Condition Details / Information Notes |
The development hereby permitted shall be begun before the expiration of three years from the date of this permission.
Reason: To conform with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
Unless where required or allowed by other conditions attached to this permission/consent, the development hereby approved shall be carried out in accordance with the information (including details on the proposed materials) provided on the application form and the following plans/drawings/documents –
Bat Survey Report (Zebra Ecology September 2021) – ZEL_138
Planning Statement (including Water Management Statement and Energy Statement) – No reference
Site Location Plan, Existing and Proposed Block Plan – Plan MAB1
Proposed Floor Plans and Elevations – PLAN MAB3A
Car Port Floor Plans and Elevations – PLAN MAB4
Reason: To define the permission. |
The Development hereby permitted shall not be first occupied until sheltered and secure cycle parking to comply with the Council’s adopted highway design guide has been provided in accordance with details which shall first be submitted to and approved in writing by the Local Planning Authority and thereafter the approved cycle parking shall be kept available for the parking of bicycles only.
REASON: To comply with the Council’s parking standards. |
The Development hereby approved shall not be brought into use until the access, parking and turning facilities have been provided as shown on drawing MAB 1.
REASON: To ensure conformity with submitted details. |
This permission does not authorise the applicant to carry out works within the publicly maintained highway since such works can only be carried out by the County Council’s Approved Contractor, Ringway Infrastructure Service who can be contacted by email worcestershirevehicle.crossing@ringway.co.uk. The applicant is solely responsible for all costs associated with construction of the access. |
Before the first occupation of development hereby permitted, details of renewable and/or low carbon energy generation measures shall be submitted to and approved in writing by the Local Planning Authority. The measures shall contribute to at least 10% of the predicted energy requirements of the development and must be installed and operational prior to the development herby permitted being occupied. The details to be submitted shall include:-
- the overall predicted energy requirements of the approved development;
- the predicted energy generation from the proposed renewable/low carbon energy measures; and
- an implementation timetable for the proposed measures.
The development shall be carried out in accordance with the approved details.
Reason: To ensure the development supports the delivery of low carbon/renewable energy and safeguards natural resources in accordance with policy SWDP27 of the South Worcestershire Development Plan.
|
Before the first occupation of the building(s) hereby permitted the two en-suite windows at first floor level on the side elevation opposite the property sited to the north known as Plough Cottage shall be fitted with Pilkington Level 4 obscured glazing or equivalent and shall be permanently retained in that condition thereafter.
Reason: To protect the amenities of adjoining/nearby properties from unacceptable overlooking/loss of privacy and/or represent quality design in accordance with policy SWDP21 of the South Worcestershire Development Plan. |
No work shall commence on the external surfaces of the replacement dwelling and car port hereby permitted shall commence until details of the materials to be used in the construction of the external surfaces of the replacement dwelling and car port have been submitted to and approved in writing by the local planning authority. The details to be submitted shall include:-
- type, colour, texture, size, coursing, finish, jointing and pointing of brickwork/stonework;
- type, colour, texture, size and design of roofing materials;
- sample panel of the brickwork, type of pointing and the mortar to be used with the panel kept on site for reference;
- a precise specification of the proposed external render or plaster – including any decorative panels or patterns – and detailed specification of the mix, the number of coats and surface finish to be used;
- detailed specification of the new weatherboarding showing the dimensions, profile and a description of the stain or paint finish to be applied to the boarding:
- details of the approved rooflights, including drawings showing design, materials and profile;
- details of external vents, ventilation slits, extracts and chimney flues including information on specification and colour;
- details of external windows/doors/garage doors including information on finish;
The development shall be carried out using the materials as approved.
Reason - To ensure that the new materials are in keeping with the surroundings and/or represent quality design in accordance with policy SWDP21 of the South Worcestershire Development Plan.
|
The Development hereby permitted shall not be first occupied until the proposed dwelling has been fitted with an electric vehicle charging point. The charging points shall comply with BS EN 62196 Mode 3 or 4 charging and BS EN 61851 and the Worcestershire County Council Streetscape Design Guide. The electric vehicle charging point shall be retained for the lifetime of the development unless they need to be replaced in which case the replacement charging point(s) shall be of the same specification or a higher specification in terms of charging performance.
Reason: To encourage sustainable travel and healthy communities and be compliant with the Worcestershire Streetscape Design Guide. |
Prior to the commencement of the development hereby permitted, a demolition precautionary measures and biodiversity enhancement statement shall be submitted to and approved in writing to the local planning authority. The details shall include:
- Precautionary measures during demolition
- Type, location and scale of bat box(s)
- Any other means of biodiversity enhancements
The development shall be carried out in accordance with the approved details.
Reason: The building has moderate bat roost potential. albeit no roosts were identified. Precautionayr measures are required to ensure the works are undertaken in a manner that adequately considers the potential for bat roosts to be found during its demolition. In addition, SWDP22 requires development proposals to be designed to incorporate biodiversity enhancements. |
Before the development hereby permitted is first occupied/used, details of any external lighting to be provided in association with the development shall be submitted to and approved in writing by the Local Planning Authority. The details shall include times when the external lighting will not be switched on. Only external lighting in accordance with approved details shall be provided on the application site. Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (or any Order revoking or re-enacting that Order with or without modification) there shall be no other external lighting provided on the application site.
Reason: To ensure the development contributes to the conservation and enhancement of biodiversity within the site and the wider area in accordance with policy SWDP22 of the South Worcestershire Development Plan. |
Demolition, clearance or construction work and deliveries to and from the site in connection with the development hereby approved shall only take place between the hours of 08.00 and 18.00hrs Monday to Friday and 08.00 and 13.00hrs on a Saturday. There shall be no demolition, clearance or construction work or deliveries to and from the site on Sundays or Bank Holidays.
Reason - To preserve the amenities of the locality in accord with Policy SWDP21 of the South Worcestershire Development Plan. |
Before the first use/occupation of the development hereby permitted a scheme of landscaping shall be submitted to and approved in writing by the Local Planning Authority. The landscaping scheme shall include:-
(i) a plan(s) showing details of all existing trees and hedges on the application site. The plan should include, for each tree/hedge, the accurate position, canopy spread and species, together with an indication of any proposals for felling/pruning and any proposed changes in ground level, or other works to be carried out, within the canopy spread.
(ii) a plan(s) showing the layout of proposed tree, hedge and shrub planting and grass areas.
(iii) a schedule of proposed planting - indicating species, sizes at time of planting and numbers/densities of plants.
(iv) a written specification outlining cultivation and other operations associated with plant and grass establishment.
(v) a schedule of maintenance, including watering and the control of competitive weed growth, for a minimum period of five years from first planting.
All planting and seeding/turfing shall be carried out in accordance with the approved details in the first planting and seeding/turfing seasons following the completion or first occupation/use of the development, whichever is the sooner.
The planting shall be maintained in accordance with the approved schedule of maintenance. Any trees or plants which, within a period of five years from the completion of the planting, die, are removed or become seriously damaged or diseased shall be replaced in the next planting season with others of similar size and species.
Reason - To ensure the proposed development does not have an adverse effect on the character and appearance of the area in accordance with policies SWDP21 and SWDP25 of South Worcestershire Development Plan. |
Positive and Proactive Statement. In dealing with this application, the Council has worked with the applicant in the following ways:
- seeking further information following receipt of the application;
- seeking amendments to the proposed development following receipt of the application;
- considering the imposition of conditions and or the completion of a s.106 legal agreement.
In such ways the Council has demonstrated a positive and proactive manner in seeking solutions to problems arising in relation to the planning application. |