant building credit does not apply. There is no legal agreement is in place to secure any actual provision of affordable housing or monies in lieu of on-site provision. In the absence of a legal agreement to secure the provision of affordable housing, the proposal would fail to fulfil the social strand of sustainable development, as set out at Paragraph 7 of the National Planning Policy Framework. Accordingly, the proposed development is contrary to Policy SWDP15 and paragraphs 7 and 50 of the National Planning Policy Framework. |
| Whilst the applicant has indicated a willingness to enter into a legal agreement, no secure arrangements are in place to ensure the provision of contributions to be made towards the provision/enhancement of public open space (in lieu of sufficient on-site provision nor towards cycling infrastructure. These are necessary to mitigate the effects of the development and to ensure the proposal represents sustainable development in accordance with Regulation 122 of the Community Infrastructure Levy Regulations 2010. Accordingly the proposed development is contrary to Policies SWDP4, SWDP7 and SWDP39 of the South Worcestershire Development Plan 2016 and guidance set out in the National Planning Policy Framework. |
| Positive and Proactive Statement. In dealing with this application, the Council has worked with the applicant in the following ways:- - seeking further information following receipt of the application; - considering the imposition of conditions and or the completion of a s.106 legal agreement In such ways the Council has demonstrated a positive and proactive manner in seeking solutions to problems arising in relation to the planning application. This is in accordance with paragraphs 186 and 187 of the NPPF. Despite these efforts, the Council still consider that planning permission should be refused for the reasons set out above. |
| Prior to the commencement of building operations on the site details of existing and proposed datum site levels shall be submitted to and approved by the local planning authority. The development shall be constructed on the basis of the approved levels. |
| No development shall take place until a programme of archaeological work, including a Written Scheme of Investigation, and/or a programme of historic building recording, and interpretation, has been submitted to and approved by the local planning authority in writing. The scheme shall include an assessment of significance and research questions; and: a. The programme and methodology of site investigation and recording. b. The programme for post investigation assessment. c. Provision to be made for analysis of the site investigation and recording. d. Provision to be made for publication and dissemination of the analysis and records of the site investigation e. Provision to be made for archive deposition of the analysis and records of the site investigation f. Nomination of a competent person or persons/organisation to undertake the works set out within the Written Scheme of Investigation. No demolition/development shall take place other than in accordance with the Written Scheme of Investigation. The development shall not be occupied until the site investigation and post investigation assessment has been completed in accordance with the programme set out in the Written Scheme of Investigation and the provision made for analysis, publication and dissemination of results and archive deposition has been secured. |
| The development hereby permitted shall not begin until a Construction Management Plan has been submitted to and approved in writing by the local planning authority. The approved statement shall be adhered to throughout the construction of the development. The statement shall provide for:- (a) Parking of vehicles of site operatives and visitors; (b) Loading and unloading of plant and materials within the application site; (c) Storage of plant and materials; (d) Siting of site offices; (e) Wheel washing equipment; (f) Measures to protect the amenities of nearby properties and the highway from noise, vibration and dust during construction. |
| No building operations hereby permitted shall commence until details of the materials to be used in the construction of the external surfaces of the buildings and structures (including walls and boundary features) hereby permitted have been submitted to and approved in writing by the local planning authority. The details to be submitted shall include:- - type, colour, texture, size, coursing, finish, jointing and pointing of brickwork/stonework; - type, colour, texture, size and design of roofing materials; - detailed specification of the new weatherboarding showing the dimensions, profile and a description of the stain or paint finish to be applied to the boarding: - details of all external doors, porches and windows. |
| Development, other than that required to be carried out as part of an approved scheme of remediation, shall not commence until Parts 1 to 6 have been complied with: Part 1 A preliminary risk assessment shall be carried out. This study shall take the form of a Phase I desk study and site walkover and shall include the identification of previous site uses, potential contaminants that might reasonably be expected given those uses and any other relevant information. A preliminary risk assessment report including:- - a diagrammatical representation (conceptual model) based on the information above; and - all potential contaminants, sources and receptors to determine whether a site investigation is required shall be submitted to and approved in writing by the Local Planning Authority prior to the commencement of construction works on the development hereby Part 2 Where an unacceptable risk is identified and prior to the commencement of construction work on the development hereby permitted a scheme for detailed site investigation shall be submitted to and approved in writing by the Local Planning Authority. The scheme shall be designed to assess the nature and extent of any contamination and shall be led by the findings of the preliminary risk assessment. Part 3 Where part 2 applies, a detailed site investigation and risk assessment shall be undertaken in accordance with the approved scheme required under Part 2 and a written report of the findings produced, submitted to and approved in writing by the local planning authority. The investigation/assessment shall be approved prior to the commencement of construction works on the development hereby approved. Part 4 Where identified as necessary in the report approved under Part 3, a detailed remediation scheme to bring the site to a condition suitable for the intended use by removing unacceptable risks to identified receptors shall be produced, submitted to and approved in writing by the local planning authority. The scheme shall include an implementation programme. The scheme shall be approved prior to the commencement of construction works on the development hereby approved. Part 5 The remediation scheme approved under Part 4 shall be carried out in accordance with the approved implementation programme. Part 6 Following the completion of the measures identified in the remediation scheme approved under Part 4, a validation report that demonstrates the effectiveness of the remediation carried out shall be produced, submitted to and approved in writing by the Local Planning Authority. None of the development hereby approved shall be occupied/first used until the validation report has been approved. Part 7 In the event that contamination is found at any time when carrying out the approved development that was not previously identified in the report approved under Part 3, construction works shall cease and this shall be reported immediately in writing to the Local Planning Authority. In such circumstances an investigation and risk assessment must be undertaken and a revised remediation scheme must be produced, submitted to and approved in writing by the Local Planning Authority. Development works shall not resume until the revised remediation scheme has been approved in writing. The measures as set out in the revised remediation scheme shall be carried out. Following the completion of any measures identified in the approved revised remediation scheme a validation report must be produced, submitted to and approved in writing by the Local Planning Authority. None of the development hereby approved shall be occupied/first used until the validation report has been approved. |
| The development shall not be first occupied until engineering details and specification of the proposed roads, footways, individual vehicular accesses, driveways and turning areas (as shown on the approved plans), as well as drainage to serve these facilities have been submitted to and approved in writing by the local planning authority. None of the dwellings hereby approved shall be occupied until the roads necessary to provide access from the nearest publicly maintained highway and associated parking and turning facilities have been completed in accordance with the approved details. |
| No building hereby permitted shall be occupied until details of the design, implementation, maintenance and management of sustainable urban drainage/surface water drainage works have been submitted to and approved in writing by the local planning authority. The submitted details shall: (i) provide information about the design storm period and intensity, the method employed to delay and control the surface water discharged from the site and the measures taken to prevent pollution of the receiving groundwater and/or surface waters; (ii) include a timetable for its implementation; and (iii) provide a management and maintenance plan for the lifetime of the development which shall include the arrangements for adoption by any public authority or statutory undertaker and any other arrangements to secure the operation of the scheme throughout its lifetime. The development shall be carried out, and the drainage maintained/managed, in accordance with the approved details. |
| Prior to the occupation of any part of the development hereby permitted details of renewable or low carbon energy generating facilities to be incorporated as part of the development shall be submitted to and approved in writing by the local planning authority. The details shall demonstrate that at least 10% of the predicted energy requirements of the development will be met through the use of renewable/low carbon energy generating facilities. The approved facilities shall be provided prior to any part of the development hereby permitted being first occupied or in accordance with a timetable submitted to and approved by the local planning authority as part of the details required by this condition. |
| The development hereby approved shall not be first used/occupied until details of the residential T junction and 2 m wide footways to be provided along Rebecca Road have been submitted to and approved in writing by the local planning authority. None of the dwellings hereby approved shall be first occupied until the T junction and footways on Rebecca Road have been fully constructed in accordance with the approved details. |
| Prior to the first occupation/use of any part of the development hereby permitted, details of bat roosting feature and bird nesting box(es) to be provided as part of the approved development shall be submitted to and approved in writing by the Local Planning Authority. The details to be submitted shall include an implementation timetable. The feature(s) shall be provided in accordance with the approved details and in accordance with the approved timetable. |
| Before the first use/occupation of the development hereby permitted a scheme of landscaping shall be submitted to and approved in writing by the Local Planning Authority. The landscaping scheme shall include:- (i) a plan(s) showing details of all existing trees and hedges on the application site. The plan should include, for each tree/hedge, the accurate position, canopy spread and species, together with an indication of any proposals for felling/pruning and any proposed changes in ground level, or other works to be carried out, within the canopy spread. (ii) a plan(s) showing the layout of proposed tree, hedge and shrub planting and grass areas. (iii) a schedule of proposed planting - indicating species, sizes at time of planting and numbers/densities of plants. (iv) a written specification outlining cultivation and other operations associated with plant and grass establishment. (v) a schedule of maintenance, including watering and the control of competitive weed growth, for a minimum period of five years from first planting. All planting and seeding/turfing shall be carried out in accordance with the approved details in the first planting and seeding/turfing seasons following the completion or first occupation/use of the development, whichever is the sooner. The planting shall be maintained in accordance with the approved schedule of maintenance. Any trees or plants which, within a period of five years from the completion of the planting, die, are removed or become seriously damaged or diseased shall be replaced in the next planting season with others of similar size and species. |
Plans, drawings and material submitted to the council are protected by the copyright acts (section 47, 1988 act). You may only use material which is downloaded and/or printed for consultation purposes, to compare current applications with previous schemes and to check whether developments have been completed in accordance with approved plans. Further copies must not be made without the prior permission of the copyright owner.
Tick here to show you have read and agree with the Copyright Notice.
Document Download Tips
How to reorder or group rows
Click on a column heading for the ability to sort the ‘group’ listing in ascending or descending order by using the up/down arrows. This is useful to sort by ‘name/organisation’.
In addition to consultations with the consultee listed, we will publicise the application in accordance with national requirements and our local policy. This publicity usually takes the form of letters to nearby properties, the posting of site notices and/or the placing of a public notice in our local newspapers.
| Address | Sent | Reply Received |
|---|---|---|
| 14,claypatch road, wyesham monmouth np253pn | 26/03/2017 | |
| 56 Bridge Street, PERSHORE, WR10 1AX | 24/04/2017 | |
| 6 Choules Close, PERSHORE, WR10 2FB | 06/04/2017 |
| Name | Organisation | Sent | Reply Due | Reply Received |
|---|---|---|---|---|
| Ben Lawless | Conservation Officer | 21/03/2017 | 11/04/2017 | 11/04/2017 |
| Cllr Charles Tucker | Pershore Ward | 21/03/2017 | 11/04/2017 | |
| Cllr Mrs Val Wood | Pershore Ward | 21/03/2017 | 11/04/2017 | |
| Cllr Tony Rowley | Pershore Ward | 21/03/2017 | 11/04/2017 | |
| Drainage Engineer | Engineers - S.W. Land Drainage Partnership | 21/03/2017 | 11/04/2017 | 31/03/2017 |
| Highways | County Highways | 21/03/2017 | 11/04/2017 | 10/10/2017 |
| Housing Team - WDC | Housing - WDC | 21/03/2017 | 11/04/2017 | |
| Jackie Godfrey-Hunt | West Mercia Police, Design Out Crime Officer | 21/03/2017 | 11/04/2017 | 30/03/2017 |
| Landscape Officer | WDC Landscape Officer | 21/03/2017 | 11/04/2017 | |
| Miss Rhiannon Thomas - DO NOT USE | Severn Trent Water Ltd | 21/03/2017 | 11/04/2017 | |
| Mrs Charlie MacIntyre | Pershore Town Council | 21/03/2017 | 11/04/2017 | |
| Mrs V Wood | Pershore Civic Society | 21/03/2017 | 11/04/2017 | |
| WCC LLFA Planning Consultation | WCC Lead Local Flood Authority | 21/03/2017 | 11/04/2017 | |
| WDC Heritage Officer | WDC Heritage Officer | 21/03/2017 | 11/04/2017 | |
| WDC Natural Heritage & Biodiversity Officer | WDC Natural Heritage & Biodiversity | 21/03/2017 | 11/04/2017 | |
| Worcestershire Regulatory Services - Cont. Land | Worcestershire Regulatory Services | 21/03/2017 | 11/04/2017 | 05/04/2017 |
| Constraints List |
| Minor Aquifer |
| Paper: Evesham Journal |
| Grade II Listed Building:1/1/199 - Barn immediately SW of Allesborough Farmhouse |
| Section 106 Agreement |
| Surface Water: Medium 1 in 100 years |
| Surface Water: Low 1 in 1000 years |
| Wind Turbines |
| SWDP 5: Protect and Enhance |
| SWDP 22: Local Geological Sites |
| Appeals Information | |
| Number | 17/00432/FUL |
| PINS Appeal Ref | APP/H1840/W/17/3188250 |
| Method | Hearing Procedure |
| Start date | 15/02/2018 |
| LPA Final Comments Due | 05/04/2018 |
| Interested Party Comments Due | 22/03/2018 |
| Inquiry Date | 26/06/2018 |
| Venue | Wychavon District Council, Civic Centre, Queen Elizabeth Drive, Pershore, Worcs WR10 1PT |
| Decision | Allowed |
| Issue Date | 26/10/2018 |
https://acp.planninginspectorate.gov.uk/ViewCase.aspx?caseid=3188250
Plans, drawings and material submitted to the council are protected by the copyright acts (section 47, 1988 act). You may only use material which is downloaded and/or printed for consultation purposes, to compare current applications with previous schemes and to check whether developments have been completed in accordance with approved plans. Further copies must not be made without the prior permission of the copyright owner.
Tick here to show you have read and agree with the Copyright Notice.
Document Download Tips
How to reorder or group rows
Click on a column heading for the ability to sort the ‘group’ listing in ascending or descending order by using the up/down arrows. This is useful to sort by ‘name/organisation’.