Application Number 20/00585/FUL
Status Application Approved

Sign up to notifications on this planning application Back to search results New search

Planning Online Status


  • Application
    Valid
    26/03/2020
  • Consultation
    End
    27/11/2020
  • Committee
    Meeting
    10/12/2020
  • Decision

    Approval
  • Decision
    Date
    24/06/2021
  • Appeal
    Started
    N/A
  • Appeal
    Decision
    N/A
Summary
Application Number 20/00585/FUL
Location Address Land Between North End And Amajen House Upton Snodsbury Road Pinvin
Proposal Erection of 34 affordable homes
Status Approval
Application Type Full planning permission
Appeal Decision N/A

Important Dates
Application Received Date 18/03/2020
Application Valid Date 26/03/2020
Consultation Start Date 01/04/2020
Site Visited / Site Notice Date
Consultation End 27/11/2020
Advert Expiry 01/10/2020
Committee Date (if applicable) 10/12/2020
Committee Agenda Planning Committee Information
Decision Date 24/06/2021

Further Information
Expected Decision Level Committee
Case Officer Les Greenwood
Parish Pinvin
Ward Pinvin Ward
Applicant Hamelin Partnerships Ltd
Agent Mr Neil Pearce, Avon Planning Services Limited
Agent Address 103 High Street Evesham WR11 4DN

Condition Details / Information Notes
The development hereby permitted shall be begun before the expiration of three years from the date of this permission. Reason: To conform with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
Unless where required or allowed by other conditions attached to this permission/consent, the development hereby approved shall be carried out in accordance with the information (including details on the proposed materials) provided on the application form and the following plans/drawings/documents – 6067-P-001, 6067-P-005, 6067-P-100L, 6067-P-200B, 6067-P-202A, 6067-P-203A, 6067-P-204A, 6067-P-205B, 6067-P-206A, 6067-P-207B, 6067-P-208A, 6067-P-210A, 6067-P-211A, 6067-P-212, 6067-P-723, 6067-P-724, 6067-P-725, 6067-P-726, 6067-P-727A, 6067-P-728, 6067-P-729A, 6067-P-730, 6067-P-731, 6067-P-76067-P-732, 6067-P-733, 6067-P-734, 6067-P-735A, 6067-P-736A, 6067-P-737, 19267-DS01F, 19267-101B, 19267-162 (pond sections only) and 19267-163 (pond sections only). Reason: To define the permission.
(A) No development shall take place until a programme of archaeological work, including a Written Scheme of Investigation, has been submitted to and approved by the local planning authority in writing. The scheme shall include an assessment of significance and research questions; and: 1) The programme and methodology of site investigation and recording. 2) The programme for post investigation assessment. 3) Provision to be made for analysis of the site investigation and recording. 4) Provision to be made for publication and dissemination of the analysis and records of the site investigation. 5) Provision to be made for archive deposition of the analysis and records of the site investigation. 6) Nomination of a competent person or persons/organisation to undertake the works set out within the Written Scheme of Investigation. (B) The development shall not be occupied until the site investigation and post investigation assessment has been completed in accordance with the programme set out in the Written Scheme of Investigation approved under condition (A) and the provision made for analysis, publication and dissemination of results and archive deposition has been secured. Reason: In accordance with the requirements of paragraphs 189 and 199 of the National Planning Policy Framework 2012 (as amended) and SWDP 6 & 24 of the South Worcestershire Development Plan 2016.
No development shall begin until a Construction Environment Management Plan (CEMP) has been submitted to and approved in writing by the Local Planning Authority. The CEMP shall include the following details:- a. details to minimise the impact of noise, vibration and dust from construction, demolition and site clearance activities and the traffic associated with this development, including a scheme for vehicle wheel cleaning and other measures to ensure that vehicles leaving the site do not deposit mud or other detritus on the public highway. The CEMP shall broadly accord with BS 5228 - 1&2:2009 +A1:2014 (Code of practice for noise and vibration control on construction and open sites) and the WRS Demolition and Construction Guidance; b. details of site operative parking areas, material storage areas and the location of site operative facilities (offices, toilets etc); c. restrictions on burning; d. details in relation to the prevention of pollution of waterways; e. construction exclusion zones to prevent soil compaction in areas to be planted and remediation proposals for any soil compaction which does occur; f. a strategy for the handling and storage of topsoil; g. a management strategy and proposals for the minimisation of construction waste; h. details of any temporary construction accesses and their reinstatement; i. a scheme of temporary signage to direct construction related traffic to enter and exit the site; and j. a highway condition survey, timescale for re-inspections, and details of any reinstatement. k. where the development site includes a public right of way, measures to manage and maintain safe use of the right of way by the public and avoid or minimise the need for temporary closure. The measures set out in the approved Plan shall be carried out and complied with in full during the construction of the development hereby approved. Site operatives' parking, material storage and the positioning of operatives' facilities shall only take place on the site in locations approved in writing by the Local Planning Authority. The CEMP should generally comply with the requirements of Worcestershire Regulatory Services Code of Best Practice for Demolition and Construction Sites 1st Edition July 2011 and the Construction Logistics and Community Safety (CLOCS) Standard www.clocs.org.uk/clocsworks Reason: To protect existing and new occupiers of residential areas from the unreasonable effects of noise, vibration, light and dust nuisance, to avoid and mitigate for any potential impact on protected species, minimise the risk of accidents and ensure public rights of way are kept available where possible for the duration of the construction, in accordance with Policies SWDP4, 21 and 22 of the South Worcestershire Development Plan.
No development shall take place (including any ground works, demolition or clearance) until a construction biodiversity management plan (CBMP) has been submitted to and approved in writing by the local planning authority. The CBMP shall include the following: a. Risk assessment of potentially damaging construction activities; b. Identification of “biodiversity protection zones”; c. Practical measures (both physical measures and sensitive working practices) to avoid or reduce impacts during construction (may be provided as a set of method statements); d. The location and timing of sensitive works to avoid harm to biodiversity features; e. The times during construction when specialist ecologists need to be present; f. Responsible persons and lines of communication; g. The role and responsibilities on site of an ecological clerk of works or similarly competent person; h. Use of protective fences, exclusion barriers and warning signs. The approved CBMP shall be adhered to and implemented throughout the construction period strictly in accordance with the approved details, unless otherwise agreed in writing by the local planning authority. Reason: To ensure compliance with the Wildlife and Countryside Act 1981 (as amended) and the Conservation of Habitats and Species Regulations 2010 and SWDP policy 22.
Before the commencement of development hereby permitted an ecological mitigation and enhancement scheme shall be submitted to and approved in writing by the local planning authority. The scheme shall be based on the recommendations contained within the Ecological Impact Assessment by Brindle and Green, dated August 2020 and include an implementation timetable. The works shall thereafter be carried out in accordance with the approved details and timetable. On completion of works the development shall be inspected by a qualified ecologist and a statement of conformity shall be submitted to the Local Planning Authority to confirm whether all of the biodiversity mitigation and enhancement measures have been implemented in accordance with the details approved under this condition. Reason: To ensure the development contributes to the conservation and enhancement of biodiversity within the site and the wider area in accordance with policy SWDP22 of the South Worcestershire Development Plan and to ensure compliance with the Wildlife and Countryside Act 1981 (as amended) and the Conservation of Habitats and Species Regulations 2017.
No above ground building operations hereby permitted shall commence until a landscape and ecological management plan (LEMP) has been submitted to and approved in writing by the local planning authority. The content of the LEMP shall include the following: a. Description and evaluation of the features to be managed; b. Ecological trends and constraints on site that might influence management. c. Aims and objectives of management; d. Appropriate management options for achieving aims and objectives; e. Prescriptions for management actions; f. Preparation of a work schedule, including an annual work plan capable of being rolled forward over a five-year period and longer term thereafter; g. Details of the body or organisation responsible for implementation of the plan; h. Ongoing monitoring and remedial measures. The plan shall also set out where the results of the monitoring show that conservation aims and objectives of the LEMP are not being met, how contingencies and/or remedial action identified, agreed and implemented so that the development still delivers the fully functioning biodiversity objectives of the originally approved scheme. The approved plan will be implemented in accordance with the approved scheme. Reason: To ensure that the proposed development contributes to the conservation and enhancement of biodiversity within the site and for the wider area in accordance with SWDP 22.
No above ground building operations hereby permitted shall commence until details of the hard landscaping of the site including a schedule of materials (including roads, paths, parking areas and other hard surfaces) shall be submitted to and approved in writing by the local planning authority. The hard landscaping of the site shall be completed before the first occupation of the development hereby permitted. Reason - To ensure the proposed development represents high quality design and does not have an adverse effect on the character and appearance of the area in accordance with policies SWDP21 and SWDP25 of South Worcestershire Development Plan.
Before the first use/occupation of the development hereby permitted a scheme of landscaping shall be submitted to and approved in writing by the Local Planning Authority. The landscaping scheme shall include:- (i) a plan(s) showing details of all existing trees and hedges on the application site. The plan should include, for each tree/hedge, the accurate position, canopy spread and species, together with an indication of any proposals for felling/pruning and any proposed changes in ground level, or other works to be carried out, within the canopy spread. (ii) a plan(s) showing the layout of proposed tree, hedge and shrub planting and grass areas. (iii) a schedule of proposed planting - indicating species, sizes at time of planting and numbers/densities of plants. (iv) a written specification outlining cultivation and other operations associated with plant and grass establishment. (v) a schedule of maintenance, including watering and the control of competitive weed growth, for a minimum period of five years from first planting. All planting and seeding/turfing shall be carried out in accordance with the approved details in the first planting and seeding/turfing seasons following the completion or first occupation/use of the development, whichever is the sooner. The planting shall be maintained in accordance with the approved schedule of maintenance. Any trees or plants which, within a period of five years from the completion of the planting, die, are removed or become seriously damaged or diseased shall be replaced in the next planting season with others of similar size and species. Reason - To ensure the proposed development does not have an adverse effect on the character and appearance of the area in accordance with policies SWDP21 and SWDP25 of South Worcestershire Development Plan and to ensure the development contributes to the conservation and enhancement of biodiversity within the site and the wider area in accordance with policy SWDP22 of the plan.
Notwithstanding the details shown on the approved plans, details of the public open space hereby approved shall be submitted to and approved in writing by the Local Planning Authority before the development becomes operative. The details to be submitted/approved shall include the provision of a children's play area of a minimum 72 square metres area and an implementation timetable for the delivery of the public open space/play area. The development shall be carried out in accordance with the approved details/timetable. Reason: To ensure the development incorporates adequate green infrastructure and outdoor recreation space in accordance with policies SWDP5 and SWDP39 of the South Worcestershire Development Plan.
Before the first use/occupation of the development hereby permitted a management plan for the public open space/play area and all other areas of landscaping not within residential curtilages in perpetuity has been submitted to and approved in writing by the local planning authority. The plan shall include details of the arrangements for its implementation, long-term design objectives, management responsibilities and maintenance schedules for all of the defined areas. The approved management plan shall thereafter be fully implemented. Reason - To ensure that the public open space, play area and landscaping are properly maintained to provide good quality amenity space and to avoid adverse effect on the character and appearance of the area in accordance with policies SWDP21 and SWDP25 of South Worcestershire Development Plan.
No above ground building operations hereby permitted shall commence until details of the materials to be used in the construction of the external surfaces of the dwellings hereby permitted have been submitted to and approved in writing by the local planning authority. The details to be submitted shall include:- type, colour of brickwork; - type, colour and design of roofing materials; - a precise specification of the proposed external render or plaster – including any decorative panels or patterns – and detailed specification of the mix, the number of coats and surface finish to be used; - external joinery details along with architectural details of the proposed windows, doors and porches. The development shall be carried out using the materials as approved. Reason - To ensure that the new materials are in keeping with the surroundings and/or represent quality design in accordance with policy SWDP21 of the South Worcestershire Development Plan.
No above ground building operations hereby permitted shall commence until details of renewable and/or low carbon energy generation measures have been submitted to and approved in writing by the Local Planning Authority. The measures shall contribute to at least 10% of the predicted energy requirements of the development. The details to be submitted shall include:- - the overall predicted energy requirements of the approved development; - the predicted energy generation from the proposed renewable/low carbon energy measures; and - an implementation timetable for the proposed measures. The development shall be carried out in accordance with the approved details. Reason - To ensure the development supports the delivery of low carbon/renewable energy and safeguards natural resources in accordance with policy SWDP27 of the South Worcestershire Development Plan.
Prior to the first occupation of any dwelling hereby approved secure parking for cycles to comply with the Council’s standards shall be provided within the curtilage of each dwelling and these facilities shall thereafter be retained for the parking of cycles only. Reason - To comply with the Council’s parking standards
Appropriate cabling and an outside electrical socket shall be provided to each property to enable ease of installation of an electric vehicle charging point (houses with dedicated parking). The charging point must comply with BS7671. The socket must comply with BS1363, and must be provided with a locking weatherproof cover if located externally to the building. For developments with unallocated parking i.e. flats/apartments 1 EV charging point per 10 spaces (as a minimum) must be provided by the developer to be operational at commencement of development. The charging point must comply with BS EN 62196 Mode 3 or 4 charging and BS EN 61851. As a minimum, charge points must comply with Worcestershire County Council Design Guide which requires 7kw charging points for residential developments. Reason: NPPF Paragraphs 105 and 110 of the NPPF state; ’If setting local parking standards for residential and non-residential development, policies should take into account the need to ensure an adequate provision of spaces for charging plug-in and other ultra-low emission vehicles’ and ‘Applications for development should be designed to enable charging of plug-in and other ultra-low emission vehicles in safe, accessible and convenient locations.’
Details shall be submitted to and approved by the local planning authority prior to the first occupation of the development for the installation of Ultra-Low NOx boilers with maximum NOx Emissions less than 40 mg/kWh. The details as approved shall be implemented prior to the first occupation of the development and shall thereafter be permanently retained. Reason: In the interests of air quality and the living conditions of occupiers of nearby properties and future occupiers of the site.
Prior to the first occupation of any of the dwellings hereby approved, details of superfast broadband facilities or alternative solutions to serve the dwellings hereby approved shall be submitted to and approved in writing by the local planning authority. The submitted details shall include an implementation programme. The facilities shall be provided in accordance with the approved details. Reason: To ensure the proposal incorporates satisfactory telecommunication facilities in line with policy SWDP26 of the South Worcestershire Development Plan 2016.
The dwellings hereby permitted shall not be occupied until the access, visibility spays, parking and turning facilities have been provided in accordance with the approved plans. These facilities shall thereafter be retained at all times. Reason - To ensure the proposed development is provided with adequate vehicular access and parking, in the interests of road safety and to prevent indiscriminate parking on the public highway in accordance with the objectives of South Worcestershire Development Plan Policy SWDP4.
The dwellings hereby permitted shall not be occupied until the footway along the Upton Snodsbury Road frontage of the site has been widened and improved in accordance with details first submitted to and approved in writing by the Local Planning Authority. Reason: in the interests of sustainability and highway safety, in accordance with South Worcestershire Development Plan Policy SWDP4.
No building hereby permitted shall be occupied until details of the design, implementation, maintenance and management of sustainable urban drainage/surface water drainage works have been submitted to and approved in writing by the local planning authority. The submitted details shall: 1.    provide information about the design storm period and intensity, the method employed to delay and control the surface water discharged from the site and the measures taken to prevent pollution of the receiving groundwater and/or surface waters; 2. include an exceedance flow routing plan for flows above the 1 in 100+40% event; 3.    include a timetable for its implementation; and 4.    provide a management and maintenance plan for the lifetime of the development which shall include the arrangements for adoption by any public authority or statutory undertaker and any other arrangements to secure the operation of the scheme throughout its lifetime. The development shall be carried out, and the drainage maintained/managed, in accordance with the approved details. Reason: To ensure the proposed development does not exacerbate flood risk and deals with surface water run-off from the site in a sustainable manner, in accordance with policies SWDP28 and SWDP29 of the South Worcestershire Development Plan.
None of the dwellings hereby permitted shall be occupied until measures for the minimisation of the use of water including measures for the re-use of rainwater have been installed in accordance with details first submitted to and approved in writing by the Local Planning Authority. The approved measures shall be retained thereafter. Reason: To ensure that adequate measures for the efficient use of water are provided in accordance with policy SWDP30 of the South Worcestershire Development Plan 2016.
Positive and Proactive Statement. In dealing with this application, the Council has worked with the applicant in the following ways:- providing pre-application advice; - seeking further information following receipt of the application; - seeking amendments to the proposed development following receipt of the application; - considering the imposition of conditions and or the completion of a s.106 legal agreement. In such ways the Council has demonstrated a positive and proactive manner in seeking solutions to problems arising in relation to the planning application.
The applicant must be aware of their obligations as follows: No disturbance of, or change to, the surface of the path or part thereof should be carried out without written consent (this includes laying concrete, tarmac or similar). No diminution in the width of the right of way available for use by the public. Buildings materials must not be stored on the right of way, Vehicle movements and parking to be arranged so as not to unreasonably interfere with the public's use of the right of way. No additional barriers are placed across the right of way. The safety of the public using the right of way is to be ensured at all times. The Definitive Map is a minimum record of public rights of way and does not preclude the possibility that unrecorded public rights may exist, nor that higher rights may exist than those shown.
It is expected that contractors are registered with the Considerate Constructors scheme and comply with the code of conduct in full, but particular reference is made to "respecting the community" this says: Constructors should give utmost consideration to their impact on neighbours and the public • Informing, respecting and showing courtesy to those affected by the work. • Minimising the impact of deliveries, parking and work on the public highway. • Contributing to and supporting the local community and economy. • Working to create a positive and enduring impression and promoting the Code. The CEMP should clearly identify how the principle contractor will engage with the local community, this should be tailored to local circumstances. Contractors should also confirm how they will manage any local concerns and complaints and provide an agreed Service Level Agreement for responding to said issues. Contractors should ensure that courtesy boards are provided and information shared with the local community relating to the timing of operations and contact details for a site coordinator in the event of any difficulties. This does not offer any relief to obligations under existing Legislation.
Any proposed works within the adjacent watercourse will require Ordinary Watercourse Land Drainage Consent. This is obtained from the Engineering Section of Wychavon District Council.
Work should avoid disturbance to nesting birds. Nesting birds are protected under the 1981 Wildlife and Countryside Act and the Countryside and Rights of Way Act 2000. The main nesting season lasts approximately from March to September, so work should take place outside these dates if at all possible. However, birds can nest at any time and the site including any buildings should ideally be checked for their presence immediately before work starts.
This permission does not authorise the applicant to carry out works within the publicly maintained highway since such works can only be carried out by the County Council's Approved Contractor following the issue of a license under Section 184 and 278 of the Highways Act, 1980. The applicant should contact Worcestershire County Council's Highways Community and Response Unit, County Hall, Spetchley Road, Worcester WR5 2NP (telephone 0845 607 2005), regarding the issue of the necessary license authorising the access works to be carried out by the County Council's Approved Contractor at the applicant's expense. The applicant should give the County Council sufficient notice to enable, as far as possible, the licence procedure to be carried out so that there is no disruption to the applicant's programme of works.
Each reserved matters application shall include details of means to be included to facilitate the re-use of rainwater to minimise the use of water measures in each dwelling. The approved details shall be fully implemented prior to the first occupation of the dwelling and remain thereafter. Reason: To ensure that an appropriate sustainable drainage system is provided to serve the development in accordance with policy SWDP29 of the South Worcestershire Development Plan 2016.
If it is the Developer's intention to request the County Council, as a Highway Authority, to adopt the proposed road works as maintainable at the public expense, then details of the layout and alignment, widths and levels of the proposed road works, which shall comply with the County Council's requirements, together with all necessary drainage arrangements and run off calculations shall be submitted to Worcestershire County Council's Network Control Manager, Environmental Services Directorate, County Hall, Spetchley Road, Worcester WR5 2NP (telephone 01905 763763). No works on the site of the development shall be commenced until these details have been approved and an Agreement under Section 38 of the Highways Act, 1980, entered into.

Copyright Notice

Plans, drawings and material submitted to the council are protected by the copyright acts (section 47, 1988 act). You may only use material which is downloaded and/or printed for consultation purposes, to compare current applications with previous schemes and to check whether developments have been completed in accordance with approved plans. Further copies must not be made without the prior permission of the copyright owner.

Tick here to show you have read and agree with the Copyright Notice.

Document Download Tips

  • In order to view the documents please ensure you have ticked the Copyright Notice box above.
  • In order to view PDF documents, you will need to have the free Adobe Acrobat Reader software installed on your computer. Click here to download.
  • To view individual documents click on the 'Document Type' on the row you require and the document will open as an Adobe Acrobat pdf.
  • To download multiple documents in one go, tick all the boxes relating to the documents you wish to view and click Download selected files button.
  • If you wish to download ALL documents place a tick in the box in the header row and click 'Download Selected Files' button.
  • Note: some devices such as iPads that use iOS browsers do not have the standard capability to download multiple files as a default function. If you are experiencing difficulties you may need to download a free application to enable you to do this - known as a zip file. Go to the AppStore to download a zip file ‘app’.

How to reorder or group rows

Click on a column heading for the ability to sort the ‘group’ listing in ascending or descending order by using the up/down arrows. This is useful to sort by ‘name/organisation’.

Document Type Date Description File Size Drawing/Rev Number
Application Documents
Application Plans
Neighbour and Other Response
Statutory Consultee Response
Committee Documents
Decision
Discharge of Condition Appeal
Discharge of Condition
System Generated Letter
Planning Application Documents

Consultation Responses

Neighbour List


In addition to consultations with the consultee listed, we will publicise the application in accordance with national requirements and our local policy. This publicity usually takes the form of letters to nearby properties, the posting of site notices and/or the placing of a public notice in our local newspapers.


Name Address Sent Reply Received
Alycia The Granary Church Lane Pinvin PERSHORE WR10 2EU 20/04/2020
Andrew Constable 3 Coates Drive Pinvin PERSHORE WR10 2DH 15/10/2020
Anthony Owen 42 Gosney Fields Pinvin PERSHORE WR10 2ND 21/04/2020
Anthony Owen 42 Gosney Fields Pinvin PERSHORE WR10 2ND 10/09/2020
Ben Rowlinson 36 Gosney Fields Pinvin PERSHORE WR10 2ND 17/06/2020
Ben Rowlinson 36 Gosney Fields Pinvin PERSHORE WR10 2ND 30/09/2020
Chairman Pinvin Parish Council 4 Willow Close Pinvin PERSHORE WR10 2RZ 21/04/2020
charles watson Rae Watson Development Surveyors Broome Cottage Evenlode Moreton-in-Marsh 24/04/2020
Charlotte McCairn 32 Gosney Fields Pinvin PERSHORE WR10 2ND 20/04/2020
Courtney Moyo 3 Parker Close Pinvin PERSHORE WR10 2DN 17/04/2020
Courtney Moyo 3 Parker Close Pinvin PERSHORE WR10 2DN 17/04/2020
Elizabeth Cullis Pool Corner Owletts End Pinvin PERSHORE WR10 2ES 17/06/2020
Emma Clarke Colinswood Main Street Pinvin PERSHORE WR10 2ES 20/04/2020
Emma Wilesmith 8 Coates Drive Pinvin PERSHORE WR10 2DH 16/04/2020
Evie woodfield 15 Parker Close Pinvin PERSHORE WR10 2DN 11/09/2020
Gavin Roberts 6 Coates Drive Pinvin PERSHORE WR10 2DH 14/04/2020
Graham Baker 4 Gosney Fields Pinvin PERSHORE WR10 2ND 10/09/2020
H Bulford Four Jays Church Lane Pinvin PERSHORE WR10 2EU 11/09/2020
H Bulford Four Jays Church Lane Pinvin PERSHORE WR10 2EU 11/09/2020
H Bulford Four Jays Church Lane Pinvin PERSHORE WR10 2EU 11/09/2020
H Bulford Four Jays Church Lane Pinvin PERSHORE WR10 2EU 11/09/2020
Hatton 1 Gosney Fields Pinvin PERSHORE WR10 2ND 22/11/2020
Highway Authority Development Management Transport Planning Unit Worcestershire County Council County Hall, Spetchley Road, Worcester, WR5 2NP ngorski@worcestershire.gov.uk 11/06/2020
Isobel McBurney Sealand Main Street Pinvin PERSHORE WR10 2ES 21/04/2020
Isobel McBurney Sealand Main Street Pinvin PERSHORE WR10 2ES 22/04/2020
Isobel McBurney Sealand Main Street Pinvin PERSHORE WR10 2ES 22/04/2020
Isobel McBurney Sealand Main Street Pinvin PERSHORE WR10 2ES 22/04/2020
Isobel McBurney Sealand Main Street Pinvin PERSHORE WR10 2ES 23/04/2020
Isobel McBurney Sealand Main Street Pinvin PERSHORE WR10 2ES 23/04/2020
Isobel McBurney Sealand Main Street Pinvin PERSHORE WR10 2ES 23/04/2020
Isobel McBurney Sealand Main Street Pinvin PERSHORE WR10 2ES 23/04/2020
Isobel McBurney Sealand Main Street Pinvin PERSHORE WR10 2ES 23/04/2020
Isobel McBurney Sealand Main Street Pinvin PERSHORE WR10 2ES 24/04/2020
Isobel McBurney Sealand Main Street Pinvin PERSHORE WR10 2ES 24/04/2020
Isobel McBurney Sealand Main Street Pinvin PERSHORE WR10 2ES 24/04/2020
Isobel McBurney Sealand Main Street Pinvin PERSHORE WR10 2ES 24/04/2020
Isobel McBurney Sealand Main Street Pinvin PERSHORE WR10 2ES 24/04/2020
Isobel McBurney Sealand Main Street Pinvin PERSHORE WR10 2ES 24/04/2020
Isobel McBurney Sealand Main Street Pinvin PERSHORE WR10 2ES 24/04/2020
Isobel McBurney Sealand Main Street Pinvin PERSHORE WR10 2ES 24/04/2020
Isobel McBurney Sealand Main Street Pinvin PERSHORE WR10 2ES 24/04/2020
Isobel McBurney Sealand Main Street Pinvin PERSHORE WR10 2ES 24/04/2020
Isobel McBurney Sealand Main Street Pinvin PERSHORE WR10 2ES 24/04/2020
Isobel McBurney Sealand Main Street Pinvin PERSHORE WR10 2ES 24/04/2020
Isobel McBurney Sealand Main Street Pinvin PERSHORE WR10 2ES 24/04/2020
Isobel McBurney Sealand Main Street Pinvin PERSHORE WR10 2ES 24/04/2020
Isobel McBurney Sealand Main Street Pinvin PERSHORE WR10 2ES 24/04/2020
Isobel McBurney Sealand Main Street Pinvin PERSHORE WR10 2ES 24/04/2020
Isobel McBurney Sealand Main Street Pinvin PERSHORE WR10 2ES 24/04/2020
Isobel McBurney Sealand Main Street Pinvin PERSHORE WR10 2ES 24/04/2020
Isobel McBurney Sealand Main Street Pinvin PERSHORE WR10 2ES 24/04/2020
Isobel McBurney Sealand Main Street Pinvin PERSHORE WR10 2ES 24/04/2020
Isobel McBurney Sealand Main Street Pinvin PERSHORE WR10 2ES 24/04/2020
James lowe Badgers End Church Lane Pinvin PERSHORE WR10 2EU 17/06/2020
Jennifer R. 6 Coates Drive Pinvin PERSHORE WR10 2DH 10/09/2020
Jennifer Roberts 6 Coates Drive Pinvin PERSHORE WR10 2DH 15/04/2020
Jennifer Roberts 6 Coates Drive Pinvin PERSHORE WR10 2DH 22/05/2020
Joanne lines 17 Abbey View Road Pinvin PERSHORE WR10 2DS 24/04/2020
Judy Aherne Fairlawns School Lane Wick PERSHORE WR10 3PD 15/04/2020
Kathleen Lawton 10 Gosney Fields Pinvin PERSHORE WR10 2ND 20/04/2020
Kay Tonbury House Main Street Pinvin PERSHORE WR10 2ER 20/04/2020
Liz Cullid Pool Corner Owletts End Pinvin PERSHORE WR10 2ES 15/10/2020
Lucy Hawkes 6 North End Upton Snodsbury Road Pinvin PERSHORE WR10 2LD 05/04/2020
Mae Daffern 36 Gosney Fields Pinvin PERSHORE WR10 2ND 17/06/2020
Mae Daffern 36 Gosney Fields Pinvin PERSHORE WR10 2ND 30/09/2020
Marc Tillsley 10 Checketts Close Pinvin PERSHORE WR10 2LE 12/09/2020
Martin Clemmey 2 Gosney Fields Pinvin PERSHORE WR10 2ND 25/09/2020
Martina Abbott Old Cycle House Terrace Road Pinvin PERSHORE WR10 2DW 10/09/2020
Matthew Layfield 38 Gosney Fields Pinvin PERSHORE WR10 2ND 11/04/2020
Matthew Payne 20 Gosney Fields Pinvin PERSHORE WR10 2ND 14/04/2020
Melanie Clemmey 2 Gosney Fields Pinvin PERSHORE WR10 2ND 20/04/2020
Melanie Clemmey 2 Gosney Fields Pinvin Pershore WR10 2ND 22/04/2020
Melanie Clemmey 2 Gosney Fields Pinvin PERSHORE WR10 2ND 25/09/2020
Melanie Clemmey 2 Gosney Fields Pinvin PERSHORE WR10 2ND 06/10/2020
Melanie Clemmey 2 Gosney Fields Pinvin PERSHORE WR10 2ND 11/10/2020
Michaela Nottingham Green End The Green Pinvin PERSHORE WR10 2ET 14/04/2020
MR A L CONSTABLE 3 Coates Drive Pinvin PERSHORE WR10 2DH 23/04/2020
Mr Marc Tillsley 10 Checketts Close Pinvin PERSHORE WR10 2LE 17/06/2020
Mrs Amanda Smith 18 Gosney Fields Pinvin PERSHORE WR10 2ND 24/04/2020
Mrs Brown 3 Gosney Fields Pinvin PERSHORE WR10 2ND 06/10/2020
Ms Rachel Burnett 1 Gosney Fields Pinvin PERSHORE WR10 2ND 04/09/2020
Neil Drakeley 40 Gosney Fields Pinvin PERSHORE WR10 2ND 22/04/2020
Neil Edmunds 44 Gosney Fields Pinvin PERSHORE WR10 2ND 20/04/2020
Nicola Bailey 23 Coates Drive Pinvin WR10 2DH 17/06/2020
Nicola Hope 30 Gosney Fields Pinvin PERSHORE WR10 2ND 15/04/2020
Occupier 28 Gosney Fields Pinvin PERSHORE WR10 2ND 13/04/2020
Occupier Sealand Main Street Pinvin PERSHORE WR10 2ES 24/04/2020
Pamela Drakeley 40 Gosney Fields Pinvin PERSHORE WR10 2ND 17/04/2020
Rachel 1 Gosney Fields Pinvin PERSHORE WR10 2ND 13/10/2020
Rachel Burnett 1 Gosney Fields Pinvin PERSHORE WR10 2ND 11/06/2020
Rachel Burnett 10 Gosney Fields Pinvin PERSHORE WR10 2ND 17/09/2020
Rachel Burnett 1 Gosney Fields Pinvin PERSHORE WR10 2ND 30/09/2020
Rachel Burnett 1 Gosney Fields Pinvin PERSHORE WR10 2ND 16/11/2020
Rachel Burnett 1 Gosney Fields Pinvin PERSHORE WR10 2ND 22/11/2020
Ramblers Assoc. Worcs. 1 Lanesfield Park EVESHAM WR11 4NU 16/04/2020
Richard Coates Church Farm Row Orchard Pinvinv WR10 2EU 21/04/2020
Robert Hatton 1 Gosney Fields Pinvin PERSHORE WR10 2ND 21/04/2020
Robert Hatton 1 Gosney Fields Pinvin PERSHORE WR10 2ND 24/04/2020
Robert Hatton 1 Gosney Fields Pinvin PERSHORE WR10 2ND 24/04/2020
Robert Hatton 1 Gosney Fields Pinvin PERSHORE WR10 2ND 26/04/2020
Robert Hatton 1 Gosney Fields Pinvin PERSHORE WR10 2ND 26/04/2020
Robert Hatton 1 Gosney Fields Pinvin PERSHORE WR10 2ND 09/06/2020
Robert Hatton 1 Gosney Fields Pinvin PERSHORE WR10 2ND 11/06/2020
Robert Hatton 1 Gosney Fields Pinvin PERSHORE WR10 2ND 11/06/2020
Robert Hatton 1 Gosney Fields Pinvin PERSHORE WR10 2ND 14/06/2020
Robert Hatton 1 Gosney Fields Pinvin PERSHORE WR10 2ND 18/06/2020
Robert Hatton 1 Gosney Fields Pinvin PERSHORE WR10 2ND 18/06/2020
Robert Hatton 1 Gosney Fields Pinvin PERSHORE WR10 2ND 18/06/2020
Robert Hatton 1 Gosney Fields Pinvin PERSHORE WR10 2ND 08/09/2020
Robert Hatton 1 Gosney Fields Pinvin PERSHORE WR10 2ND 17/09/2020
Robert Hatton 1 Gosney Fields Pinvin PERSHORE WR10 2ND 29/09/2020
Robert Hatton 1 Gosney Fields Pinvin PERSHORE WR10 2ND 13/10/2020
Russell Davis 22 Gosney Fields Pinvin PERSHORE WR10 2ND 13/04/2020
Samantha Cutler 29 Coates Drive Pinvin PERSHORE WR10 2DH 15/04/2020
Sophie Finnerty 38 Gosney Fields Pinvin PERSHORE WR10 2ND 11/04/2020
Stephen Robert MARSH 46 Gosney Fields Pinvin PERSHORE WR10 2ND 14/04/2020
Victoria Owen 42 Gosney Fields Pinvin 11/04/2020
Victoria Owen 42 Gosney Fields Pinvin PERSHORE WR10 2ND 14/09/2020
Occupier 13 North End Upton Snodsbury Road Pinvin Pershore WR10 2LD 31/03/2020
Occupier 14 North End Upton Snodsbury Road Pinvin Pershore WR10 2LD 31/03/2020
Occupier 15 North End Upton Snodsbury Road Pinvin Pershore WR10 2LD 31/03/2020
Occupier 16 North End Upton Snodsbury Road Pinvin Pershore WR10 2LD 31/03/2020
Occupier Hawthorn Upton Snodsbury Road Pinvin Pershore WR10 2LR 31/03/2020
Graham Baker 4 Gosney Fields Pinvin PERSHORE WR10 2ND 03/04/2020 26/04/2020
Jennifer Loxley 8 Gosney Fields Pinvin PERSHORE WR10 2ND 03/04/2020 13/04/2020
Martin Clemmey 2 Gosney Fields Pinvin PERSHORE WR10 2ND 03/04/2020 19/04/2020
Mr R Hatton/Ms R Burnett 1 Gosney Fields Pinvin PERSHORE WR10 2ND 03/04/2020 07/04/2020
Mrs K. Lawton 10 Gosney Fields Pinvin PERSHORE WR10 2ND 03/04/2020 20/04/2020
Mrs Marianne Kate Brown 3 Gosney Fields Pinvin PERSHORE WR10 2ND 03/04/2020 22/04/2020
Occupier 5 Gosney Fields Pinvin Pershore WR10 2ND 03/04/2020
Occupier 7 Gosney Fields Pinvin Pershore WR10 2ND 03/04/2020
Shelagh Cuddy 6 Gosney Fields Pinvin PERSHORE WR10 2ND 03/04/2020 25/04/2020

Consultee List


Name Organisation Sent Reply Due Reply Received
Aidan Smyth WDC Archaeology & Planning Advisor 31/03/2020 21/04/2020 06/04/2020
Cllr Elizabeth Tucker Pinvin Ward 31/03/2020 21/04/2020
Drainage Engineer Engineers 31/03/2020 21/04/2020 01/04/2020
Highways County Highways 31/03/2020 21/04/2020
Housing Team - WDC Housing - WDC 31/03/2020 21/04/2020 21/04/2020
Mrs E Marshall Landscape Officer 31/03/2020 21/04/2020
Mrs S Hiscock Natural Heritage Officer 31/03/2020 21/04/2020
Ms C Hunter Open Space Society 31/03/2020 21/04/2020
Ms R Badham Worcester City (Housing) 31/03/2020 21/04/2020
Nick McGowan Tree Preservation Officer 31/03/2020 21/04/2020
Ramblers Head Office The Ramblers' Association (Worcestershire Area) 31/03/2020 21/04/2020
Sarah Soames WCC Lead Local Flood Authority 31/03/2020 21/04/2020 21/04/2020
The Clerk Pinvin Parish Council 31/03/2020 21/04/2020
Urban Design Consultation MHDC & WDC Urban Design 31/03/2020 21/04/2020
Worcestershire County Council (Public Paths) 31/03/2020 21/04/2020 21/04/2020
Worcestershire Regulatory Services - Cont. Land Worcestershire Regulatory Services 31/03/2020 21/04/2020 01/04/2020
Worcestershire Regulatory Services - Nuisance Worcestershire Regulatory Services 31/03/2020 21/04/2020 01/04/2020
Reference: LAC/WOR192/1 Worcestershire Acute Hospitals NHS Trust 01/04/2020 22/04/2020
Aidan Smyth WDC Archaeology & Planning Advisor 04/06/2020 18/06/2020 11/06/2020
Aidan Smyth WDC Archaeology & Planning Advisor 02/09/2020 16/09/2020 07/05/2021
Cllr Elizabeth Tucker Pinvin Ward 02/09/2020 16/09/2020
Drainage Engineer Engineers 02/09/2020 16/09/2020
Highways County Highways 02/09/2020 16/09/2020
Housing Team - WDC Housing - WDC 02/09/2020 16/09/2020
Mrs S Hiscock Natural Heritage Officer 02/09/2020 16/09/2020 30/10/2020
Policy Plans - General Policy Plans - General 02/09/2020 16/09/2020
Sarah Soames WCC Lead Local Flood Authority 02/09/2020 16/09/2020
The Clerk Pinvin Parish Council 02/09/2020 16/09/2020
Urban Design Consultation MHDC & WDC Urban Design 02/09/2020 16/09/2020
Cllr Elizabeth Tucker Pinvin Ward 29/09/2020 13/10/2020
Housing Team - WDC Housing - WDC 29/09/2020 13/10/2020
The Clerk Pinvin Parish Council 29/09/2020 13/10/2020 12/10/2020
Drainage Engineer Engineers 13/11/2020 27/11/2020
The Clerk Pinvin Parish Council 01/12/2020

Constraints List


Constraints List
SWDP 5: Protect and Enhance
Minor Aquifer
Paper: Evesham Journal - Thursday
Outside SWDP Development Boundary
CIL008 - Non-Urban Area
Landfill Consultation
Public Right of Way: Type: Footpath Path No: 3
Surface Water: High 1 in 30 extent
Surface Water: Medium 1 in 100 extent
Surface Water: Low 1 in 1000 extent
Wind Turbines
SWDP 15: Designated Rural Areas
No associated appeals