Application Number W/24/02613/OUT
Status Application Approved

Sign up to notifications on this planning application Back to search results New search

Planning Online Status


  • Application
    Valid
    03/04/2025
  • Consultation
    End
    11/06/2025
  • Committee
    Meeting
    N/A
  • Decision

    Approval
  • Decision
    Date
    27/02/2026
  • Appeal
    Started
    N/A
  • Appeal
    Decision
    N/A
Summary
Application Number W/24/02613/OUT
Location Address Worcester Warriors Sixways Stadium Warriors Way Hindlip Worcester WR3 8ZE
Proposal Outline application with all matters reserved except access, for a mixed use redevelopment at Sixways comprising: (1) a new north stand with associated events centre, esports facilities, food and beverage concessions (Use Classes F2 and A5); (2) construction of a hotel of up to 5-storeys (Use Class C1); (3) construction of a medical/sports rehabilitation and office building (Use Class E) (4) construction of an outdoor padel centre with canopy and associated facilities (Use Class F2); (5) creation of a drive thru (Sui Generis and Use Class E(b)) with associated EV charging; (6) provision of light industrial and trade counter uses (Use Classes Eg(iii), B2 & B8); (7) a multi-storey carpark (up to 6.5 storeys); (8) replacement sports pitch; along with associated uses including parking and landscaping
Status Approval
Application Type Outline Application
Appeal Decision N/A

Important Dates
Application Received Date 30/12/2024
Application Valid Date 03/04/2025
Consultation Start Date 09/01/2025
Site Visited / Site Notice Date
Consultation End 11/06/2025
Advert Expiry 03/05/2025
Committee Date (if applicable)
Committee Agenda
Decision Date 27/02/2026

Further Information
Expected Decision Level Delegated
Case Officer Ian Irwin
Parish Hindlip
Ward North Claines & Salwarpe Ward
Applicant Junction 6 Limited
Agent Mr Conor Layton, Turley
Agent Address 40 Queen Square, Bristol, BS1 4QP

Condition Details / Information Notes
Application for the approval of all reserved matters shall be made to the Local Planning Authority before the expiration of seven years from the date of this permission. The development hereby permitted shall be begun before the expiration of three years from the date of approval of the last of the reserved matters to be approved. Reason: In accordance with the requirements of Section 92 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
The development hereby approved shall be carried out in accordance with the following plans and drawings unless otherwise required by conditions attached to this planning permission: Application form; Location Plan, ref. A-010-001 Rev. P02, dated 31 March 2025; Existing Site Plan, ref. A-04-100 Rev. P06, dated 31 March 2025; Proposed Parameter Plan, ref. A-040-125 Rev. P02, dated 31 March 2025; Design and Access Statement Part 1, ref. 2023-202/PL/TL/MQ Rev. P02, dated December 2024; Design and Access Statement Part 2, ref. 2023-202/PL/TL/MQ Rev. P02, dated December 2024 Flood Risk Assessment & Drainage Strategy, ref. 2023-202-R-01 Rev. A, dated 19 December 2024; Hydraulic Modelling Study, ref. NRH-JBAU-XX-XX-RP-HM-0001-S03-P01, dated December 2024; Sequential Test (Flood Risk), ref. 225960 Rev. 2, dated 18 December 2024; Ecological Appraisal Part 1, ref. edp8796_r004a Rev. 004a, dated December 2024; Ecological Appraisal Part 2, ref. edp8796_r004a Rev. 004a, dated December 2024; Transport Assessment Addendum, ref. SSW-BWB-GEN-XX-RP-TR-005 Rev. P03, dated 27 May 2025; Proposed Access – Sports Pitches, ref. SSW-BWB-GEN-XX-DR-TR-0002-P1 Rev. P1, dated 25 April 2025; Travel Plan, ref. SSW-BWB-GEN-XX-RP-TR-003 Rev. P02, dated 18 December 2024; Lighting Strategy, ref. SWW-BWB-ZZ-XX-RP-E-0001 Rev. P02, dated 20 December 2024; Landscape and Visual Appraisal Part, ref. edp8796_r003b Rev. 003b, dated January 2025; Landscape and Visual Appraisal Part 1, ref. edp8796_r003a Rev. 003b, dated January 2025; Landscape and Visual Appraisal Part 2, ref. edp8796_r003a Rev. 003b, dated January 2025; Landscape and Visual Appraisal Part 3, ref. edp8796_r003a Rev. 003b, dated January 2025; Landscape and Visual Appraisal Part 4, ref. edp8796_r003a Rev. 003b, dated January 2025; Landscape and Visual Appraisal Part 5, ref. edp8796_r003a Rev. 003b, dated January 2025; Planning Statement, ref. 225960 Rev. 3, dated 23 December 2024; Air Quality Assessment, ref. SSW-BWB-XXZZ-LA-RP-0001_AQA Rev. P01.5, dated 20 December 2024; Noise Impact Assessment ref. SSW-BWB-ZZ-XX-RP-YA-0001 Rev. P01, dated December 2024; Phase 1 Geo-Environmental Assessment Part 1, ref. SSW-BWB-EGT-XX-RP-LE-0001_Ph1 Rev. P1, dated December 2024; Phase 1 Geo-Environmental Assessment Part 2, ref. SSW-BWB-EGT-XX-RP-LE-0001_Ph1 Rev. P1, dated December 2024; Phase 1 Geo-Environmental Assessment Part 3, ref. SSW-BWB-EGT-XX-RP-LE-0001_Ph1 Rev. P1, dated December 2024; Biodiversity Net Gain Statutory Metric Calculation dated 31 March 2025; Ecology Update Note, ref. edp8796_r008, dated April 2025; Geophysical Survey Report, dated February 2025. Reason: To ensure a satisfactory development and to avoid any ambiguity as to what constitutes the permission.
Approval of the details of the appearance, landscaping, layout and scale (hereinafter called "the reserved matters") shall be obtained from the Local Planning Authority in writing before any development is commenced. Reason: Required to be imposed pursuant to Section 92 of the Town and Country Planning Act 1990 (as amended) and to enable the Local Planning Authority to exercise proper control over these aspects of the development.
As part of the first reserved matters application made, a phasing plan shall be submitted which details the order in which the hereby approved development will be brought forward and constructed. Reason: To ensure a satisfactory development and to avoid any ambiguity as to what constitutes the permission.
Any reserved matters application shall accord with the Proposed Parameter Plan, ref. A-040-125 Rev. P02, dated 31 March 2025 in regard to the location of proposed uses and buildings and shall also not exceed building heights of those detailed upon this plan. Reason: To ensure a satisfactory development and to avoid any ambiguity as to what constitutes the permission.
Finished floor levels for buildings within the 1% plus climate change extent shall be set no lower than 600mm freeboard level above the 1% plus climate change flood level, in accordance with the Flood Risk Assessment, ref 2023-202-R-01 dated 19 December 2024. Reason: To protect the proposals from flood risk for the lifetime of the development.
Prior to the commencement of each phase of the hereby approved development, a scheme for flood storage compensation up to the 1% plus climate change extent shall be submitted to and approved in writing by the Local Planning Authority. Once approved the scheme shall be implemented in full prior to the commencement of the construction of that phase of the approved development and shall be retained to function as approved for the duration of the development. Reason: To reduce flood risk and provide flood risk betterment.
Prior to the commencement of each phase of the hereby approved development, a scheme for a surface water drainage strategy for that phase of the proposed development shall be submitted to and approved in writing by the Local Planning Authority. The strategy shall include details of surface water drainage measures, including for hardstanding areas, and shall conform with the non-statutory technical standards for SuDS (Defra 2015) and shall include the results of an assessment into the potential of disposing of surface water by means of a sustainable drainage system (SuDS). If possible, infiltration techniques are to be used and the plan shall include the details and results of field percolation tests. The scheme shall provide detailed design drawings for all drainage assets and should include run off treatment proposals for surface water drainage. Exceedance flows should not be directed to buildings or private land. If a connection to a sewer system is proposed, then evidence shall be submitted of the in-principle approval for this connection. Where the scheme includes surface water drainage assets proposals for dealing with the future maintenance of these assets should be included. The scheme should include proposals for informing future occupiers of the arrangements for maintenance of surface water drainage assets. The approved surface water drainage scheme shall be implemented prior to the first use of that phase and thereafter maintained in accordance with the agreed maintenance scheme. Reason: To ensure that the development is properly drained, avoiding flood risk and pollution in accordance with Policies SWDP 28, 29 & 31 of the South Worcestershire Development Plan.
Prior to the commencement of each phase of the development, a construction surface water management plan shall be submitted to and approved in writing by the Local Planning Authority. The plan shall include how surface water will be managed during the construction phase, including site clearance, soil stripping and pond amendments. The plan shall include drawings of any temporary drainage systems, a timeline of construction and measures to mitigate the risk of pollution (including silt) of the water environment and offsite flood risk. The plan shall detail how the approved permanent surface water drainage system shall be remediated during the construction phase. The approved construction surface water management plan shall be implemented as soon as works start on site for each phase as approved and thereafter maintained during the full duration of the construction of that phase. Reason: To ensure that the development is properly drained, avoiding flood risk and pollution in accordance with Policies SWDP 28, 29 & 31 of the South Worcestershire Development Plan.
Prior to the commencement of each phase of the development, details for the disposal of foul water and surface water flows shall be submitted to the Local Planning Authority for written approval. The details approved shall then be adhered to in full and be fully implemented prior to the development within that phase being first brought into use. Reason: To ensure that the development is provided with a satisfactory means of drainage as well as reduce the risk of creating or exacerbating a flooding problem and to minimise the risk of pollution.
No above ground works shall commence within the first phase of development, in accordance with details submitted and required by condition 4, until a Biodiversity Gain Plan has been submitted to and approved in writing by the Local Planning Authority. The Biodiversity Gain Plan shall be fully implemented and adhered to as well as maintained in accordance with the Habitat Management and Monitoring Plan (HMMP) as required by Condition 12. Reason: To ensure that the proposed development delivers a biodiversity net gain in accordance with Schedule 7A of the Town and Country Planning Act 1990 and SWDP22 of the South Worcestershire Development Plan.
No above ground works within each phase of the hereby approved development shall commence until a Habitat Management and Monitoring Plan (the HMMP), has been prepared in accordance with the approved Biodiversity Gain Plan as required by Condition 11 and the landscape scheme as required by condition 3. The HMMP shall be submitted to and approved in writing by the Local Planning Authority. It shall include but not be limited to: (a) a non-technical summary; (b) description and evaluation of features to be managed; (c) the roles and responsibilities of the people or organisation(s) delivering the HMMP; (d) the planned habitat creation and enhancement works to create or improve habitat to achieve the biodiversity net gain in accordance with the approved Biodiversity Gain Plan; (e) the management measures to maintain habitat in accordance with the approved Biodiversity Gain Plan for a period of 30 years from the completion of development; (f) Aims and objectives of management; and appropriate management options for achieving aims and objectives, including but not restricted to the management measures to maintain habitat in accordance with the approved Biodiversity Gain Plan for a period of 30 years from the completion of development; (g) Prescriptions for management actions and preparation of a work schedule, including an annual work plan capable of being rolled forward over a five-year period and for a minimum of 30 years thereafter; and (h) the monitoring methodology and frequency in respect of the created or enhanced habitat to be submitted to the local planning authority. Notice in writing shall be given to the Council when the habitat creation and enhancement works as set out in the HMMP have been completed. The created and enhanced habitat specified in the approved HMMP shall thereafter be managed and maintained in accordance with the approved HMMP. Monitoring reports shall be submitted to the local planning authority in writing in accordance with the methodology and frequency specified in the approved HMMP. The plan shall also set out where the results of the monitoring show that conservation aims and objectives of the HMMP are not being met, how contingencies and/or remedial action are identified, agreed and implemented so that the development still delivers the fully functioning biodiversity objectives of the originally approved scheme. Once the HMMP is approved it shall be implemented in full accordance with those approved details. Reason: To ensure the development delivers a biodiversity net gain on site in accordance with Schedule 7A of the Town and Country Planning Act 1990 as well as ensuring that the proposal harmonises with the surroundings in accordance with policies SWDP21, SWDP22 and SWDP25.
The landscaping scheme to be submitted in accordance with each reserved matters as required by condition 3 of this permission shall include details of all soft and hard landscaping and shall also include but not be limited to details of screen walls, fences, surface treatments to all areas, footways, cycleways, signage including way and distance markers, lighting, public seating, litter facilities. Details submitted shall also include; a) a plan(s) showing the planting layout of proposed tree, hedge, shrub and grass areas; b) a schedule of proposed planting – indicating species, size at time of planting and numbers/densities of plants; c) a written specification outlining cultivation and other operations associated with plant and grass establishment; d) a schedule of maintenance, including watering and the control of competitive weed growth, for a minimum period of five years from first planting. The planting shall be carried out concurrently with the development and a timetable shall be submitted prior to any above ground works commencing for written approval for its full completion. If within a period of 5 years from the date of the planting of any tree planted, that tree or any tree planted in replacement for it, is removed, uprooted or destroyed or dies, or becomes, in the opinion of the Local Planning Authority, seriously damaged or defective, another tree of the same species and size as that originally planted shall be planted at the same place. All species proposed for planting shall be non-invasive native species. Once approved, those details shall be implemented in full. Reason: To ensure the proposed development does not have an adverse effect on the character and appearance of the area in accordance with policies SWDP21 and SWDP25 of South Worcestershire Development Plan.
No above ground works shall commence within any phase as set out by details submitted to comply with condition 4 of the development hereby approved, until a written planting specification has been submitted to and approved in writing by the Local Planning Authority. This shall include preparatory groundworks, plant handling and all other operations associated with successful tree, plant, and grass establishment and be in accordance with. BS 4428 (1989) - Code of practice for general landscape operations and BS 8545 (2014) - Trees from nursery to independence in the landscape - recommendations. Once approved the development shall be carried out in full accordance with the approved details. Reason: To ensure the environment of the development is improved and enhanced and does not have an adverse effect on the character and appearance of the area, in accordance with Policies SWDP21 and SWDP25 of the South Worcestershire Development Plan.
Prior to the commencement of each phase of the development where trees are present, details of tree protection measures (tree protection plan) shall be provided to the local planning authority. Tree protection measure should be in accordance with BS 5837:2012 (Trees in Relation to Design, Demolition and Construction). Before development of any type commences, including site clearance, demolition, materials delivery, vehicular movement and erection of site huts, the approved tree protection measures will be implemented. The approved tree protection measures shall remain in place until the completion of the phase of development as approved. Reason: To prevent existing trees/hedges from being damaged during construction work and to preserve the amenities of the locality in accordance with policies SWDP21 and SWDP25 of the South Worcestershire Development Plan.
No development within any phase as defined by condition 4 of this permission shall take place (including demolition, ground works, vegetation clearance) until a biodiversity construction environmental management plan (CEMP) (Biodiversity) has been submitted to and approved in writing by the local planning authority. The CEMP (Biodiversity) shall include mitigation measures as referred to within the Ecological Appraisal, ref. edp8796.r004a, dated December 2024 Table EDP 6.1 as well as but not be limited to the following: a) Risk assessment of potentially damaging construction activities. b) Details (type and location) of wildlife boxes and refugia/hibernacula and other areas/ measures to provide compensation and enhancements for wildlife and protected species. c) Identification of "biodiversity/ecological protection zones". d) Arboricultural Method Statement including tree protection measures. e) Practical measures (both physical measures and sensitive working practices) to avoid or reduce impacts during construction (these should include working method statements for reptiles, nesting birds, otters, badgers, bats and retained hedgerows and trees) f) The location and timing of sensitive works to avoid harm to biodiversity features. g) The times during construction when specialist ecologists need to be present on site to oversee works. h) Responsible persons and lines of communication. i) The role and responsibilities on site of an ecological clerk of works (Ecological Clerk of Works) or similarly competent person. j) Use of protective fences, exclusion barriers and warning signs including for any waterway to ensure that they are appropriately safeguarded. The approved CEMP (Biodiversity) shall be adhered to and implemented throughout the construction period of the phase and strictly in accordance with those approved details. Reason: To ensure the development contributes to the conservation and enhancement of biodiversity within the site and the wider area in accordance with policy SWDP22 of the South Worcestershire Development Plan.
Each phase of the hereby approved development shall not commence until a Construction Environmental and Traffic Management Plan has been submitted to and approved in writing by the Local Planning Authority. This shall include but not be limited to the following: • Clear and detailed measures to prevent debris, mud and other detritus on the public highway including the strategic road network including wheel washing facilities and their location on site during construction works; • Details of site operative parking areas, material storage areas and the location of site operatives’ facilities offices and toilets as well as any other proposed facilities; • An HGV routing plan to include likely origin/destination information, potential construction vehicle numbers, construction traffic arrival and departure times, signage, accesses and construction delivery times to avoid peak hours and match days; • Details of any special or abnormal deliveries or vehicular movements; • The hours that delivery vehicles will be permitted to arrive and depart, and arrangements for unloading and manoeuvring; • Measures to ensure that noise, dust and vibration are appropriately monitored and mitigation measures to be proposed to manage these issues including dust suppression measures including a detailed specification of plant and equipment to be used; • A litter prevention and waste management measures plan; • Detailed measures to demonstrate that appropriate pollution controls are in place to prevent any spillages spreading onto adjacent land and watercourses including in any potential flood event; • Detailed measures as to how the works will ensure safe evacuation of the site in the event of flood; • A description of management responsibilities including contact details of the site manager during construction works; • Details of any protection measures as may be required for hedgerows and grasslands; • A description of the construction programme and phasing plan; • Communication procedures with the LPA and local community regarding key construction issues - newsletters, fliers etc; • Details of temporary/construction lighting to include lux levels; light spill plans and light spill mitigation measures, hours of use; areas where lighting is to be avoided; measures taken to protect areas of blue and green infrastructure corridors and the species that may use them; The measures set out in the approved Plan shall be carried out and complied with in full during the construction of the development hereby approved. Site operatives' parking, material storage and the positioning of operatives' facilities shall only take place on the site in locations as submitted and approved. Reason: To ensure the provision of adequate on-site facilities and in the interests of highway safety.
Prior to the installation of any external lighting within each phase of the development as set out by the details submitted as per condition 4 of this permission, details of a "lighting design strategy for biodiversity" shall be submitted to the Local Planning Authority for written approval. The strategy shall be approved in writing by the local planning authority and once approved implemented in full. The strategy shall include but not be limited to: a) identify those areas/features on site that are particularly sensitive for bats and other identified species that may be sensitive to lighting proposals and that are likely to cause disturbance in or around their breeding sites and resting places or along important routes used to access key areas of their territory, for example, for foraging; and b) show how and where all external lighting will be installed (through the provision of appropriate lighting contour plans both vertical and horizontal as well as technical specifications, including colour temperature, along with any further mitigation measures identified as necessary) so that it can be clearly demonstrated that areas to be lit will not disturb or prevent the above identified species using their territory or having access to their breeding sites and resting places. c) the hours of use of the lighting as proposed. All external lighting shall be installed in accordance with the specifications and locations set out in the strategy, and these shall be maintained thereafter in accordance with the strategy. No external lighting shall be installed within any phase without having first demonstrated how said lighting will be implemented in line with this condition and received formal written approval for those proposals. Reason: To ensure the development contributes to the conservation and enhancement of biodiversity within the site and the wider area, in the interests of residential amenities and to protect the sites landscape setting in accordance with policies SWDP21, SWDP22 and SWDP25 of the South Worcestershire Development Plan.
A bat roosting assessment shall be submitted as part of any phase of the development proposed where that phase contains trees with bat roosting potential as per appendix 5 of the Ecological Appraisal ref. edp8796_r004a Rev. 004a, dated December 2024, to help inform the final design proposals and ensure that any existing roosting arrangements are identified. The assessment shall be submitted prior to the commencement of development within that phase and ensure all potential roosting features and areas are assessed and include identified mitigation measures as considered necessary and be used to help inform the HMMP as required by condition 12 and implemented accordingly. Reason: To ensure the development contributes to the conservation and enhancement of biodiversity within the site and the wider area in accordance with policy SWDP22 of the South Worcestershire Development Plan.
Prior to the commencement of each phase of the development, details of renewable and/or low carbon energy generation measures shall be submitted to and approved in writing by the Local Planning Authority. The measures shall contribute to at least 10% of the predicted energy requirements of the phase. The details to be submitted shall include:- • the overall predicted energy requirements of the phase as set out in condition 4; • the predicted energy generation from the proposed renewable/low carbon energy measures; • The location of the proposed equipment to provide the renewable and/or low carbon energy generation, along with any technical assessments considered necessary to support the location proposed; and • an implementation timetable for the proposed measures. The development shall then be carried out in accordance with the approved details and implemented prior to the occupation of each phase of the hereby approved development. Reason: To ensure the development supports the delivery of low carbon/renewable energy in accordance with Policy SWDP 27.
(A) No development shall take place within each phase of the development until a programme of archaeological work, including a Written Scheme of Investigation, has been submitted to and approved by the local planning authority in writing. The scheme shall include an assessment of significance and research questions; and: 1) The programme and methodology of site investigation and recording. 2) The programme for post investigation assessment. 3) Provision to be made for analysis of the site investigation and recording. 4) Provision to be made for publication and dissemination of the analysis and records of the site investigation. 5) Provision to be made for archive deposition of the analysis and records of the site investigation. 6) Nomination of a competent person or persons/organisation to undertake the works set out within the Written Scheme of Investigation. (B) Each phase shall not commence until the site investigation has been completed, within 6 months of occupation of the phase the post investigation assessment shall be completed in accordance with the programme set out in the Written Scheme of Investigation approved under condition (A) and the provision made for analysis, publication and dissemination of results and archive deposition has been secured. Reason: In accordance with the requirements of paragraphs 207 and 218 of the National Planning Policy Framework (as amended) and SWDP 6 & 24 of the South Worcestershire Development Plan 2016.
Within 3 years of the first occupation of the light industrial and trade counter uses (Use Classes Eg(iii), B2 & B8) on the location of the existing training pitch, the replacement pitch shall be delivered and made available for use including agreed details of pedestrian access in accordance with the details to be set out under Condition 23. Once the pedestrian access arrangements are approved and the replacement pitch is delivered and made available, the pitch and pedestrian access arrangements shall remain available for use for the duration of the hereby approved development. Reason: To ensure that appropriate playing field provision is made available and accessible to replace that which shall be lost by the wider development as per the NPPF.
Prior to the commencement of any development in relation to the proposed light industrial and trade counter and upon the location of the existing training pitch, a detailed ground assessment of the proposed replacement pitch location shall be submitted to the Local Planning Authority for approval. The submission should comprise the following: i. A detailed assessment of ground conditions (including drainage and topography) of the land proposed for the playing field which identifies constraints which could adversely affect playing field quality; ii. Where the results of the assessment to be carried out pursuant to (i) above identify constraints which could adversely affect playing field quality, a detailed scheme to address any such constraints; and iii. Details of how pedestrian access will be achieved to the replacement training pitch location and maintained as available for the duration of the development. The scheme shall include a written specification of the proposed soil’s structure, proposed drainage, cultivation and other operations associated with grass and sports turf establishment and a programme of implementation. The approved scheme shall be carried out in full and in accordance with the approved programme of implementation. The land shall thereafter be maintained in accordance with the scheme and made available for playing field use in accordance with the scheme for the duration of the approved development. Reason: To ensure that the playing field is prepared to an adequate standard and is fit for purpose and to accord with Development Plan Policy.
Prior to the use of the hereby approved replacement training pitch commencing a schedule of playing field maintenance including a programme for implementation for a minimum period of five years starting from the commencement of use of the pitch shall be submitted to and approved in writing by the Local Planning Authority after consultation with Sport England. Following the commencement of use of the replacement pitch the approved schedule shall be complied with in full. Reason: To ensure that the replacement pitch is maintained to ensure it achieves an adequate standard and is fit for purpose and future use.
Prior to the commencement of each phase of the hereby approved development, no works, other than that which may be required to be carried out as part of an approved scheme of remediation, must commence until parts 1 to 5 of this condition have been complied with: 1. A preliminary risk assessment (a Phase I desk study) submitted to the Local Authority in support of the application has identified unacceptable risk(s) exist on the site as represented in the Conceptual Site Model. The preliminary risk assessment (Phase I desk study) must be approved in writing by the Local Planning Authority prior to the commencement of development in each phase. A scheme for detailed site investigation must be submitted to and approved in writing by the Local Planning Authority prior to being undertaken to address those unacceptable risks identified by the preliminary risk assessment. The scheme must be designed to assess the nature and extent of any contamination and must be led by the findings of the preliminary risk assessment. The investigation and risk assessment scheme must be compiled by competent persons and must be designed in accordance with the Environment Agency's "Land Contamination: Risk Management" guidance. 2. Subject to the conclusions of the preliminary risk assessment and if required, the detailed site investigation and risk assessment must then be undertaken in accordance with the approved Scheme and a written report of the findings produced. This report must be approved by the Local Planning Authority prior to any development taking place. 3. Where the site investigation identified remediation is required, a detailed remediation scheme to bring the site to a condition suitable for the intended use by removing unacceptable risks to identified receptors must be prepared and is subject to the approval of the Local Planning Authority in advance of undertaking. The remediation scheme must ensure that the site will not qualify as Contaminated Land under Part 2A Environmental Protection Act 1990 in relation to the intended use of the land after remediation. 4. The approved remediation scheme must be carried out in accordance with its terms prior to the commencement of development, other than that required to carry out remediation, unless otherwise agreed in writing by the Local Planning Authority. 5. Following the completion of the measures identified in the approved remediation scheme a validation report that demonstrates the effectiveness of the remediation carried out must be produced and is subject to the approval of the Local Planning Authority prior to the occupation of any buildings. 6. In the event that contamination is found at any time when carrying out the approved development that was not previously identified it must be reported in writing immediately to the Local Planning Authority. An investigation and risk assessment must be undertaken and where necessary a remediation scheme must be prepared, these will be subject to the approval of the Local Planning Authority. Following the completion of any measures identified in the approved remediation scheme a validation report must be prepared, which is subject to the approval in writing of the Local Planning Authority prior to the occupation of any of the hereby approved buildings. Reason: To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors.
Prior to the proposed relocated sports pitch being brought into use, the proposed Pershore Lane access as generally shown on the Proposed Access – Sports Pitches, ref. SSW-BWB-GEN-XX-DR-TR-0002-P1 Rev. P1, dated 25 April 2025 plan shall be constructed and made available for use. Reason: To ensure conformity with submitted details.
Prior to the hereby approved relocated sports pitch being brought into use visibility splays are to be provided at the vehicular access from Pershore Lane serving the relocated sports pitch from a vertical point 1.05m above carriageway level at the centre of the application main site access and 2.4m back from the near side edge of the adjoining carriageway, for 116m northwards and 134m southwards, respectively, measured along the nearside edge of the adjoining carriageway (vertical off set of 0.6m). Nothing shall be planted, erected and/or allowed to grow above 0.6m on the triangular areas of land so formed which would obstruct the visibility described above for the duration of the development. Reason: In the interests of highway safety.
No phase of the development hereby approved shall not commence until a Street Lighting Assessment report has been submitted to and approved in writing by the Local Planning Authority, in discussion with the Local Highway Authority. The Assessment shall consider the following:- • The need or not for public highway street lighting in the vicinity of the new vehicular access. • Any proposed development lighting within the site and its justification. • The environmental impact of any proposed site lighting, be it on the public highway or within private land, particularly in relation to protected species. Where the approved Assessment identifies that street lighting and/or lighting mitigation is required, the relevant phase shall not be first brought into use until the lighting has been installed/implemented in accordance with details first submitted to and approved in writing by the Local Planning Authority (in consultation with the Local Highway Authority), and it shall thereafter be retained and maintained as approved. Reason: To ensure the adequate provision of street lighting in the interests of highway safety.
Each phase of the hereby approved development shall not be first occupied until details of car parking to comply with the Council’s adopted car parking standards has been provided in accordance with details which shall first be submitted to and approved in writing by the Local Planning Authority. Reason: To comply with the Council’s parking standards.
Prior to the commencement of construction of any proposed noise-sensitive receptor buildings, including the hotel, medical centre, and office spaces, an Acoustic Design Report shall be submitted to and approved in writing by the Local Planning Authority. The report shall demonstrate compliance with the internal and external noise criteria of BS 8233:2014 and WHO guidelines for community noise. Reason: To protect the amenities of adjoining/nearby buildings and the local area and to ensure quality design in accordance with policy SWDP21 of the South Worcestershire Development Plan.
Prior to the construction of the proposed hotel, drive thru and north stand, details of the commercial kitchen ventilation systems proposed to be installed shall be submitted to the Local Planning Authority for written approval. The systems provided shall be proposed in line with the Defra/EMAQ+ 'Guidance Control of Odour and Noise from Commercial Kitchen Exhaust Systems', including fume and odour mitigation and an odour risk assessment (Appendix 3 of the guidance). Once approved, the details shall be implemented in full before the occupation of each of the buildings to receive the ventilation systems. Reason: To protect the amenities of adjoining/nearby buildings and the local area and to ensure quality design in accordance with policy SWDP21 of the South Worcestershire Development Plan.
Prior to the occupation of each phase of the hereby approved development located within the 1% plus climate change extent, a Flood Warning and Evacuation Plan shall be submitted to the Local Planning Authority for written approval. The plan should include, but not be limited to, how flood risk would be monitored, the flood level where evacuation of people and vehicles would be initiated along with how it would be identified to permit re-occupation of the buildings and site if an evacuation was initiated. Reason: To ensure a robust and planned response in the event of a flood event.
Each phase of development as set out by condition 4 shall not be first occupied until sheltered and secure cycle parking with separate provision for both staff and visitors to the site to comply with the Council’s adopted highway design guide has been provided in accordance with details which shall first be submitted to and approved in writing by the Local Planning Authority and thereafter the approved cycle parking shall be kept available for the parking of bicycles only. Reason: In the interests of promoting sustainable transport methods.
Each phase of the development hereby approved shall not be brought into use until Employment Travel Plan(s) related to that phase has been submitted to and approved in writing by the Local Planning Authority. Reason: To ensure staff and visitors of the development site are offered a genuine choice of sustainable travel modes and to promote sustainable access to the development site.
Each phase of the development hereby approved shall not be first occupied until the Applicant has submitted to and had approval in writing from the Local Planning Authority an employment Travel Welcome Pack promoting sustainable forms of access for that phase. The pack shall be provided to each employee upon commencement of working on site. Reason: To ensure employees of the development site are offered a genuine choice of sustainable travel modes and to promote sustainable access to the development site.
Noise from any fixed plant and equipment associated with the development shall not exceed the background noise level (LA90) as a rating level during the daytime (0700- 2300) and night-time (2300-0700) when measured or calculated at the façade of the nearest noise sensitive building in accordance with BS 4142:2014+A1:2019. Reason: To protect the amenities of adjoining/nearby buildings and the local area and to ensure quality design in accordance with policy SWDP21 of the South Worcestershire Development Plan.
Foul and surface water shall be drained on separate systems at all times for the duration of the development. Reason: To secure proper drainage and to manage the risk of flooding and pollution.
No demolition or construction works shall take place outside the hours of: 07:30-18:00 Monday to Friday; 08:00-13:00 Saturday; and No Activity on Sundays or Bank or Public Holidays Reason: In the interests of the amenity of the area.
The hereby approved Padel Centre shall only be in use between the hours of 06.30 and 23.00 each day and when not in use any lighting associated with the illumination of the courts shall be extinguished. Reason: In the interests of the landscape setting of the area.
This decision notice grants planning permission only. It does not override any existing legal agreement, covenant or ownership arrangement. It is the applicant’s responsibility to ensure all necessary agreements/consents are in place prior to the commencement of development and to take appropriate advice thereon if required.
Positive and Proactive Statement. In dealing with this application, the Council has worked with the applicant in the following ways: - provided opportunity for the scheme to be amended during determination; In such ways the Council has demonstrated a positive and proactive manner in seeking solutions to problems arising in relation to the planning application.
In the event that any protected species are discovered on site during construction works, works should cease and a qualified ecologist contacted for advice. Protected Species are protected under the 1981 Wildlife and Countryside Act and the Habitat Regulations 1994 and it is an offence to recklessly disturb or harm them.
New development built structures and/or storage of materials should ordinarily be set at least 8 metres from the top of a bank of a Main River. This is to assist in operational management and maintenance, to help improve flood flow and conveyance, and in the interest of biodiversity. This allows Environment Agency operatives to access the main river under their permissive powers to maintain the watercourse and for the landowner to undertake their responsibilities as the riparian owner of their length of bank, please see: Owning a watercourse - GOV.UK. Based on the scale and nature of the proposed development and without prejudice to any FRAP, which may be required in this instance, we would offer the following comments at this time. We highlight the following with regard to works during the course of ongoing site development. In addition to obtaining planning permission, any works, in, over or under, or within 8 metres of the top of the bank of any Main River may require a FRAP from us under the Environmental Permitting (England and Wales) Regulations 2016. We recommend the applicant contact our area Partnerships & Strategic Overview (PSO) Team at pso.midswest@environment-agency.gov.uk to discuss this further. For further advice please see: Flood risk activities: environmental permits - GOV.UK. Please note the riparian owner is responsible for the maintenance of their length of bank, as appropriate.
A pylon and overhead power lines are located upon and across the site and any reserved matters application(s) will need to ensure that appropriate stand-offs are maintained from any of the proposed structures approved as part of this permission from these features at the detailed design stage.
The applicant is advised to contact the Canal & River Trusts Infrastructure Services Team to discuss which elements of the proposal should comply with the Trusts’ ‘Code of Practice for works affecting the Canal & River Trust’, details of which can be found at www.canalrivertrust.org.uk/business-and-trade/undertaking-works-on-our-property-and-our-code-of-practice”
The applicant is requested to contact Jeff Peake, Estates Surveyor with the Canal & River Trust, by email to jeff.peake@canalrivertrust.org.uk to discuss the existing bridge over the Worcester & Birmingham canal which links the two sites.
With regard to network capacity, this response only relates to the public wastewater network and does not include representation from other areas of Severn Trent Water, such as the provision of water supply or the protection of drinking water quality. NOTE: we would strongly recommend the Developer/Applicant to make contact with STW and look to submit a Development Enquiry for this development site; this will discuss the drainage proposals for site, and if any issues, look to resolve them. It is best to visit our website: https://www.stwater.co.uk/building-and-developing/overview/new-site-developments/developer-enquiries/ and follow the application form guidance to begin this process.
Please note for the use or reuse of sewer connections either direct or indirect to the public sewerage system the applicant will be required to make a formal application to the Company under Section 106 of the Water Industry Act 1991. They may obtain copies of our current guidance notes and application form from either our website (www.stwater.co.uk) or by contacting our Developer Services Team (Tel: 0800 707 6600).
Before undertaking any work on site, all applicants must determine if Severn Trent has any assets in the vicinity of the proposed works. This can be done by accessing our records at www.digdat.co.uk Severn Trent Water advise that even if our statutory records do not show any public sewers within the area you have specified, there may be sewers that have been recently adopted under The Transfer of Sewer Regulations 2011. Our records indicate that there are no assets that may be affected by this proposal, however it is the duty of the site owner to confirm this is the case before any work takes place. Public sewers and Water mains have statutory protection and may not be built close to, or diverted without consent, consequently you must contact Severn Trent Water to discuss your proposals. Severn Trent will seek to assist you obtaining a solution which protects both the public sewer and the proposed building.
Please note that any proposals to alter existing, or construct new, culverts or carry out works in or on an ordinary watercourse will need Land Drainage Consent under s.23; Land Drainage Act 1991 from SWLDP. Such consent will need to be granted prior to works commencing on site as consent cannot be granted retrospectively. Failure to comply may result in enforcement action being taken by the Lead Local Flood Authority, Worcestershire County Council, under the Act. SWLDP may also exercise powers to require works for maintaining flow of a watercourse where appropriate under s.25 of the Act where the proper flow of water is impeded.
The applicant should be aware that polluting the nearby watercourse, for instance by allowing the discharge of sediment rich runoff from the construction site, might constitute an environmental offence. The applicant is expected to fully assess the risks from all pollution sources and pathways and take sufficient precautionary measures to mitigate these risks for this development
Proper watering is key to the successful establishment of newly planted trees. Water around the base of the tree regularly, ensuring the soil is moist but not soggy. Underwatering can stress a tree, leading to its poor health and potentially death. Water often, adjusting for rainfall. Consistent hydration during the first three growing seasons (March to September) encourages strong root growth and helps a young tree thrive. Early watering effort leads to successful establishment and to a self-sustaining healthy, resilient tree in the future.
The applicant is advised that the scheme should comply with the relevant industry Technical Guidance, including guidance published by Sport England, National Governing Bodies for Sport. Particular attention is drawn to ‘Natural Turf for Sport’, (Sport England, 2025).
The granting of this planning permission does not remove any obligations on the Applicant to undertake a technical design check of any proposed highway works with the Highway Authority, nor does it confirm acceptance of the proposal by the Highway Authority until that design check process has been concluded. Upon the satisfactory completion of the technical check, the design would be suitable to allow conditions imposed under this permission to be discharged but works to the public highway cannot take place until a legal agreement under Section 278 of the Highways Act 1980 has been entered into and the Applicant has complied with the requirements of the Traffic Management Act 2004. The Applicant is urged to engage with the Highway Authority as early as possible to ensure that the approval process is started in a timely manner to achieve delivery of the highway works in accordance with the above-mentioned conditions. The Applicant should be aware of the term “highway works” being inclusive of, but not limited to, the proposed junction arrangement, street lighting, structures, and any necessary traffic regulation orders.
Drainage arrangements shall be provided to ensure that surface water from any private driveway and/or vehicular turning area does not discharge onto the public highway. No drainage or effluent from the proposed development shall be allowed to discharge into any highway drain or over any part of the public highway.
It is expected that contractors are registered with the Considerate Constructors scheme and comply with the code of conduct in full, but reference is made to "respecting the community" this says:- Constructors should give utmost consideration to their impact on neighbours and the public • Informing, respecting, and showing courtesy to those affected by the work. • Minimising the impact of deliveries, parking, and work on the public highway. • Contributing to and supporting the local community and economy. • Working to create a positive and enduring impression and promoting the Code. The CTMP should clearly identify how the principal contractor will engage with the local community; this should be tailored to local circumstances. Contractors should also confirm how they will manage any local concerns and complaints and provide an agreed Service Level Agreement for responding to said issues. Contractors should ensure that courtesy boards are provided and information shared with the local community relating to the timing of operations and contact details for a site coordinator in the event of any difficulties. This does not offer any relief to obligations under existing Legislation.
WCC has published guidance on how it expects travel plans to be prepared, this guidance is freely available from the County Council’s Travel Plans Officer.
To determine the safety and requirement to light, the developer shall contact WCC Street Lighting to retrieve a feasibility report template and request existing lighting asset information. The report shall be completed and all documents requested within the template provided to WCC for approval.

Copyright Notice

Plans, drawings and material submitted to the council are protected by the copyright acts (section 47, 1988 act). You may only use material which is downloaded and/or printed for consultation purposes, to compare current applications with previous schemes and to check whether developments have been completed in accordance with approved plans. Further copies must not be made without the prior permission of the copyright owner.

Tick here to show you have read and agree with the Copyright Notice.

Document Download Tips

  • In order to view the documents please ensure you have ticked the Copyright Notice box above.
  • In order to view PDF documents, you will need to have the free Adobe Acrobat Reader software installed on your computer. Click here to download.
  • To view individual documents click on the 'Document Type' on the row you require and the document will open as an Adobe Acrobat pdf.
  • To download multiple documents in one go, tick all the boxes relating to the documents you wish to view and click Download selected files button.
  • If you wish to download ALL documents place a tick in the box in the header row and click 'Download Selected Files' button.
  • Note: some devices such as iPads that use iOS browsers do not have the standard capability to download multiple files as a default function. If you are experiencing difficulties you may need to download a free application to enable you to do this - known as a zip file. Go to the AppStore to download a zip file ‘app’.

How to reorder or group rows

Click on a column heading for the ability to sort the ‘group’ listing in ascending or descending order by using the up/down arrows. This is useful to sort by ‘name/organisation’.

Document Type Date Description File Size Drawing/Rev Number
Application Documents
Application Plans
Neighbour and Other Response
Statutory Consultee Response
Decision
System Generated Letter
Planning Application Documents

Consultation Responses

Neighbour List


In addition to consultations with the consultee listed, we will publicise the application in accordance with national requirements and our local policy. This publicity usually takes the form of letters to nearby properties, the posting of site notices and/or the placing of a public notice in our local newspapers.


Address Sent Reply Received
The Cottage Church Lane Himbleton DROITWICH SPA WR9 7LG 22/10/2025
69 Carter Lane London, EC4V 5EQ 19/03/2025
The Civic Centre Queen Elizabeth Drive PERSHORE WR10 1PT 15/04/2025
The Forge Woodfields DROITWICH SPA WR9 8LZ 05/11/2025
The Stables, Woodbury Farm Bank Road Little Witley Worcester WR6 6LR 05/11/2025
Treetops Green Lane Bevere WORCESTER WR3 7QF 21/10/2025
Orchard House 31 Station Road Fernhill Heath WORCESTER WR3 7UJ 22/10/2025
25 Montreal Close Lower Wick Worcester 23/10/2025
70 Structons Heath Great Witley WR6 6JA 14/01/2025
Hfd & Worcs Fire and Rescue Service Hindlip Park Worcester 14/05/2025
David Lloyd Warriors Way Hindlip WORCESTER WR3 8ZF 09/01/2025
Ringway Highway Services Ltd Warndon Highways Depot Pershore Lane Hindlip WR3 8SU 09/01/2025
Warndon Highways Depot Pershore Lane Hindlip WORCESTER WR3 8SU 09/01/2025
Worcestershire County Council Maintenance Depot Warndon Highways Depot Pershore Lane Hindlip WR3 8SU 09/01/2025
Worcestershire County Council Workshop And Premises Warndon Highways Depot Pershore Lane Hindlip WR3 8SU 09/01/2025
Cummins Farm Hindlip Lane Hindlip WORCESTER WR3 8ST 09/01/2025
Maxway Second Cottage Pershore Lane Hindlip WORCESTER WR3 8SU 09/01/2025
Pumphouse Cottage Pershore Lane Hindlip WORCESTER WR3 8SU 09/01/2025

Consultee List


Name Organisation Sent Reply Due Reply Received
Aidan Smyth WDC - Archaeology & Planning Advisor 09/01/2025 30/01/2025 20/03/2025
Asset Protection Team Severn Trent Water Limited 09/01/2025 30/01/2025 30/01/2025
Canal & River Trust Spatial Planning Team Canal & River Trust 09/01/2025 30/01/2025 30/01/2025
Cllr Daniel Birch North Claines & Salwarpe Ward 09/01/2025 30/01/2025
Cllr Nicolas Wright North Claines & Salwarpe Ward 09/01/2025 30/01/2025
Delegated Commissioning Team NHS Herefordshire & Worcs Integrated Care Board 09/01/2025 30/01/2025
Drainage Engineer Engineers - S.W. Land Drainage Partnership 09/01/2025 30/01/2025 17/01/2025
Duncan Rudge - Head of Planning Worcester City Council (Planning) 09/01/2025 30/01/2025
Emma Ridley Economic Development Officer 09/01/2025 30/01/2025 15/01/2025
Environment Agency West Area Planning 09/01/2025 30/01/2025
Highways County Highways 09/01/2025 30/01/2025 13/10/2025
Landscape Officer WDC Landscape Officer 09/01/2025 30/01/2025 14/01/2025
Matt Barker MHDC & WDC Carbon Reduction Project Officer 09/01/2025 30/01/2025
Midlands Region National Highways 09/01/2025 30/01/2025 29/01/2025
Mr R Cooper Hereford & Worcester Fire Service 09/01/2025 30/01/2025 10/01/2025
Mr S Bloomfield Worcestershire Wildlife Trust 09/01/2025 30/01/2025
Mrs E Gallagher Hindlip Parish Council 09/01/2025 30/01/2025 17/02/2025
Mrs H Fleming Natural England 09/01/2025 30/01/2025 16/01/2025
Ms R Clare Environment Agency 09/01/2025 30/01/2025 31/01/2025
Policy Plans - General Policy Plans - General 09/01/2025 30/01/2025 04/02/2025
Tree Preservation Officer WDC Tree Preservation Officer 09/01/2025 30/01/2025
WCC LLFA Planning Consultation WCC Lead Local Flood Authority 09/01/2025 30/01/2025
WDC Heritage Officer WDC Heritage Officer 09/01/2025 30/01/2025 26/02/2025
WDC Natural Heritage & Biodiversity Officer WDC Natural Heritage & Biodiversity 09/01/2025 30/01/2025
Worcestershire Regulatory Services - Cont. Land Worcestershire Regulatory Services 09/01/2025 30/01/2025 19/01/2025
Worcestershire Regulatory Services - Nuisance Worcestershire Regulatory Services 09/01/2025 30/01/2025 14/01/2025
Aidan Smyth WDC - Archaeology & Planning Advisor 04/04/2025 25/04/2025
Asset Protection Team Severn Trent Water Limited 04/04/2025 25/04/2025
Canal & River Trust Spatial Planning Team Canal & River Trust 04/04/2025 25/04/2025
Cllr Daniel Birch North Claines & Salwarpe Ward 04/04/2025 25/04/2025
Cllr Nicolas Wright North Claines & Salwarpe Ward 04/04/2025 25/04/2025
Delegated Commissioning Team NHS Herefordshire & Worcs Integrated Care Board 04/04/2025 25/04/2025
Drainage Engineer Engineers - S.W. Land Drainage Partnership 04/04/2025 25/04/2025
Duncan Rudge - Head of Planning Worcester City Council (Planning) 04/04/2025 25/04/2025
Emma Ridley Economic Development Officer 04/04/2025 25/04/2025
Environment Agency West Area Planning 04/04/2025 25/04/2025
Highways County Highways 04/04/2025 25/04/2025
Landscape Officer WDC Landscape Officer 04/04/2025 25/04/2025
Matt Barker MHDC & WDC Carbon Reduction Project Officer 04/04/2025 25/04/2025
Midlands Region National Highways 04/04/2025 25/04/2025
Mr R Cooper Hereford & Worcester Fire Service 04/04/2025 25/04/2025
Mr S Bloomfield Worcestershire Wildlife Trust 04/04/2025 25/04/2025
Mrs E Gallagher Hindlip Parish Council 04/04/2025 25/04/2025
Mrs H Fleming Natural England 04/04/2025 25/04/2025
Ms R Clare Environment Agency 04/04/2025 25/04/2025
Policy Plans - General Policy Plans - General 04/04/2025 25/04/2025
Tree Preservation Officer WDC Tree Preservation Officer 04/04/2025 25/04/2025
WCC LLFA Planning Consultation WCC Lead Local Flood Authority 04/04/2025 25/04/2025
WDC Heritage Officer WDC Heritage Officer 04/04/2025 25/04/2025
WDC Natural Heritage & Biodiversity Officer WDC Natural Heritage & Biodiversity 04/04/2025 25/04/2025
Worcestershire Regulatory Services - Cont. Land Worcestershire Regulatory Services 04/04/2025 25/04/2025
Worcestershire Regulatory Services - Nuisance Worcestershire Regulatory Services 04/04/2025 25/04/2025
Aidan Smyth WDC - Archaeology & Planning Advisor 07/04/2025 28/04/2025 09/05/2025
Asset Protection Team Severn Trent Water Limited 07/04/2025 28/04/2025
Canal & River Trust Spatial Planning Team Canal & River Trust 07/04/2025 28/04/2025 28/04/2025
Cllr Daniel Birch North Claines & Salwarpe Ward 07/04/2025 28/04/2025
Cllr Nicolas Wright North Claines & Salwarpe Ward 07/04/2025 28/04/2025
Delegated Commissioning Team NHS Herefordshire & Worcs Integrated Care Board 07/04/2025 28/04/2025
Drainage Engineer Engineers - S.W. Land Drainage Partnership 07/04/2025 28/04/2025
Duncan Rudge - Head of Planning Worcester City Council (Planning) 07/04/2025 28/04/2025 28/04/2025
Emma Ridley Economic Development Officer 07/04/2025 28/04/2025 15/04/2025
Environment Agency West Area Planning 07/04/2025 28/04/2025 23/04/2025
Highways County Highways 07/04/2025 28/04/2025 13/10/2025
Landscape Officer WDC Landscape Officer 07/04/2025 28/04/2025 12/05/2025
Matt Barker MHDC & WDC Carbon Reduction Project Officer 07/04/2025 28/04/2025
Midlands Region National Highways 07/04/2025 28/04/2025 24/04/2025
Mr R Cooper Hereford & Worcester Fire Service 07/04/2025 28/04/2025 14/05/2025
Mr S Bloomfield Worcestershire Wildlife Trust 07/04/2025 28/04/2025
Mrs E Gallagher Hindlip Parish Council 07/04/2025 28/04/2025 22/04/2025
Mrs H Fleming Natural England 07/04/2025 28/04/2025
Ms R Clare Environment Agency 07/04/2025 28/04/2025 22/04/2025
Policy Plans - General Policy Plans - General 07/04/2025 28/04/2025 12/05/2025
Tree Preservation Officer WDC Tree Preservation Officer 07/04/2025 28/04/2025
WCC LLFA Planning Consultation WCC Lead Local Flood Authority 07/04/2025 28/04/2025 29/05/2025
WDC Heritage Officer WDC Heritage Officer 07/04/2025 28/04/2025 06/05/2025
WDC Natural Heritage & Biodiversity Officer WDC Natural Heritage & Biodiversity 07/04/2025 28/04/2025 19/05/2025
Worcestershire Regulatory Services - Cont. Land Worcestershire Regulatory Services 07/04/2025 28/04/2025 09/04/2025
Worcestershire Regulatory Services - Nuisance Worcestershire Regulatory Services 07/04/2025 28/04/2025
Highways County Highways 28/05/2025 11/06/2025
Midlands Region National Highways 28/05/2025 11/06/2025
Sport England 23/06/2025 14/07/2025
Active Travel England (ATE) Active Travel England (ATE) 21/01/2026 11/02/2026 28/01/2026

Constraints List


Constraints List
Paper: Droitwich Advertiser - Thursday
Canal and River Trust: EIA, Major Development Consultation
Canal and River Trust: Minor Development Consultation (all Dev Types EXCEPT HPs)
Canal and River Trust Inner Zone - Consult for all Dev. Types
CIL008 - Non-Urban Area
Affect setting: Worcester/Birmingham Canal Conservation Area - Hindlip
Worcester/Birmingham Canal Conservation Area - Hindlip
Contaminated Land
Flood Zone 2: Medium
Flood Zone 3: High
Green Belt
Outside SWDP Development Boundary
Section 106 Agreement
Local Wildlife Site
Surface Water: High 1 in 30 extent
Surface Water: Medium 1 in 100 extent
Surface Water: Low 1 in 1000 extent
Wind Turbines
SWDP 6: Conservation Area
SWDP 15: Designated Rural Areas
SWDP 2: Greenbelt
SWDP 5: Protect and Restore
SWDP 2: Major Developed Site In Greenbelt
SWDP 22: Sites Of Regional Or Local Wildlife Importance
Minor Aquifer